Data Center Construction Market in Nordic - Industry Outlook and Forecast 2020-2025

June 2020 | 263 pages | ID: D82A2F3B78F3EN
Arizton Advisory & Intelligence

US$ 3,500.00

E-mail Delivery (PDF)

Download PDF Leaflet

Accepted cards
Wire Transfer
Checkout Later
Need Help? Ask a Question
In-depth Analysis and Data-driven Insights on the Impact of COVID-19 Included in this Nordic Data Center Construction Market Report

The Nordic data center construction market is expected to grow at a CAGR of over 1% during the period 2019–2025.

The Nordic data center market has been a favorable destination for data center developments and investments for hyperscale data center operators, colocation providers, and cryptocurrency operators. The adoption of cloud-based services, big data analytics, and IoT services has grown significantly by local enterprises across countries in the Nordic region, boosting local colocation demand in the market. Public cloud and hybrid infrastructure services have witnessed strong growth in recent years. The market is witnessing significant investments in submarine cable projects from service providers. Telecommunication providers are investing heavily to strengthen the broadband services in the region. The availability of renewable sources of energy is the major market driver, with majority of data centers powered through renewable energy sources.

The rapid spread of COVID-19 has significantly increased data traffic from March 2020 onwards. The global data center construction market is facing a major slowdown due to the rapid spread of the Covid-19. To provide high availability services, operators are taking precautionary measures for their on-site employees. Colocation data center operators have reduced onsite staff and postponed non-critical maintenance and construction projects.

The following factors are likely to contribute to the growth of the Nordic data center construction market during the forecast period:
  • Increasing Adoption of Distinct Heating Concept
  • Growing Construction of Cryptocurrency Data Centers
  • Rising Modular Data Center Deployment
  • Increasing Adoption of Cloud-based Services
The study considers the present scenario of the Nordic data center construction market and its market dynamics for the period 2019?2025. It covers a detailed overview of several market growth enablers, restraints, and trends. The report offers both the demand and supply aspect of the market. It profiles and examines leading companies and other prominent ones operating in the market.

Nordic Data Center Construction Market Segmentation

This research report includes a detailed segmentation by electrical infrastructure, mechanical infrastructure, general construction, tier standards, and geography. The increased data centers construction in Denmark is expected to observe the demand for intelligent and efficient power infrastructure solutions during the forecast period. The redundancy in infrastructures such as UPS systems and PDUs is likely to be over 2N, whereas for switchgears it will be N+1 configuration with dual power line inside and outside facilities. Several facilities in Sweden have adopted N+N redundant power infrastructure. Data centers must be flexible enough to facilitate additional redundancy. A majority of facilities will be powered by dual power lines, and rural developments will include on-site substations. The use of redundant diesel generators might reduce due to a strong power grid supply in the Nordic region. Generators and switchgears with N+1 redundant configuration are being adopted in the facilities. The UPS and PDUs in N+N, 2N, 2N+1 configuration are being installed due to their flexible designs.

In terms of cooling, data centers in Denmark have an advantage as the region offers 85% free cooling annually. This reduces electricity consumption by cooling units by up to 50%. The data centers in Norway use free cooling chillers, adiabatic dry coolers, and evaporative coolers to cool down the IT infrastructure. The adoption of cooling techniques is highly dependent on the location and design of the facility. It is expected that most future investments will involve evaporative coolers, whereas the possibility of using an abundance of water resources is also high.

In Nordic, the market is completely dominated by greenfield development. In these projects, building development is carried out by major construction contractors in coordination with design and infrastructure providers and service operators. The involvement of sub-contractors is high as they have strong expertise in building structures in a particular location. Denmark continues to dominate with hyperscale greenfield development. These data center projects provide high revenue opportunities for general contractors. Local sub-contractors are also expected to witness continuous growth in their revenues during the forecast period. With the increased construction of hyperscale facilities, the demand for skilled professionals is likely to grow in the country. The growth in greenfield hyperscale facilities will generate more revenue for installation and commission service providers in Nordic.

