Nordic Data Center Construction Market - Industry Outlook and Forecast 2018-2023
This market research report on Nordic data center construction market offers analysis on market size & forecast, market share, industry trends, growth drivers, and vendor analysis. The market study also includes insights on segmentation by electrical construction (UPS systems, generators, transfer switch and switchgear, rack PDU, and other electrical infrastructure), by mechanical construction (cooling systems, rack, and other infrastructure), by general construction (building development, installation and commissioning, services, building design, physical security, and DCIM), and by country (Denmark, Finland, Iceland, Norway, and Sweden).
Nordic Data Center Construction Market - Overview
Availability of renewable energy source and favorable climatic conditions in countries such as Sweden, Norway, Finland, and Denmark are attributing to the growth of the Nordic data center construction market. The growing adoption of connected devices across vehicles, buildings, industrial process, and infrastructure industries in Nordic region will augment the demand for cloud and big data services resulting in the construction of new facilities in the region. The increasing investments made by telecommunication companies such as Ericsson, TeliaSonera, Telenor, Tele2, and TDC Group in submarine fiber cable projects will create lucrative opportunities for operators in the Nordic region. The increasing government efforts to improve the digital economy and using renewable energy sources to reduce operating costs will transform the market in this region. The installation of submarine cables through the North Sea, Baltic Sea and North Atlantic Ocean will increase the connectivity between Nordic countries and European region. The rising number of development projects by hyperscale operators such as Facebook, Apple, Google, Amazon Web Service, and Microsoft will significantly improve the economy of the countries in the Nordic market. The demand for public cloud and hybrid infrastructure services will create demand for colocation and managed hosting facilities in the Nordic region. Major colocation and managed service providers investing millions of dollars in the Nordic region include Equinix, Interxion, TeliaSonera, GlobalConnect, Hydro66, Multigrid, EcoDataCenter, Lefdal Mine Data Center, HETZNER, and Tieto.
Countries such as Denmark, followed by Sweden, Finland, Norway, and Iceland are the major countries promoting the development of the market in the Nordic region. The infrastructure vendors are designing and developing effective power and cooling systems which will reduce the carbon emissions to almost zero and promote sustainable operations of the facility in the Nordic market. The Nordic data center construction market is estimated to reach revenues of approximately $6 billion by 2023, growing at a CAGR of more than 8% during 2017-2023. The market size of this region is also provided by square ft. area and power capacity in MW.
Nordic Data Center Construction Market - Dynamics
The ability to reduce OPEX of facilities cooling through district heating technology will propel the growth of the Nordic data center construction market. Data centers are the largest power consumers and major contributor to the greenhouse gas emissions in the region. The use of district heating can help operators recycle the heat emitted by facilities to redistribute it to district homes in winter in the Nordic region. The concept of district heating is gaining immense popularity in the Nordic region as facilities operators and government bodies are working together to promote these schemes in the market. In 2009, Academia in Finland was built to use waste heat for cooling nearby homes. Recently, Fortum Värme, City of Stockholm, Ellevio, and Stokab has partnered for an initiative namely, Stockholm Data Parks to invest in the deployment of more projects in the region. The development of projects supplying waste heat for district heating will transform the Nordic data center construction market during the forecast period.
Nordic Data Center Construction Market - Segmentation
This market research report includes a detailed segmentation of the market by electrical construction, mechanical construction, general construction, and country.
Nordic Data Center Construction Market – By Electrical Construction
The construction of mega facilities in the region will involve procurement of high capacity UPS systems and generator typically over 500kVA during the forecast period
The Nordic data center construction market by electrical construction is segmented into UPS systems, generators, transfer switch and switchgear, rack PDU, and other electrical infrastructure. The UPS segment dominated a significant market share in 2017, growing at a CAGR of around 9% during the forecast period. Most of the hyperscale projects will involve flexible design supporting of up to Tier 4 standardswith 2N+1 redundancy in electrical infrastructure. The adoption of diesel rotary uninterruptible power supply (DRUPS) systems is gaining immense popularity in the Nordic data center construction market. These systems are designed to combine both battery and flywheel UPS topology and a diesel generator to provide backup power during outages. The high reliability, efficiency, and minimum maintenance are some of the major factors boosting the demand for these generators in the region.
Nordic Data Center Construction Market – By Mechanical Construction
The use of free cooling chillers, evaporative/adiabatic cooler will dominate the market, whereas water-based cooling for district heating will continue to grow during the forecast period
The mechanical construction segment in the Nordic data center construction market is categorized into cooling systems, rack, and other infrastructure. Racks occupied a considerable market share in 2017, growing at a CAGR of approximately 9% during the forecast period. The adoption of pre-assembled infrastructure along with rack PDUs, rack-level UPS, and IT infrastructure is gaining popularity in the Nordic data center construction market. The rise in the number of POD facilities that comprises from 1 to 20 rack units with pre-installed power and cooling infrastructure will augment the development of this segment in the Nordic data center construction market. These containment systems contain two formations that include hot aisle and cold aisle systems. The 42U rack unit is most commonly used in Nordic data centers. In recent years, rack units of 45U, 47U and 48U are installed in large facilities and the Nordic data center construction market is also witnessing a trend of using racks of different sizes in one facility in the Nordic region. Innovations in rack systems will improve productivity and efficiency of facilities in the Nordic region over the next few years.
Nordic Data Center Construction Market – By General Construction
Physical security with the sensor and video surveillance to gain traction in the Nordic data center construction market during the forecast period
The Nordic data center construction market by general construction is classified into building development, installation and commissioning, services, building design, physical security, and DCIM. There are over 40 investment location for facilities development in Finland and Stockholm Data Parks will enable the growth of greenfield developments in the region. There are also many multiple pre-approved sites in the country to complete construction within a year. Physical security segmented dominated a substantial market share in 2017, growing at an impressive CAGR of around 10% during the forecast period. The different layers of physical security systems in facilities consist of perimeter security, building security, data hall security, and rack-level security. The use of sensors integrated with DCIM solutions for real-time remote monitoring benefits will propel the demand for solutions in this segment in the Nordic data center construction market. The operators in the Nordic region are offering video surveillance analytics, modern centers protected from EMP and lightning during natural disasters, and innovative connected security products to attract new consumers and gain a larger market share. The increasing use of robot monitoring systems in the facility, with the sensor and video surveillance, will revolutionize the Nordic data center construction market during the forecast period.
Nordic Data Center Construction Market – By Country
Denmark’s reduce electricity tax rates to propel development in the Nordic data center construction market during the forecast period
The country segmentation in the Nordic data center construction market is divided into Denmark, Finland, Iceland, Norway, and Sweden. Denmark dominated over half of the market share in 2017, growing at a CAGR of more than 4% during the forecast period. The increasing investment by hyperscale operators such as Facebook, Bulk Infrastructure, and Google on the Havfrue/AEC-2 submarine fiber cable will fuel the growth of this region in the Nordic market. Furthermore, the presence of multiple colocation providers such as Colt Technology Services, Interxion, TeliaSonera, and CenturyLink, will boost revenues in Denmark during the forecast period. The increasing adoption of cloud-based services across the country and Denmark’s close proximity to other European countries will help vendors expand their businesses in the Nordic market. The Stockholm Data Park initiative has the potential to grow facilities investment in Sweden over the next few years.
