[email protected] +44 20 8123 2220 (UK) +1 732 587 5005 (US) Contact Us | FAQ |

MLNG Tiga LNG Terminal- Capacity, SPA Contracts, Construction, Capex, Companies and Trade

April 2014 | 40 pages | ID: M4944AC52C7EN
LNGAnalysis

US$ 500.00

E-mail Delivery (PDF), Hard Copy Mail Delivery, CD-ROM Mail Delivery

Download PDF Leaflet

Accepted cards
Wire Transfer
Checkout Later
Need Help? Ask a Question
The new report on MLNG Tiga LNG from LNGANALYSIS is a comprehensive report on MLNG Tiga LNG terminal. The report provides complete information across the terminal value chain from source field to carriers to import/export facilities. The report also provides detailed analysis on terminal outlook to 2020. The research work also provides details of LNG Sale- Purchase agreements associated with the terminal. Details of operators, owners along with their equity stakes and net weighted capacity details are provided during the historic and forecasted period.

Information on LNG processing (liquefaction/regasification) capacities, storage capacities, trains, tanks, jetty, associated infrastructure, pipelines are provided. Current status of the terminal along with a depictive map and capital investment details are also provided. Further, construction details are also provided for the terminal. In addition, the terminal is benchmarked with other terminals based on eight parameters.

Analysis of key shareholder companies of the terminal along with their other LNG operations and detailed business profiles are also included in the report. Further, all recent developments associated with the terminal are also included in the research work.
1 TABLE OF CONTENTS

1.1 List of Tables
1.2 List of Figures

2 MLNG TIGA TERMINAL, SNAPSHOT

3 PROJECT FEASIBILITY

4 PROSPECTIVE OF THE MLNG TIGA TERMINAL

4.1 Rank and Contribution to Country’s and Region’s Capacity
4.2 Reserves Potential
4.3 Demand for the Terminal
4.4 Highlights and Competencies of the Terminal
4.5 Potential Problems

5 MLNG TIGA- BENCHMARKING WITH OTHER KEY TERMINALS

5.1 Location Details
5.2 Operator
5.3 Commencement of Operations
5.4 Processing Technology of MLNG Tiga
5.5 Capacity in 2013/2020
5.6 Number of Processing Trains
5.7 FEED contractor/ Constructor
5.8 Capital Investment Details

6 MLNG TIGA TERMINAL MAP

7 SOURCE FIELD INFORMATION

8 MLNG TIGA TERMINAL INFORMATION

8.1 Location Details of MLNG Tiga
8.2 MLNG Tiga Commencement of Operations
8.3 Capital Investment Details of MLNG Tiga

9 LNG PROCESSING CAPACITY INFORMATION

9.1 LNG Export (Liquefaction) Capacity, 2005- 2020
9.2 No. of LNG Processing Trains, 2005- 2020

10 MLNG TIGA LNG STORAGE TANK INFORMATION

10.1 LNG Storage Capacity, 2005- 2020
10.2 No. of LNG Storage Tanks, 2005- 2020

11 LNG CARRIER INFORMATION

12 OPERATOR AND SHAREHOLDER INFORMATION

12.1 Operator
12.2 Shareholders and Equity percentages

13 MLNG TIGA TERMINAL CONSTRUCTION INFORMATION

13.1 FEED Commencement
13.2 Construction Details
13.3 Construction Contractor
13.4 Current Status

14 LNG CONTRACT INFORMATION

14.1 Contracted Capacity, 2005- 2020
14.2 Contract Information by Country

15 ANALYSIS OF KEY SHAREHOLDERS AND THEIR LNG OPERATIONS

16 RELATED NEWS AND IMPACT ON THE LNG TERMINAL

17 APPENDIX

17.1 About Us
17.2 Sources and Methodology
17.3 Contact Us
17.4 Disclaimer


More Publications