The Tier I & Tier II data center market is expected to register a negative CAGR during the forecast period. The number of Tier I and Tier II facilities has reduced significantly over the past five years because of the increasing awareness of the use of redundant infrastructure. UPS and PDU systems in Tier II data centers are equipped with minimum N+N redundancy. A majority of under-developed projects across the Nordic region fall under the Tier III category. This trend is likely to continue during the forecast period. Many operators are expected to move to the Tier IV category based on the growth in rack power capacity and critical applications. In Finland and Iceland, there are three data centers that are Uptime Institute Certified under the Tier III category.

Segmentation by Electrical Infrastructure
  • UPS
  • Generators
  • Transfer Switches & Switchgears
  • Rack PDUs
  • Other Electrical Infrastructure
Segmentation by Mechanical Infrastructure
  • Cooling Systems
    • CRAC & CRAH Units
    • Chillers
    • Cooling Towers & Dry Coolers
    • Other Units
  • Racks
  • Other Mechanical Infrastructure
Segmentation by General Construction
  • Building Development
  • Installation & Commissioning Services
  • Building Designs
  • Physical Security
  • DCIM
Segmentation by Tier Standards
  • Tier I & Tier II
  • Tier III
  • Tier IV
Insights by Geography

Facebook investments in its Odense Data Center Facility in Denmark is followed by Google broke ground on its first Denmark data center, which is likely to be functional by 2021. In terms of colocation providers, Bulk Infrastructure invested in its DK01 Campus along with investments from DigiPlex, GlobalConnect, and Interxion are investing in the data center market in Denmark. In Norway, Microsoft and Equinor contributed to the investment along with Green Mountain with investments in facilities such as DC2 Telemark and Telemark & Stavanger Data Center. In 2019, Stockholm was the major investment destination Sweden that includes seven facility development activities with an estimated investment of over $350 million. Hyperscale renewable procurement is growing YOY in the region. For instance, Google has signed a 12-year contract with a power company in Norway to supply 160 MW of wind energy to power its data centers in Europe. The country has ample renewable energy sources to support large facilities.

Segmentation by Geography
  • Denmark
  • Sweden
  • Norway
  • Finland & Iceland
Insights by Vendors

The Nordic data center construction market is witnessing a steady growth in terms of greenfield and modular data center construction, with the high adoption of efficient and modular data center infrastructure solutions. The market has evolved over the years with multiple innovations focused on reducing power and water consumption and decreasing carbon dioxide emissions. Schneider Electric, Eaton, Rittal, Vertiv, and ABB are leading vendors in the electrical infrastructure market. Vendors are also partnering with modular data center developers and direct liquid cooling providers to increase revenues. This trend is likely to continue during the forecast period.

Prominent Support Infrastructure Providers
  • ABB
  • Airedale Air Conditioning
  • Alfa Laval
  • Asetek
  • Bosch Security Systems (Robert Bosch)
  • Caterpillar
  • Cummins
  • Delta Group
  • Eaton
  • KINOLT (Euro-Diesel)
  • Hitech Power Protection
  • KOHLER (SDMO)
  • Legrand
  • Piller Power Systems
      • Riello UPS
  • Rittal
  • MTU On Site Energy (Rolls-Royce Power Systems AG)
  • Schneider Electric
  • Socomec Group
  • STULZ
  • Trane (Ingersoll Rand)
  • Vertiv
Prominent Construction Contractors
  • AECOM
  • Arup Group
  • Bravida
  • COWI
  • Dornan
  • DPR Construction
  • ENACO
  • Etix Everywhere (VANTAGE DATA CENTER)
  • Fortis Construction
  • Granlund
  • HDR Architecture
  • KMCS
  • Mace Group
  • Mercury Engineering
  • MTH GROUP
  • NCC
  • Ramboll
  • Royal HaskoningDHV
  • Skanska
  • SRV Group
  • Sweco
Prominent Data Center Investors
  • Bahnhof
  • BorderLight AB (GoGreenHost)
  • Bulf Infrastructure
  • Digiplex
  • Equinix
  • Facebook
  • GlobalConnect
  • Interxion
  • Microsoft
  • Multigrid
  • Green Mountain AS
  • EcoDataCenter
Key Questions Answered

1. What is the Nordic data center construction market size and growth forecast?
2. What are the factors impacting the growth of the Nordic data center construction market forecast?
3. What are the leading drivers, trends, and restraints in the Nordic data center construction market?
4. Who are the leading vendors and what are their market shares?
5. What impact the COVID-19 Pandemic have on the market?
1 RESEARCH METHODOLOGY