Key Vendor Analysis
The Nordic data center construction market is driven by the increasing number of greenfield and modular facilitiesdeployment in the region. The multiple innovations focused on reducing power consumption, water consumption, and carbon dioxide emissions will create new opportunities for leading vendors in the Nordic market. The development of energy-efficient infrastructure will help prominent players gain larger market share in the Nordic region. The growing demand for higher capacity systems in redundancy configuration of 2N for power infrastructure across multiple facilities will create lucrative opportunities for top companies in the Nordic data center construction market.
The major vendors in the market are:
Key market insights include
1. The analysis of Nordic data center construction market provides market size and growth rate for the forecast period 2018-2023.
2. It offers comprehensive insights on current industry trends, trend forecast, and growth drivers about the Nordic data center construction market.
3. The report provides the latest analysis of market share, growth drivers, challenges, and investment opportunities.
4. It offers a complete overview of market segments and the regional outlook of the Nordic data center construction market.
5. The report offers a detailed overview of the vendor landscape, competitive analysis, and key market strategies to gain competitive advantage.
The Nordic data center construction market size is expected to reach revenues of around $6 billion by 2023, growing at a CAGR of more than 8% 2018–2023.
The Nordic data center construction market is driven by the development of hyperscale facilities spanning over 200,000 square feet and rack power density of up to 40kW. The deployment of modular facilities integrated power and cooling components into containment solutions or rack-level modular solutions will transform the Nordic data center construction market. The market research report provides in-depth market analysis and segmental analysis of the Nordic data center construction market by product, distribution channel, material, and geography.
Major Vendors in the Nordic Data Center Construction Market
Nordic Data Center Construction Market - Overview
Availability of renewable energy source and favorable climatic conditions in countries such as Sweden, Norway, Finland, and Denmark are attributing to the growth of the Nordic data center construction market. The growing adoption of connected devices across vehicles, buildings, industrial process, and infrastructure industries in Nordic region will augment the demand for cloud and big data services resulting in the construction of new facilities in the region. The increasing investments made by telecommunication companies such as Ericsson, TeliaSonera, Telenor, Tele2, and TDC Group in submarine fiber cable projects will create lucrative opportunities for operators in the Nordic region. The increasing government efforts to improve the digital economy and using renewable energy sources to reduce operating costs will transform the market in this region. The installation of submarine cables through the North Sea, Baltic Sea and North Atlantic Ocean will increase the connectivity between Nordic countries and European region. The rising number of development projects by hyperscale operators such as Facebook, Apple, Google, Amazon Web Service, and Microsoft will significantly improve the economy of the countries in the Nordic market. The demand for public cloud and hybrid infrastructure services will create demand for colocation and managed hosting facilities in the Nordic region. Major colocation and managed service providers investing millions of dollars in the Nordic region include Equinix, Interxion, TeliaSonera, GlobalConnect, Hydro66, Multigrid, EcoDataCenter, Lefdal Mine Data Center, HETZNER, and Tieto.
Countries such as Denmark, followed by Sweden, Finland, Norway, and Iceland are the major countries promoting the development of the market in the Nordic region. The infrastructure vendors are designing and developing effective power and cooling systems which will reduce the carbon emissions to almost zero and promote sustainable operations of the facility in the Nordic market. The Nordic data center construction market is estimated to reach revenues of approximately $6 billion by 2023, growing at a CAGR of more than 8% during 2017-2023. The market size of this region is also provided by square ft. area and power capacity in MW.
Nordic Data Center Construction Market - Dynamics
The ability to reduce OPEX of facilities cooling through district heating technology will propel the growth of the Nordic data center construction market. Data centers are the largest power consumers and major contributor to the greenhouse gas emissions in the region. The use of district heating can help operators recycle the heat emitted by facilities to redistribute it to district homes in winter in the Nordic region. The concept of district heating is gaining immense popularity in the Nordic region as facilities operators and government bodies are working together to promote these schemes in the market. In 2009, Academia in Finland was built to use waste heat for cooling nearby homes. Recently, Fortum Värme, City of Stockholm, Ellevio, and Stokab has partnered for an initiative namely, Stockholm Data Parks to invest in the deployment of more projects in the region. The development of projects supplying waste heat for district heating will transform the Nordic data center construction market during the forecast period.
Nordic Data Center Construction Market - Segmentation
This market research report includes a detailed segmentation of the market by electrical construction, mechanical construction, general construction, and country.
Nordic Data Center Construction Market – By Electrical Construction
The construction of mega facilities in the region will involve procurement of high capacity UPS systems and generator typically over 500kVA during the forecast period
The Nordic data center construction market by electrical construction is segmented into UPS systems, generators, transfer switch and switchgear, rack PDU, and other electrical infrastructure. The UPS segment dominated a significant market share in 2017, growing at a CAGR of around 9% during the forecast period. Most of the hyperscale projects will involve flexible design supporting of up to Tier 4 standardswith 2N+1 redundancy in electrical infrastructure. The adoption of diesel rotary uninterruptible power supply (DRUPS) systems is gaining immense popularity in the Nordic data center construction market. These systems are designed to combine both battery and flywheel UPS topology and a diesel generator to provide backup power during outages. The high reliability, efficiency, and minimum maintenance are some of the major factors boosting the demand for these generators in the region.
Nordic Data Center Construction Market – By Mechanical Construction
The use of free cooling chillers, evaporative/adiabatic cooler will dominate the market, whereas water-based cooling for district heating will continue to grow during the forecast period
The mechanical construction segment in the Nordic data center construction market is categorized into cooling systems, rack, and other infrastructure. Racks occupied a considerable market share in 2017, growing at a CAGR of approximately 9% during the forecast period. The adoption of pre-assembled infrastructure along with rack PDUs, rack-level UPS, and IT infrastructure is gaining popularity in the Nordic data center construction market. The rise in the number of POD facilities that comprises from 1 to 20 rack units with pre-installed power and cooling infrastructure will augment the development of this segment in the Nordic data center construction market. These containment systems contain two formations that include hot aisle and cold aisle systems. The 42U rack unit is most commonly used in Nordic data centers. In recent years, rack units of 45U, 47U and 48U are installed in large facilities and the Nordic data center construction market is also witnessing a trend of using racks of different sizes in one facility in the Nordic region. Innovations in rack systems will improve productivity and efficiency of facilities in the Nordic region over the next few years.
Nordic Data Center Construction Market – By General Construction
Physical security with the sensor and video surveillance to gain traction in the Nordic data center construction market during the forecast period
The Nordic data center construction market by general construction is classified into building development, installation and commissioning, services, building design, physical security, and DCIM. There are over 40 investment location for facilities development in Finland and Stockholm Data Parks will enable the growth of greenfield developments in the region. There are also many multiple pre-approved sites in the country to complete construction within a year. Physical security segmented dominated a substantial market share in 2017, growing at an impressive CAGR of around 10% during the forecast period. The different layers of physical security systems in facilities consist of perimeter security, building security, data hall security, and rack-level security. The use of sensors integrated with DCIM solutions for real-time remote monitoring benefits will propel the demand for solutions in this segment in the Nordic data center construction market. The operators in the Nordic region are offering video surveillance analytics, modern centers protected from EMP and lightning during natural disasters, and innovative connected security products to attract new consumers and gain a larger market share. The increasing use of robot monitoring systems in the facility, with the sensor and video surveillance, will revolutionize the Nordic data center construction market during the forecast period.
Nordic Data Center Construction Market – By Country
Denmark’s reduce electricity tax rates to propel development in the Nordic data center construction market during the forecast period
The country segmentation in the Nordic data center construction market is divided into Denmark, Finland, Iceland, Norway, and Sweden. Denmark dominated over half of the market share in 2017, growing at a CAGR of more than 4% during the forecast period. The increasing investment by hyperscale operators such as Facebook, Bulk Infrastructure, and Google on the Havfrue/AEC-2 submarine fiber cable will fuel the growth of this region in the Nordic market. Furthermore, the presence of multiple colocation providers such as Colt Technology Services, Interxion, TeliaSonera, and CenturyLink, will boost revenues in Denmark during the forecast period. The increasing adoption of cloud-based services across the country and Denmark’s close proximity to other European countries will help vendors expand their businesses in the Nordic market. The Stockholm Data Park initiative has the potential to grow facilities investment in Sweden over the next few years.
Key Vendor Analysis
The Nordic data center construction market is driven by the increasing number of greenfield and modular facilitiesdeployment in the region. The multiple innovations focused on reducing power consumption, water consumption, and carbon dioxide emissions will create new opportunities for leading vendors in the Nordic market. The development of energy-efficient infrastructure will help prominent players gain larger market share in the Nordic region. The growing demand for higher capacity systems in redundancy configuration of 2N for power infrastructure across multiple facilities will create lucrative opportunities for top companies in the Nordic data center construction market.
The major vendors in the market are:
- By Infrastructure Provider
- ABB
- Eaton
- Rittal
- Schneider Electric
- STULZ
- Vertiv
- By Construction Contractor
- AECOM
- DPR Construction
- HDR Architecture
- MACE Group
- Mercury Engineering
- NCC
- Skanska
Key market insights include
1. The analysis of Nordic data center construction market provides market size and growth rate for the forecast period 2018-2023.
2. It offers comprehensive insights on current industry trends, trend forecast, and growth drivers about the Nordic data center construction market.
3. The report provides the latest analysis of market share, growth drivers, challenges, and investment opportunities.
4. It offers a complete overview of market segments and the regional outlook of the Nordic data center construction market.
5. The report offers a detailed overview of the vendor landscape, competitive analysis, and key market strategies to gain competitive advantage.
The Nordic data center construction market size is expected to reach revenues of around $6 billion by 2023, growing at a CAGR of more than 8% 2018–2023.
The Nordic data center construction market is driven by the development of hyperscale facilities spanning over 200,000 square feet and rack power density of up to 40kW. The deployment of modular facilities integrated power and cooling components into containment solutions or rack-level modular solutions will transform the Nordic data center construction market. The market research report provides in-depth market analysis and segmental analysis of the Nordic data center construction market by product, distribution channel, material, and geography.
- Base Year: 2017
- Forecast Year: 2018–2023
Major Vendors in the Nordic Data Center Construction Market
- By Infrastructure Provider
- ABB
- Eaton
- Rittal
- Schneider Electric
- STULZ
- Vertiv
- By Construction Contractor
- AECOM
- DPR Construction
- HDR Architecture
- MACE Group
- Mercury Engineering
- NCC
- Skanska
- By Infrastructure Provider
- Airedale Air Conditioning
- Alfa Laval
- Caterpillar
- Condair Group
- Cummins
- GE
- HPE
- Huawei
- MTU On Site Energy
- Socomec Group
- Systemair
- Swegon
- By Construction Contractor
- Arup Group
- AFEC International
- Bravida
- COWI
- Dornan
- ENACO
- Etix Everywhere
- Flex Enclosure
- Fortis Construction
- Granlund
- MTH GROUP
- Ramboll
- Royal HaskoningDHV
- SRV Group
- Sweco
- UPS systems
- Generators
- Transfer Switch and Switchgear
- Rack PDU
- Other Electrical Infrastructure
- Cooling Systems
- Rack
- Other Infrastructure
- CRAC & CRAH Systems
- Chillers
- Cooling Towers & Dry Coolers
- Economizer & Evaporative Coolers
- Other Cooling Units
- Air-based Cooling Technique
- Liquid-based Cooling Technique
- Building Development
- Installation & Commissioning
- Building Design
- Physical Security
- DCIM
- Denmark
- Finland
- Iceland
- Norway
- Sweden
1 RESEARCH METHODOLOGY
2 RESEARCH OBJECTIVES
3 RESEARCH PROCESS
4 REPORT COVERAGE
4.1 Market Definition
4.2 Base Year
4.3 Scope of Study
4.3.1 Market Segmentation by Infrastructure
4.3.2 Market Segmentation by Electrical Infrastructure
4.3.3 Market Segmentation by Mechanical Infrastructure
4.3.4 Market Segmentation by General Construction
4.3.5 Market Segmentation by Geography
5 REPORT ASSUMPTIONS & CAVEATS
5.1 Key Caveats
5.2 Currency Conversion
5.3 Market Derivation
6 MARKET AT A GLANCE
7 INTRODUCTION
7.1 Growth of Internet
7.2 Electricity Prices
7.3 Submarine Cable
7.4 Data Center Site Selection Criteria
8 MARKET DYNAMICS
8.1 Market Growth Enablers
8.1.1 Increased Demand for Cloud Computing
8.1.2 Growth in Customer Base for Colocation Providers and Managed Service Providers
8.1.3 Availability of Renewable Energy Sources
8.1.4 Free Cooling Facilitates Operating Data Centers at Low PUE
8.1.5 Tax Incentives and Availability of Land for Development
8.1.6 YOY Impact of Market Growth Enablers
8.2 Market Growth Restraints
8.2.1 Lack of Skilled Workforce
8.2.2 Procurement Cost of Efficient Infrastructure
8.2.3 Physical Security Constraints
8.2.4 YOY Impact of Market Growth Restraints
8.3 Market Opportunities & Trends
8.3.1 Increasing Popularity of District Heating Concept
8.3.2 Growing Construction of Cryptocurrency Data Centers