2 RESEARCH OBJECTIVES

3 RESEARCH PROCESS

4 SCOPE & COVERAGE

4.1 Market Definition
4.2 Base Year
4.3 Scope of The Study
4.4 Market Segments
  4.4.1 Market Segmentation by Infrastructure
  4.4.2 Market Segmentation by Electrical Infrastructure
  4.4.3 Market Segmentation by Mechanical Infrastructure
  4.4.4 Market Segmentation by Cooling Systems
  4.4.5 Market Segmentation by General Construction
  4.4.6 Market Segmentation by Tier Standards
  4.4.7 Market Segmentation by Geography

5 REPORT ASSUMPTIONS & CAVEATS

5.1 Key Caveats
5.2 Currency Conversion
5.3 Market Derivation

6 MARKET AT A GLANCE

7 INTRODUCTION

7.1 Internet & Data Growth
7.2 Data Center Site Selection Criteria
  7.2.1 Key
7.3 Electricity Pricing Across Major Data Center Locations
7.4 Submarine Cables

8 IMPACT OF COVID-19

8.1 Impact Of Covid-19 On Data Center Industry
  8.1.1 Construction Perspective
  8.1.2 Infrastructure Production & Procurement
  8.1.3 Data Center Operations
8.2 Impact Of Covid-19 In Nordic
  8.2.1 Nordic Market Investment 2019?2025

9 MARKET OPPORTUNITIES & TRENDS

9.1 Increasing Adoption Of Distinct Heating Concept
9.2 Growing Construction Of Cryptocurrency Data Centers
9.3 Increasing Construction Hyperscale Data Center Facilities
9.4 Rising Modular Data Center Deployment

10 MARKET GROWTH ENABLERS

10.1 Rising Adoption Of Cloud-Based Services
10.2 Growing Investments In Data Centers By Colocation Operators
10.3 Availability Of Renewable Energy Sources
10.4 Free Cooling Lowers PUE Of Data Centers
10.5 Tax Incentives & Land Availability For Development

11 MARKET GROWTH RESTRAINTS

11.1 Lack Of Skilled Workforce
11.2 High Procurement Cost Of Efficient Infrastructure
11.3 Physical Security Constraints

12 MARKET LANDSCAPE

12.1 Market Overview
12.2 Investment: Market Size & Forecast
12.3 Area: Market Size & Forecast
12.4 Power Capacity: Market Size & Forecast
12.5 Five Forces Analysis
  12.5.1 Threat Of New Entrants
  12.5.2 Bargaining Power Of Suppliers
  12.5.3 Bargaining Power Of Buyers
  12.5.4 Threat Of Substitutes
  12.5.5 Competitive Rivalry

13 INFRASTRUCTURE SEGMENTATION

13.1 Market Snapshot & Growth Engine
13.2 Market Overview
13.3 Electrical Infrastructure
  13.3.1 Market Overview
  13.3.2 Market Size & Forecast
13.4 Mechanical Infrastructure
  13.4.1 Market Overview
  13.4.2 Market Size & Forecast
13.5 General Construction
  13.5.1 Market Overview
  13.5.2 Market Size & Forecast

14 ELECTRICAL INFRASTRUCTURE

14.1 Market Snapshot & Growth Engine
14.2 UPS Systems
  14.2.1 Market Overview
  14.2.2 Market Size & Forecast
14.3 Generators
  14.3.1 Market Overview
  14.3.2 Market Size & Forecast
14.4 Transfer Switches & Switchgear
  14.4.1 Market Overview
  14.4.2 Market Size & Forecast
14.5 Power Distribution Units
  14.5.1 Market Overview
  14.5.2 Market Size & Forecast
14.6 Other Electrical Infrastructure
  14.6.1 Market Overview
  14.6.2 Market Size & Forecast

15 MECHANICAL INFRASTRUCTURE

15.1 Market Snapshot & Growth Engine
15.2 Cooling Systems
  15.2.1 Market Overview
  15.2.2 Market Size & Forecast
15.3 Racks
  15.3.1 Market Overview
  15.3.2 Market Size & Forecast
15.4 Other Mechanical Infrastructure
  15.4.1 Market Overview
  15.4.2 Market Size & Forecast