8.3.3 Increasing Construction of Hyperscale Data Center Facilities
8.3.4 Rising Modular Data Center Deployment
8.3.5 YOY Impact of Market Opportunities & Trends
9 DATA CENTER CONSTRUCTION MARKET IN NORDIC
9.1 Market Overview
9.2 Market Size & Forecast
9.3 Porter’s Five Forces Analysis
9.3.1 Threat of New Entrants
9.3.2 Bargaining Power of Suppliers
9.3.3 Bargaining Power of Buyers
9.3.4 Threat of Substitutes
9.3.5 Competitive Rivalry
10 MARKET BY INFRASTRUCTURE TYPE
10.1 Market Overview
10.2 Market in Nordic by Electrical Infrastructure
10.2.1 Market Overview
10.2.2 Market Size & Forecast
10.3 Market in Nordic by Mechanical Infrastructure
10.3.1 Market Overview
10.3.2 Market Size & Forecast
10.4 Market in Nordic by General Construction
10.4.1 Market Overview
10.4.2 Market Size & Forecast
11 MARKET BY ELECTRICAL INFRASTRUCTURE
11.1 Uninterruptible Power Supply (UPS)
11.1.1 Market Overview
11.1.2 Market Size & Forecast
11.2 Generators
11.2.1 Market Overview
11.2.2 Market Size & Forecast
11.3 Transfer Switches & Switchgears
11.3.1 Market Overview
11.3.2 Market Size & Forecast
11.4 Rack Power Distribution Unit (PDU)
11.4.1 Market Overview
11.4.2 Market Size & Forecast
11.5 Other Electrical Infrastructure
11.5.1 Market Overview
11.5.2 Market Size & Forecast
12 MARKET BY MECHANICAL INFRASTRUCTURE
12.1 Market Overview
12.2 Cooling Systems
12.2.1 Market Size & Forecast
12.3 Racks
12.3.1 Market Overview
12.3.2 Market Size & Forecast
12.4 Other Infrastructure
12.4.1 Market Size & Forecast
13 MARKET BY COOLING SYSTEMS
13.1 CRAC and CRAH Units
13.1.1 Market Overview
13.1.2 Market Size & Forecast
13.2 Chiller Units
13.2.1 Market Overview
13.2.2 Market Size & Forecast
13.3 Cooling Towers and Dry Coolers
13.3.1 Market Overview
13.3.2 Market Size & Forecast
13.4 Economizers and Evaporative Coolers
13.4.1 Market Overview
13.4.2 Market Size & Forecast
13.5 Other Cooling Units
13.5.1 Market Overview
13.5.2 Market Size & Forecast
14 MARKET BY COOLING TECHNIQUE
14.1 Air-Based Cooling Techniques
14.1.1 Market Size & Forecast
14.2 Water-Based Cooling Techniques
14.2.1 Market Size & Forecast
15 MARKET BY GENERAL CONSTRUCTION
15.1.1 Market Overview
15.1.2 Market Size & Forecast
15.2 Installation and commissioning Services
15.2.1 Market Overview
15.2.2 Market Size & Forecast
15.3 Building Design
15.3.1 Market Overview
15.3.2 Market Size & Forecast
15.4 Physical Security
15.4.1 Market Overview
15.4.2 Market Size & Forecast
15.5 Data Center Infrastructure Management (DCIM)
15.5.1 Market Overview
15.5.2 Market Size & Forecast
16 DATA CENTER CONSTRUCTION MARKET BY COUNTRIES
16.1 Site Selection Criteria Analysis By Countries
17 DENMARK
17.1 Market Overview
17.2 Market Size & Forecast
17.3 Market by Type of Construction
17.3.1 Electrical Infrastructure: Market Size & Forecast
17.3.2 Mechanical Infrastructure: Market Size & Forecast
17.3.3 General Construction: Market Size & Forecast
18 FINLAND
18.1 Market Overview
18.2 Market Size & Forecast
18.3 Market by Type of Construction
18.3.1 Electrical Infrastructure: Market Size & Forecast
18.3.2 Mechanical Infrastructure: Market Size & Forecast
18.3.3 General Construction: Market Size & Forecast
19 ICELAND
19.1 Market Overview
19.2 Market Size & Forecast
19.3 Market by Type of Construction
19.3.1 Electrical Infrastructure: Market Size & Forecast
19.3.2 Mechanical Infrastructure: Market Size & Forecast
19.3.3 General Construction: Market Size & Forecast
20 NORWAY
20.1 Market Overview
20.2 Market Size & Forecast
20.3 Market by Type of Construction
20.3.1 Electrical Infrastructure: Market Size & Forecast
20.3.2 Mechanical Infrastructure: Market Size & Forecast
20.3.3 General Construction: Market Size & Forecast
21 SWEDEN
21.1 Market Overview
21.2 Market Size & Forecast
21.3 Market by Type of Construction
21.3.1 Electrical Infrastructure: Market Size & Forecast
21.3.2 Mechanical Infrastructure: Market Size & Forecast
21.3.3 General Construction: Market Size & Forecast
22 COMPETITIVE SCENARIO
22.1 Electrical Infrastructure
22.2 Mechanical Infrastructure
22.3 General Construction
23 KEY DATA CENTER INFRASTRUCTURE PROVIDERS
23.1 ABB
23.1.1 Overview
23.1.2 Product offerings
23.1.3 Key News
23.2 Eaton
23.2.1 Overview
23.2.2 Product Offerings
23.2.3 Key News
23.3 Rittal
23.3.1 Overview
23.3.2 Product Offerings
23.3.3 Key News
23.4 Schneider Electric
23.4.1 Overview
23.4.2 Product Offerings
23.4.3 Key News
23.5 STULZ
23.5.1 Overview
23.5.2 Product Offerings
23.5.3 Key News
23.6 Vertiv
23.6.1 Overview
23.6.2 Product Offerings
23.6.3 Key News
24 KEY DATA CENTER CONSTRUCTION CONTRACTORS
24.1 AECOM
24.1.1 Overview
24.1.2 Service offerings
24.2 DPR Construction
24.2.1 Overview
24.2.2 Service Offerings
24.3 HDR Architecture
24.3.1 Overview
24.3.2 Service Offerings
24.4 MACE Group
24.4.1 Service Offerings
24.5 Mercury Engineering
24.5.1 Service Offerings
24.6 NCC
24.6.1 Service Offerings
24.7 Skanska
24.7.1 Service Offerings
25 OTHER PROMINENT INFRASTRUCTURE PROVIDERS
25.1 Airedale Air Conditioning
25.1.1 Product Offerings
25.2 Alfa Laval
25.2.1 Product offerings
25.3 Caterpillar
25.3.1 Overview
25.3.2 Product Offerings
25.4 Condair Group
25.4.1 Product Offerings
25.5 Cummins
25.5.1 Overview
25.5.2 Product offerings
25.6 General Electric (GE)
25.6.1 Product Offerings
25.7 HP Enterprise (HPE)
25.7.1 Product Offerings
25.8 Huawei
25.8.1 Product Offerings
25.9 MTU ONSITE ENERGY (Rolls-Royce Power Systems AG)
25.9.1 Product Offerings
25.1 Socomec
25.10.1 Product Offerings
25.11 Systemair AB
25.11.1 Product Offerings
25.12 Swegon
25.12.1 Product Offerings
26 OTHER PROMINENT CONSTRUCTION CONTRACTORS
26.1 Arup Group
26.1.1 Service Offerings
26.2 AFEC International
26.2.1 Service Offerings
26.3 Bravida
26.3.1 Service Offerings
26.4 COWI
26.4.1 Service Offerings
26.5 Dornan
26.5.1 Service Offerings
26.6 Enaco
26.6.1 Service Offerings
26.7 Etix Everywhere
26.7.1 Products and Service Offerings
26.8 Flex Enclosure
26.8.1 Products and Service Offerings
26.9 Granlund
26.9.1 Service Offerings
26.10 MTH Group
26.10.1 Service Offerings
26.11 Ramboll
26.11.1 Service Offerings
26.12 Royal HaskoningDHV
26.12.1 Service Offerings
26.13 SRV Group
26.13.1 Service Offerings
26.14 Sweco
26.14.1 Service Offerings
27 REPORT SUMMARY
27.1 Key Takeaways
27.2 Strategic Recommendations
27.3 Qualitative Summary
27.4 Quantitative Summary
27.4.1 Overall Market
27.4.2 Market by Country
27.4.3 Market by Area
27.4.4 Market by Power Capacity
27.4.5 Market by Construction Type
27.4.6 Market by Electrical Infrastructure
27.4.7 Mechanical Infrastructure
27.4.8 Market by Cooling Systems
27.4.9 Market by Cooling Technique
27.4.10 Market by General Construction
27.4.11 Market by Denmark
27.4.12 Market by Finland
27.4.13 Market by Iceland
27.4.14 Market by Norway
27.4.15 Market by Sweden
28 APPENDIX
28.1 Abbreviations
2 RESEARCH OBJECTIVES
3 RESEARCH PROCESS
4 REPORT COVERAGE
4.1 Market Definition
4.2 Base Year
4.3 Scope of Study
4.3.1 Market Segmentation by Infrastructure
4.3.2 Market Segmentation by Electrical Infrastructure
4.3.3 Market Segmentation by Mechanical Infrastructure
4.3.4 Market Segmentation by General Construction
4.3.5 Market Segmentation by Geography
5 REPORT ASSUMPTIONS & CAVEATS
5.1 Key Caveats
5.2 Currency Conversion
5.3 Market Derivation
6 MARKET AT A GLANCE
7 INTRODUCTION
7.1 Growth of Internet
7.2 Electricity Prices
7.3 Submarine Cable
7.4 Data Center Site Selection Criteria
8 MARKET DYNAMICS
8.1 Market Growth Enablers
8.1.1 Increased Demand for Cloud Computing
8.1.2 Growth in Customer Base for Colocation Providers and Managed Service Providers
8.1.3 Availability of Renewable Energy Sources
8.1.4 Free Cooling Facilitates Operating Data Centers at Low PUE
8.1.5 Tax Incentives and Availability of Land for Development
8.1.6 YOY Impact of Market Growth Enablers
8.2 Market Growth Restraints
8.2.1 Lack of Skilled Workforce
8.2.2 Procurement Cost of Efficient Infrastructure
8.2.3 Physical Security Constraints
8.2.4 YOY Impact of Market Growth Restraints
8.3 Market Opportunities & Trends
8.3.1 Increasing Popularity of District Heating Concept
8.3.2 Growing Construction of Cryptocurrency Data Centers
8.3.3 Increasing Construction of Hyperscale Data Center Facilities
8.3.4 Rising Modular Data Center Deployment
8.3.5 YOY Impact of Market Opportunities & Trends
9 DATA CENTER CONSTRUCTION MARKET IN NORDIC
9.1 Market Overview
9.2 Market Size & Forecast
9.3 Porter’s Five Forces Analysis
9.3.1 Threat of New Entrants
9.3.2 Bargaining Power of Suppliers
9.3.3 Bargaining Power of Buyers
9.3.4 Threat of Substitutes
9.3.5 Competitive Rivalry
10 MARKET BY INFRASTRUCTURE TYPE
10.1 Market Overview
10.2 Market in Nordic by Electrical Infrastructure
10.2.1 Market Overview
10.2.2 Market Size & Forecast
10.3 Market in Nordic by Mechanical Infrastructure
10.3.1 Market Overview
10.3.2 Market Size & Forecast
10.4 Market in Nordic by General Construction
10.4.1 Market Overview
10.4.2 Market Size & Forecast
11 MARKET BY ELECTRICAL INFRASTRUCTURE
11.1 Uninterruptible Power Supply (UPS)
11.1.1 Market Overview
11.1.2 Market Size & Forecast
11.2 Generators
11.2.1 Market Overview
11.2.2 Market Size & Forecast
11.3 Transfer Switches & Switchgears
11.3.1 Market Overview
11.3.2 Market Size & Forecast
11.4 Rack Power Distribution Unit (PDU)
11.4.1 Market Overview
11.4.2 Market Size & Forecast
11.5 Other Electrical Infrastructure
11.5.1 Market Overview
11.5.2 Market Size & Forecast
12 MARKET BY MECHANICAL INFRASTRUCTURE
12.1 Market Overview
12.2 Cooling Systems
12.2.1 Market Size & Forecast
12.3 Racks
12.3.1 Market Overview
12.3.2 Market Size & Forecast
12.4 Other Infrastructure
12.4.1 Market Size & Forecast
13 MARKET BY COOLING SYSTEMS
13.1 CRAC and CRAH Units
13.1.1 Market Overview
13.1.2 Market Size & Forecast
13.2 Chiller Units
13.2.1 Market Overview
13.2.2 Market Size & Forecast
13.3 Cooling Towers and Dry Coolers
13.3.1 Market Overview
13.3.2 Market Size & Forecast
13.4 Economizers and Evaporative Coolers
13.4.1 Market Overview
13.4.2 Market Size & Forecast
13.5 Other Cooling Units
13.5.1 Market Overview
13.5.2 Market Size & Forecast
14 MARKET BY COOLING TECHNIQUE
14.1 Air-Based Cooling Techniques
14.1.1 Market Size & Forecast
14.2 Water-Based Cooling Techniques
14.2.1 Market Size & Forecast
15 MARKET BY GENERAL CONSTRUCTION
15.1.1 Market Overview
15.1.2 Market Size & Forecast
15.2 Installation and commissioning Services
15.2.1 Market Overview
15.2.2 Market Size & Forecast
15.3 Building Design
15.3.1 Market Overview
15.3.2 Market Size & Forecast
15.4 Physical Security
15.4.1 Market Overview
15.4.2 Market Size & Forecast
15.5 Data Center Infrastructure Management (DCIM)
15.5.1 Market Overview
15.5.2 Market Size & Forecast
16 DATA CENTER CONSTRUCTION MARKET BY COUNTRIES
16.1 Site Selection Criteria Analysis By Countries
17 DENMARK
17.1 Market Overview
17.2 Market Size & Forecast
17.3 Market by Type of Construction
17.3.1 Electrical Infrastructure: Market Size & Forecast
17.3.2 Mechanical Infrastructure: Market Size & Forecast
17.3.3 General Construction: Market Size & Forecast
18 FINLAND
18.1 Market Overview
18.2 Market Size & Forecast
18.3 Market by Type of Construction
18.3.1 Electrical Infrastructure: Market Size & Forecast
18.3.2 Mechanical Infrastructure: Market Size & Forecast
18.3.3 General Construction: Market Size & Forecast
19 ICELAND
19.1 Market Overview
19.2 Market Size & Forecast
19.3 Market by Type of Construction
19.3.1 Electrical Infrastructure: Market Size & Forecast
19.3.2 Mechanical Infrastructure: Market Size & Forecast
19.3.3 General Construction: Market Size & Forecast
20 NORWAY
20.1 Market Overview
20.2 Market Size & Forecast
20.3 Market by Type of Construction
20.3.1 Electrical Infrastructure: Market Size & Forecast
20.3.2 Mechanical Infrastructure: Market Size & Forecast
20.3.3 General Construction: Market Size & Forecast
21 SWEDEN
21.1 Market Overview
21.2 Market Size & Forecast
21.3 Market by Type of Construction
21.3.1 Electrical Infrastructure: Market Size & Forecast
21.3.2 Mechanical Infrastructure: Market Size & Forecast
21.3.3 General Construction: Market Size & Forecast
22 COMPETITIVE SCENARIO
22.1 Electrical Infrastructure
22.2 Mechanical Infrastructure
22.3 General Construction
23 KEY DATA CENTER INFRASTRUCTURE PROVIDERS