16 COOLING SYSTEMS

16.1 Market Snapshot & Growth Engine
16.2 CRAC & CRAH Units
  16.2.1 Market Overview
  16.2.2 Market Size & Forecast
16.3 Chiller Units
  16.3.1 Market Overview
  16.3.2 Market Size & Forecast
16.4 Cooling Towers, Dry Coolers, & Condenser
  16.4.1 Market Overview
  16.4.2 Market Size & Forecast
16.5 Economizers & Evaporative Coolers
  16.5.1 Market Overview
  16.5.2 Market Size & Forecast
16.6 Other Cooling Units
  16.6.1 Market Overview
  16.6.2 Market Size & Forecast

17 COOLING TECHNIQUE

17.1 Market Snapshot & Growth Engine
17.2 Air-Based Cooling Techniques
  17.2.1 Market Overview
  17.2.2 Market Size & Forecast
17.3 Liquid-Based Cooling Techniques
  17.3.1 Market Overview
  17.3.2 Market Size & Forecast

18 GENERAL CONSTRUCTION

18.1 Market Snapshot & Growth Engine
18.2 Building Development
  18.2.1 Market Overview
  18.2.2 Market Size & Forecast
18.3 Installation & Commissioning Services
  18.3.1 Market Overview
  18.3.2 Market Size & Forecast
18.4 Building Design
  18.4.1 Market Overview
  18.4.2 Market Size & Forecast
18.5 Physical Security
  18.5.1 Market Overview
  18.5.2 Market Size & Forecast
18.6 DCIM/BMS
  18.6.1 Market Overview
  18.6.2 Market Size & Forecast

19 TIER STANDARDS

19.1 Market Snapshot & Growth Engine
19.2 Overview Of Tier Standards
19.3 Tier I & II
  19.3.1 Market Overview
  19.3.2 Market Size & Forecast
19.4 Tier III
  19.4.1 Market Overview
  19.4.2 Market Size & Forecast
19.5 Tier IV
  19.5.1 Market Overview
  19.5.2 Market Size & Forecast

20 COUNTRY SEGMENTATION

20.1 Investment: Snapshot & Growth Engine
20.2 Area: Snapshot & Growth Engine
20.3 Power Capacity: Snapshot & Growth Engine
20.4 Denmark
  20.4.1 Market Snapshot & Growth Engine
  20.4.2 Market Overview
  20.4.3 Investment: Market Size & Forecast
  20.4.4 Area: Market Size & Forecast
  20.4.5 Power Capacity: Market Size & Forecast
  20.4.6 Infrastructure: Market Size & Forecast
20.5 Norway
  20.5.1 Market Snapshot & Growth Engine
  20.5.2 Market Overview
  20.5.3 Investment: Market Size & Forecast
  20.5.4 Area: Market Size & Forecast
  20.5.5 Power Capacity: Market Size & Forecast
  20.5.6 Infrastructure: Market Size & Forecast
20.6 Sweden
  20.6.1 Market Snapshot & Growth Engine
  20.6.2 Market Overview
  20.6.3 Investment: Market Size & Forecast
  20.6.4 Area: Market Size & Forecast
  20.6.5 Power Capacity: Market Size & Forecast
  20.6.6 Infrastructure: Market Size & Forecast
20.7 Finland & Iceland
  20.7.1 Market Snapshot & Growth Engine
  20.7.2 Market Overview
  20.7.3 Investment: Market Size & Forecast
  20.7.4 Area: Market Size & Forecast
  20.7.5 Power Capacity: Market Size & Forecast
  20.7.6 Infrastructure: Market Size & Forecast