23.1 ABB
23.1.1 Overview
23.1.2 Product offerings
23.1.3 Key News
23.2 Eaton
23.2.1 Overview
23.2.2 Product Offerings
23.2.3 Key News
23.3 Rittal
23.3.1 Overview
23.3.2 Product Offerings
23.3.3 Key News
23.4 Schneider Electric
23.4.1 Overview
23.4.2 Product Offerings
23.4.3 Key News
23.5 STULZ
23.5.1 Overview
23.5.2 Product Offerings
23.5.3 Key News
23.6 Vertiv
23.6.1 Overview
23.6.2 Product Offerings
23.6.3 Key News
24 KEY DATA CENTER CONSTRUCTION CONTRACTORS
24.1 AECOM
24.1.1 Overview
24.1.2 Service offerings
24.2 DPR Construction
24.2.1 Overview
24.2.2 Service Offerings
24.3 HDR Architecture
24.3.1 Overview
24.3.2 Service Offerings
24.4 MACE Group
24.4.1 Service Offerings
24.5 Mercury Engineering
24.5.1 Service Offerings
24.6 NCC
24.6.1 Service Offerings
24.7 Skanska
24.7.1 Service Offerings
25 OTHER PROMINENT INFRASTRUCTURE PROVIDERS
25.1 Airedale Air Conditioning
25.1.1 Product Offerings
25.2 Alfa Laval
25.2.1 Product offerings
25.3 Caterpillar
25.3.1 Overview
25.3.2 Product Offerings
25.4 Condair Group
25.4.1 Product Offerings
25.5 Cummins
25.5.1 Overview
25.5.2 Product offerings
25.6 General Electric (GE)
25.6.1 Product Offerings
25.7 HP Enterprise (HPE)
25.7.1 Product Offerings
25.8 Huawei
25.8.1 Product Offerings
25.9 MTU ONSITE ENERGY (Rolls-Royce Power Systems AG)
25.9.1 Product Offerings
25.1 Socomec
25.10.1 Product Offerings
25.11 Systemair AB
25.11.1 Product Offerings
25.12 Swegon
25.12.1 Product Offerings
26 OTHER PROMINENT CONSTRUCTION CONTRACTORS
26.1 Arup Group
26.1.1 Service Offerings
26.2 AFEC International
26.2.1 Service Offerings
26.3 Bravida
26.3.1 Service Offerings
26.4 COWI
26.4.1 Service Offerings
26.5 Dornan
26.5.1 Service Offerings
26.6 Enaco
26.6.1 Service Offerings
26.7 Etix Everywhere
26.7.1 Products and Service Offerings
26.8 Flex Enclosure
26.8.1 Products and Service Offerings
26.9 Granlund
26.9.1 Service Offerings
26.10 MTH Group
26.10.1 Service Offerings
26.11 Ramboll
26.11.1 Service Offerings
26.12 Royal HaskoningDHV
26.12.1 Service Offerings
26.13 SRV Group
26.13.1 Service Offerings
26.14 Sweco
26.14.1 Service Offerings
27 REPORT SUMMARY
27.1 Key Takeaways
27.2 Strategic Recommendations
27.3 Qualitative Summary
27.4 Quantitative Summary
27.4.1 Overall Market
27.4.2 Market by Country
27.4.3 Market by Area
27.4.4 Market by Power Capacity
27.4.5 Market by Construction Type
27.4.6 Market by Electrical Infrastructure
27.4.7 Mechanical Infrastructure
27.4.8 Market by Cooling Systems
27.4.9 Market by Cooling Technique
27.4.10 Market by General Construction
27.4.11 Market by Denmark
27.4.12 Market by Finland
27.4.13 Market by Iceland
27.4.14 Market by Norway
27.4.15 Market by Sweden
28 APPENDIX
28.1 Abbreviations
LIST OF EXHIBITS
Exhibit 1 Segmentation of Data Center Market in Nordic
Exhibit 2 Key Geographies Definition
Exhibit 3 Market Size Calculation Approach 2017
Exhibit 4 Internet Growth in Nordics 2017
Exhibit 5 Pricing of Data Center Electricity in the Nordic Region (per kWh)
Exhibit 6 Data Center Site Selection Criteria and Weightage in Nordic Regions
Exhibit 7 Data Center Construction Market in Nordic 2017–2023 ($ billion)
Exhibit 8 Data Center Construction Market by Area 2017–2023 (Million Sq. Ft.)
Exhibit 9 Data Center Construction Market by Power Capacity 2017–2023 (MW)
Exhibit 10 Five Forces Analysis 2017
Exhibit 11 Data Center Market in Nordic by Infrastructure 2017 & 2023
Exhibit 12 Data Center Construction Market in Nordic by Type
Exhibit 13 Data Center Construction Market in Nordic by Type (%)
Exhibit 14 Data Center Construction Market in Nordic by Electrical Infrastructure 2017–2023 ($ billion)
Exhibit 15 Data Center Construction Market in Nordic by Mechanical Infrastructure 2017–2023 ($ billion)
Exhibit 16 Data Center Construction Market in Nordic by General Construction 2017–2023 ($ billion)
Exhibit 17 Data Center Construction Market in Nordic by UPS Systems 2017−2023 ($ million)
Exhibit 18 Data Center Construction Market in Nordic by Generators 2017−2023 ($ million)
Exhibit 19 Data Center Construction Market in Nordic by Transfer Switches and Switchgears Market 2017−2023 ($ million)
Exhibit 20 Data Center Construction Market in Nordic by Rack PDU 2017−2023 ($ million)
Exhibit 21 Data Center Construction Market in Nordic by Other Electrical Infrastructure 2017−2023 ($ million)
Exhibit 22 Data Center Construction Market in Nordic by Cooling Systems 2017–2023 ($ million)
Exhibit 23 Data Center Construction Market in Nordic by Racks 2017–2023 ($ million)
Exhibit 24 Data Center Construction Market in Nordic by Other Mechanical Infrastructure 2017–2023 ($ million)
Exhibit 25 Data Center Construction Market in Nordic by CRAC and CRAH Units 2017–2023 ($ million)
Exhibit 26 Data Center Construction Market in Nordic by Chiller Units 2017–2023 ($ million)
Exhibit 27 Data Center Construction Market in Nordic by Cooling Towers and Dry Coolers 2017–2023 ($ million)
Exhibit 28 Data Center Construction Market in Nordic by Economizers and Evaporative Coolers 2017–2023 ($ million)
Exhibit 29 Data Center Construction Market in Nordic by Other Cooling Units 2017–2023 ($ million)
Exhibit 30 Data Center Construction Market in Nordic by Air-based Cooling Techniques 2017−2023 ($ million)
Exhibit 31 Data Center Construction Market in Nordic by Water-based Cooling Technique 2017–2023 ($ million)
Exhibit 32 Data Center Construction Market in Nordic by Building Development 2017–2023 ($ million)
Exhibit 33 Data Center Construction Market in Nordic by Installation and Commissioning Services 2017–2023 ($ million)
Exhibit 34 Data Center Construction Market in Nordic Market by Building Design 2017–2023 ($ million)
Exhibit 35 Data Center Construction Market in Nordic by Physical Security 2017–2023 ($ million)
Exhibit 36 Data Center Construction Market in Nordic by DCIM 2017–2023 ($ million)
Exhibit 37 Data Center Construction Market in Nordic: Site Selection Criteria and Weightage by Country
Exhibit 38 Data Center Construction Market in Denmark 2017–2023 ($ million)
Exhibit 39 Data Center Construction Market in Denmark by Area 2017–2023 (Million Sq. Ft.)