21 COMPETITIVE LANDSCAPE

21.1 Overview
21.2 Electrical Infrastructure
21.3 Mechanical Infrastructure
21.4 General Construction

22 PROMINENT DATA CENTER SUPPORT INFRASTRUCTURE PROVIDERS

22.1 ABB
  22.1.1 Business Overview
  22.1.2 Product Offerings
22.2 Airedale Air Conditioning
  22.2.1 Business Overview
  22.2.2 Product Offerings
22.3 ALFA LAVAL
  22.3.1 Business Overview
  22.3.2 Product Offerings
22.4 ASETEK
  22.4.1 Business Overview
  22.4.2 Product Offerings
22.5 Bosch Security Systems (Robert Bosch)
  22.5.1 Business Overview
  22.5.2 Product Offerings
22.6 Caterpillar
  22.6.1 Business Overview
  22.6.2 Product Offerings
22.7 Cummins
  22.7.1 Business Overview
  22.7.2 Product Offerings
22.8 Delta Group
  22.8.1 Business Overview
  22.8.2 Product Offerings
22.9 Eaton
  22.9.1 Business Overview
  22.9.2 Product Offerings
22.10 Euro-Diesel (KINOLT)
  22.10.1 Business Overview
  22.10.2 Product Offerings
22.11 Hitech Power Protection
  22.11.1 Business Overview
  22.11.2 Product Offerings
22.12 KOHLER (SDMO)
  22.12.1 Business Overview
  22.12.2 Product Offerings
22.13 Legrand
  22.13.1 Business Overview
  22.13.2 Product Offerings
22.14 Piller Power Systems
  22.14.1 Business Overview
  22.14.2 Product Offerings
22.15 Riello UPS
  22.15.1 Business Overview
  22.15.2 Product Offerings
22.16 Rittal
  22.16.1 Business Overview
  22.16.2 Product Offerings
22.17 MTU On Site Energy (Rolls-Royce Power Systems AG)
  22.17.1 Business Overview
  22.17.2 Product Offerings
22.18 Schneider Electric
  22.18.1 Business Overview
  22.18.2 Product Offerings
22.19 Socomec
  22.19.1 Business Overview
  22.19.2 Product Offerings
22.20 Stulz
  22.20.1 Business Overview
  22.20.2 Product Offerings
22.21 Trane (Ingersoll Rand)
  22.21.1 Business Overview
  22.21.2 Product Offerings
22.22 Vertiv
  22.22.1 Business Overview
  22.22.2 Product Offerings

23 PROMINENT DATA CENTER CONTRACTORS

23.1 Aecom
  23.1.1 Business Overview
  23.1.2 Service Offerings
23.2 Arup Group
  23.2.1 Business Overview
  23.2.2 Service Offerings
23.3 Bravida
  23.3.1 Business Overview
  23.3.2 Service Offerings
23.4 COWI
  23.4.1 Business Overview
  23.4.2 Service Offerings
23.5 Dornan
  23.5.1 Business Overview
  23.5.2 Service Offerings
23.6 DPR Construction
  23.6.1 Business Overview
  23.6.2 Service Offerings
23.7 ENACO
  23.7.1 Business Overview
  23.7.2 Service Offerings
23.8 Etix Everywhere (Vantage Data Center)
  23.8.1 Business Overview
  23.8.2 Service Offerings
23.9 Fortis Construction
  23.9.1 Business Overview
  23.9.2 Service Offerings
23.10 Granlund
  23.10.1 Business Overview
  23.10.2 Service Offerings
23.11 HDR Architecture
  23.11.1 Business Overview
  23.11.2 Service Offerings
23.12 KMCS
  23.12.1 Business Overview
  23.12.2 Service Offerings
23.13 Mace Group
  23.13.1 Business Overview
  23.13.2 Service Offerings
23.14 Mercury Engineering
  23.14.1 Business Overview
  23.14.2 Service Offerings
23.15 MTH Group
  23.15.1 Business Overview
  23.15.2 Service Offerings
23.16 NCC
  23.16.1 Business Overview
  23.16.2 Service Offerings
23.17 Ramboll
  23.17.1 Business Overview
  23.17.2 Service Offerings
23.18 Royal Haskoningdhv
  23.18.1 Business Overview
  23.18.2 Service Offerings
23.19 SKANSKA
  23.19.1 Business Overview
  23.19.2 Service Offerings
23.20 SRV Group
  23.20.1 Business Overview
  23.20.2 Service Offerings
23.21 Sweco
  23.21.1 Business Overview
  23.21.2 Service Offerings

24 PROMINENT DATA CENTER INVESTORS

24.1 Bahnhof
  24.1.1 Business Overview
  24.1.2 Service Offerings
24.2 Boderlight AB (GoGREENHOST)
  24.2.1 Business Overview
  24.2.2 Service Offerings
24.3 Bulk Infrastructure
  24.3.1 Business Overview
  24.3.2 Service Offerings
24.4 DIGIPLEX
  24.4.1 Business Overview
  24.4.2 Service Offerings
  24.4.3 Key News
24.5 Equinix
  24.5.1 Business Overview
  24.5.2 Service Offerings
  24.5.3 Key News
24.6 Facebook
  24.6.1 Business Overview
  24.6.2 Service Offerings
24.7 GlobalConnect
  24.7.1 Business Overview
  24.7.2 Service Offerings
24.8 INTERXION
  24.8.1 Business Overview
  24.8.2 Service Offerings
  24.8.3 Key News
24.9 MICROSOFT
  24.9.1 Business Overview
  24.9.2 Service Offerings
24.10 MULTIGRID
  24.10.1 Business Overview
  24.10.2 Service Offerings
24.11 Green Mountain AS
  24.11.1 Business Overview
  24.11.2 Service Offerings
  24.11.3 Key News
24.12 Ecodatacenter
  24.12.1 Business Overview
  24.12.2 Service Offerings
  24.12.3 Key News

25 REPORT SUMMARY

25.1 Key Takeaways
25.2 Strategic Recommendations

26 QUANTITATIVE SUMMARY

26.1 Nordic Data Center Market
  26.1.1 Investment: Market Size & Forecast
  26.1.2 Infrastructure: Market Size & Forecast
  26.1.3 Electrical Infrastructure: Market Size & Forecast
  26.1.4 Mechanical Infrastructure: Market Size & Forecast
  26.1.5 Cooling Systems: Market Size & Forecast
  26.1.6 Cooling Technique: Market Size & Forecast
  26.1.7 General Construction: Market Size & Forecast
26.2 Geography
  26.2.1 Market Investment by Country
  26.2.2 Market Area Developed by Country
  26.2.3 Power Capacity Investment by Country
26.3 Denmark
  26.3.1 Investment: Market Size & Forecast
  26.3.2 Market by Infrastructure
26.4 Sweden
  26.4.1 Investment: Market Size & Forecast
  26.4.2 Market by Infrastructure
26.5 Norway
  26.5.1 Investment: Market Size & Forecast
  26.5.2 Market by Infrastructure
26.6 Finland & Iceland
  26.6.1 Investment: Market Size & Forecast
  26.6.2 Market by Infrastructure