Exhibit 40 Data Center Construction Market in Denmark by Power Capacity 2017–2023 (Power in MW)
Exhibit 41 Data Center Construction Market in Denmark by Electrical Construction 2017−2023 ($ million)
Exhibit 42 Data Center Construction Market in Denmark by Mechanical Construction 2017−2023 ($ million)
Exhibit 43 Data Center Construction Market in Denmark by General Construction 2017−2023 ($ million)
Exhibit 44 Data Center Construction Market in Finland 2017–2023 ($ million)
Exhibit 45 Data Center Construction Market in Finland by Area 2017–2023 (Million Sq. Ft.)
Exhibit 46 Data Center Construction Market in Finland by Power Capacity 2017–2023 (MW)
Exhibit 47 Data Center Construction Market in Finland by Electrical Construction 2017−2023 ($ million)
Exhibit 48 Data Center Construction Market in Finland by Mechanical Construction 2017−2023 ($ million)
Exhibit 49 Data Center Construction Market in Finland by General Construction 2017−2023 ($ million)
Exhibit 50 Data Center Construction Market in Iceland 2017–2023 ($ million)
Exhibit 51 Data Center Construction Market in Iceland by Area 2017–2023 (Million Sq. Ft.)
Exhibit 52 Data Center Construction Market in Iceland by Power Capacity 2017–2023 (Power in MW)
Exhibit 53 Data Center Construction Market in Iceland by Electrical Construction 2017−2023 ($ million)
Exhibit 54 Data Center Construction Market in Iceland by Mechanical Construction 2017−2023 ($ million)
Exhibit 55 Data Center Construction Market in Iceland by General Construction 2017−2023 ($ million)
Exhibit 56 Data Center Construction Market in Norway 2017–2023 ($ million)
Exhibit 57 Data Center Construction Market in Norway by Area 2017–2023 (Million Sq. Ft.)
Exhibit 58 Data Center Construction Market in Norway by Power Capacity 2017–2023 (MW)
Exhibit 59 Data Center Construction Market in Norway by Electrical Construction 2017−2023 ($ million)
Exhibit 60 Data Center Construction Market in Norway by Mechanical Construction 2017−2023 ($ million)
Exhibit 61 Data Center Construction Market in Norway by General Construction 2017−2023 ($ million)
Exhibit 62 Data Center Construction Market in Sweden 2017–2023 ($ million)
Exhibit 63 Data Center Construction Market in Sweden by Area 2017–2023 (Million Sq. Ft.)
Exhibit 64 Data Center Construction Market in Sweden by Power Capacity 2017–2023 (MW)
Exhibit 65 Data Center Construction Market in Sweden by Electrical Construction 2017−2023 ($ million)
Exhibit 66 Data Center Construction Market in Sweden by Mechanical Construction 2017−2023 ($ million)
Exhibit 67 Data Center Construction Market in Sweden by General Construction 2017−2023 ($ million)
Exhibit 1 Segmentation of Data Center Market in Nordic
Exhibit 2 Key Geographies Definition
Exhibit 3 Market Size Calculation Approach 2017
Exhibit 4 Internet Growth in Nordics 2017
Exhibit 5 Pricing of Data Center Electricity in the Nordic Region (per kWh)
Exhibit 6 Data Center Site Selection Criteria and Weightage in Nordic Regions
Exhibit 7 Data Center Construction Market in Nordic 2017–2023 ($ billion)
Exhibit 8 Data Center Construction Market by Area 2017–2023 (Million Sq. Ft.)
Exhibit 9 Data Center Construction Market by Power Capacity 2017–2023 (MW)
Exhibit 10 Five Forces Analysis 2017
Exhibit 11 Data Center Market in Nordic by Infrastructure 2017 & 2023
Exhibit 12 Data Center Construction Market in Nordic by Type
Exhibit 13 Data Center Construction Market in Nordic by Type (%)
Exhibit 14 Data Center Construction Market in Nordic by Electrical Infrastructure 2017–2023 ($ billion)
Exhibit 15 Data Center Construction Market in Nordic by Mechanical Infrastructure 2017–2023 ($ billion)
Exhibit 16 Data Center Construction Market in Nordic by General Construction 2017–2023 ($ billion)
Exhibit 17 Data Center Construction Market in Nordic by UPS Systems 2017−2023 ($ million)
Exhibit 18 Data Center Construction Market in Nordic by Generators 2017−2023 ($ million)
Exhibit 19 Data Center Construction Market in Nordic by Transfer Switches and Switchgears Market 2017−2023 ($ million)
Exhibit 20 Data Center Construction Market in Nordic by Rack PDU 2017−2023 ($ million)
Exhibit 21 Data Center Construction Market in Nordic by Other Electrical Infrastructure 2017−2023 ($ million)
Exhibit 22 Data Center Construction Market in Nordic by Cooling Systems 2017–2023 ($ million)
Exhibit 23 Data Center Construction Market in Nordic by Racks 2017–2023 ($ million)
Exhibit 24 Data Center Construction Market in Nordic by Other Mechanical Infrastructure 2017–2023 ($ million)
Exhibit 25 Data Center Construction Market in Nordic by CRAC and CRAH Units 2017–2023 ($ million)
Exhibit 26 Data Center Construction Market in Nordic by Chiller Units 2017–2023 ($ million)
Exhibit 27 Data Center Construction Market in Nordic by Cooling Towers and Dry Coolers 2017–2023 ($ million)
Exhibit 28 Data Center Construction Market in Nordic by Economizers and Evaporative Coolers 2017–2023 ($ million)
Exhibit 29 Data Center Construction Market in Nordic by Other Cooling Units 2017–2023 ($ million)
Exhibit 30 Data Center Construction Market in Nordic by Air-based Cooling Techniques 2017−2023 ($ million)
Exhibit 31 Data Center Construction Market in Nordic by Water-based Cooling Technique 2017–2023 ($ million)
Exhibit 32 Data Center Construction Market in Nordic by Building Development 2017–2023 ($ million)
Exhibit 33 Data Center Construction Market in Nordic by Installation and Commissioning Services 2017–2023 ($ million)
Exhibit 34 Data Center Construction Market in Nordic Market by Building Design 2017–2023 ($ million)
Exhibit 35 Data Center Construction Market in Nordic by Physical Security 2017–2023 ($ million)
Exhibit 36 Data Center Construction Market in Nordic by DCIM 2017–2023 ($ million)
Exhibit 37 Data Center Construction Market in Nordic: Site Selection Criteria and Weightage by Country
Exhibit 38 Data Center Construction Market in Denmark 2017–2023 ($ million)
Exhibit 39 Data Center Construction Market in Denmark by Area 2017–2023 (Million Sq. Ft.)
Exhibit 40 Data Center Construction Market in Denmark by Power Capacity 2017–2023 (Power in MW)
Exhibit 41 Data Center Construction Market in Denmark by Electrical Construction 2017−2023 ($ million)
Exhibit 42 Data Center Construction Market in Denmark by Mechanical Construction 2017−2023 ($ million)
Exhibit 43 Data Center Construction Market in Denmark by General Construction 2017−2023 ($ million)
Exhibit 44 Data Center Construction Market in Finland 2017–2023 ($ million)
Exhibit 45 Data Center Construction Market in Finland by Area 2017–2023 (Million Sq. Ft.)
Exhibit 46 Data Center Construction Market in Finland by Power Capacity 2017–2023 (MW)
Exhibit 47 Data Center Construction Market in Finland by Electrical Construction 2017−2023 ($ million)
Exhibit 48 Data Center Construction Market in Finland by Mechanical Construction 2017−2023 ($ million)
Exhibit 49 Data Center Construction Market in Finland by General Construction 2017−2023 ($ million)
Exhibit 50 Data Center Construction Market in Iceland 2017–2023 ($ million)
Exhibit 51 Data Center Construction Market in Iceland by Area 2017–2023 (Million Sq. Ft.)
Exhibit 52 Data Center Construction Market in Iceland by Power Capacity 2017–2023 (Power in MW)
Exhibit 53 Data Center Construction Market in Iceland by Electrical Construction 2017−2023 ($ million)
Exhibit 54 Data Center Construction Market in Iceland by Mechanical Construction 2017−2023 ($ million)
Exhibit 55 Data Center Construction Market in Iceland by General Construction 2017−2023 ($ million)
Exhibit 56 Data Center Construction Market in Norway 2017–2023 ($ million)
Exhibit 57 Data Center Construction Market in Norway by Area 2017–2023 (Million Sq. Ft.)
Exhibit 58 Data Center Construction Market in Norway by Power Capacity 2017–2023 (MW)
Exhibit 59 Data Center Construction Market in Norway by Electrical Construction 2017−2023 ($ million)
Exhibit 60 Data Center Construction Market in Norway by Mechanical Construction 2017−2023 ($ million)
Exhibit 61 Data Center Construction Market in Norway by General Construction 2017−2023 ($ million)
Exhibit 62 Data Center Construction Market in Sweden 2017–2023 ($ million)
Exhibit 63 Data Center Construction Market in Sweden by Area 2017–2023 (Million Sq. Ft.)
Exhibit 64 Data Center Construction Market in Sweden by Power Capacity 2017–2023 (MW)
Exhibit 65 Data Center Construction Market in Sweden by Electrical Construction 2017−2023 ($ million)
Exhibit 66 Data Center Construction Market in Sweden by Mechanical Construction 2017−2023 ($ million)
Exhibit 67 Data Center Construction Market in Sweden by General Construction 2017−2023 ($ million)
LIST OF TABLES
Table 1 Key Caveats
Table 2 Currency Conversion 2013−2017
Table 3 YOY Impact of Market Growth Enablers 2017−2023
Table 4 YOY Impact of Market Growth Restraints 2017−2023
Table 5 YOY Impact of Market Opportunities & Trends 2017−2023
Table 6 Data Center Construction by Type (Overview)
Table 7 Qualitative Summary of Data Center Construction Market in Nordic
Table 8 Data Center Construction Market in Nordic 2017–2023
Table 9 Data Center Construction Market in Nordic by Country 2017–2023
Table 10 Data Center Construction Market in Nordic by Area 2017–2023
Table 11 Data Center Construction Market in Nordic by Power Capacity 2017–2023
Table 12 Data Center Construction Market in Nordic by Construction Type 2017–2023
Table 13 Data Center Construction Market in Nordic by Electrical Infrastructure 2017–2023
Table 14 Data Center Construction Market in Nordic by Mechanical Infrastructure 2017–2023
Table 15 Data Center Construction Market in Nordic by Cooling Systems 2017–2023
Table 16 Data Center Construction Market in Nordic by Cooling Technique 2017–2023
Table 17 Data Center Construction Market in Nordic by General Construction 2017–2023
Table 18 Data Center Construction Market in Denmark 2017–2023
Table 19 Data Center Construction Market in Finland 2017–2023
Table 20 Data Center Construction Market in Iceland 2017–2023
Table 21 Data Center Construction Market in Norway 2017–2023
Table 22 Data Center Construction Market in Sweden 2017–2023
Table 1 Key Caveats
Table 2 Currency Conversion 2013−2017
Table 3 YOY Impact of Market Growth Enablers 2017−2023
Table 4 YOY Impact of Market Growth Restraints 2017−2023
Table 5 YOY Impact of Market Opportunities & Trends 2017−2023
Table 6 Data Center Construction by Type (Overview)
Table 7 Qualitative Summary of Data Center Construction Market in Nordic
Table 8 Data Center Construction Market in Nordic 2017–2023
Table 9 Data Center Construction Market in Nordic by Country 2017–2023
Table 10 Data Center Construction Market in Nordic by Area 2017–2023
Table 11 Data Center Construction Market in Nordic by Power Capacity 2017–2023
Table 12 Data Center Construction Market in Nordic by Construction Type 2017–2023
Table 13 Data Center Construction Market in Nordic by Electrical Infrastructure 2017–2023
Table 14 Data Center Construction Market in Nordic by Mechanical Infrastructure 2017–2023
Table 15 Data Center Construction Market in Nordic by Cooling Systems 2017–2023
Table 16 Data Center Construction Market in Nordic by Cooling Technique 2017–2023
Table 17 Data Center Construction Market in Nordic by General Construction 2017–2023
Table 18 Data Center Construction Market in Denmark 2017–2023
Table 19 Data Center Construction Market in Finland 2017–2023
Table 20 Data Center Construction Market in Iceland 2017–2023
Table 21 Data Center Construction Market in Norway 2017–2023
Table 22 Data Center Construction Market in Sweden 2017–2023
More Publications
Global Data Center Construction Industry Market Research Report
US$ 2,960.00
August 2017
165 pages