27 ABBREVIATIONS

LIST OF EXHIBITS

Exhibit 1 Segmentation of Nordic Data Center Construction Market
Exhibit 2 Market Size Calculation Approach 2019
Exhibit 3 Nordic Internet Penetration & Mobile Connections 2019
Exhibit 4 Average Electricity Pricing in Nordics 2019 (per kW)
Exhibit 5 Impact of COVID-19 Pandemic on European Data Center Market
Exhibit 6 Impact of Increasing Adoption of Distinct Heating Concept
Exhibit 7 Impact of Growing Construction of Cryptocurrency Data Centers
Exhibit 8 Impact of Increasing Construction Hyperscale Data Center Facilities
Exhibit 9 Impact of Rising Modular Data Center Deployment
Exhibit 10 Impact of Rising Adoption of Cloud-Based Services
Exhibit 11 Estimated Adoption of Cloud Computing among Enterprises in Nordics 2019
Exhibit 12 Impact of Growing Investments in Data Centers by Colocation Operators
Exhibit 13 Nordic Colocation Data Center Project & Area Added
Exhibit 14 Impact of Availability of Renewable Energy Sources
Exhibit 15 Renewable Energy % Share in Nordic Countries 2019
Exhibit 16 Impact of Free Cooling Lowers PUE of Data Centers
Exhibit 17 Impact of Tax Incentives & Land Availability for Development
Exhibit 18 Impact of Lack of Skilled Workforce
Exhibit 19 Impact of High Procurement Cost of Efficient Infrastructure
Exhibit 20 Impact of Physical Security Constraints
Exhibit 21 Nordic Data Center Construction Market 2019?2025 ($ million)
Exhibit 22 Data Center Construction Market in Nordics by Area 2019–2025 (Million Square Feet)
Exhibit 23 Data Center Construction Market in Nordics by Power Capacity 2019–2025 (MW)
Exhibit 24 Five Forces Analysis 2019
Exhibit 25 Incremental Growth by Infrastructure 2019?2025
Exhibit 26 Nordic Data Center Construction Market by Infrastructure
Exhibit 27 Nordic Data Center Construction Electrical Infrastructure Market 2019?2025 ($ million)
Exhibit 28 Nordic Data Center Construction Mechanical Infrastructure Market 2019?2025 ($ million)
Exhibit 29 Nordic Data Center General Construction Market 2019?2025 ($ million)
Exhibit 30 Average Labor Cost in Nordic Countries 2019
Exhibit 31 Incremental Growth by Electrical Infrastructure 2019?2025
Exhibit 32 Nordic Data Center Construction UPS Systems Market 2019?2025 ($ million)
Exhibit 33 Nordic Data Center UPS Share by Countries
Exhibit 34 Nordic Data Center Construction Generators Market 2019?2025 ($ million)
Exhibit 35 Nordic Data Center Construction Generator Share
Exhibit 36 Nordic Data Center Construction Transfer Switches & Switchgears Market 2019?2025 ($ million)
Exhibit 37 Nordic Data Center Transfer Switches & Switchgear Share by Countries
Exhibit 38 Nordic Data Center Construction PDUs Market 2019?2025 ($ million)
Exhibit 39 Nordic Data Center PDU Share by Countries
Exhibit 40 Nordic Data Center Other Power Infrastructure Construction Market 2019?2025 ($ million)
Exhibit 41 Nordic Data Center Other Electrical Infrastructure Market by Country
Exhibit 42 Incremental Growth by Mechanical Infrastructure 2019?2025
Exhibit 43 Nordic Data Center Construction Cooling Systems Market 2019?2025 ($ million)
Exhibit 44 Nordic Data Center Construction Market by Cooling Systems by Country
Exhibit 45 Nordic Data Center Construction Racks Market 2019–2025 ($ million)
Exhibit 46 Nordic Data Center Construction Racks Market by Country
Exhibit 47 Nordic Data Center Construction Other Mechanical Infrastructure Market 2019?2025 ($ million)
Exhibit 48 Nordic Data Center Construction Other Mechanical Infrastructure Market by Country
Exhibit 49 Incremental Growth by Cooling Systems 2019?2025
Exhibit 50 Nordic Data Center Construction CRAC & CRAH Market 2019?2025 ($ million)
Exhibit 51 Nordic Data Center Construction CRAC & CRAH Market by Country
Exhibit 52 Nordic Data Center Construction Chiller Market 2019?2025 ($ million)
Exhibit 53 Nordic Data Center Construction Chiller Market by Country
Exhibit 54 Nordic Data Center Construction Cooling Towers, Dry Coolers & Condensers Market 2019?2025 ($ million)
Exhibit 55 Nordic Data Center Construction Cooling Towers & Dry Coolers Market by Country
Exhibit 56 Nordic Data Center Construction Evaporative Coolers Market 2019?2025 ($ million)
Exhibit 57 Nordic Data Center Construction Evaporative Cooler Market by Country
Exhibit 58 Nordic Data Center Construction Other Cooling Market 2019?2025 ($ million)
Exhibit 59 Nordic Data Center Construction Other Cooling Market by Country
Exhibit 60 Incremental Growth by Cooling Technique 2019?2025
Exhibit 61 Nordic Data Center Construction Air-based Cooling Market 2019?2025 ($ million)
Exhibit 62 Nordic Data Center Construction Air-Based Cooling Market by Country
Exhibit 63 Nordic Data Center Construction Liquid-based Cooling Market 2019?2025 ($ million)
Exhibit 64 Nordic Data Center Construction Liquid-Based Cooling Market by Country
Exhibit 65 Incremental Growth by General Construction 2019?2025
Exhibit 66 Nordic Data Center Construction Building Development Market 2019–2025 ($ million)
Exhibit 67 Nordic Data Center Construction Building Development Market by Country
Exhibit 68 Nordic Data Center Construction Installation & Commissioning Market 2019–2025 ($ million)
Exhibit 69 Nordic Data Center Construction Installation & Commissioning Market by Country
Exhibit 70 Nordic Data Center Construction Building Design Market 2019–2025 ($ million)
Exhibit 71 Nordic Data Center Construction Building Design Market by Country
Exhibit 72 Nordic Data Center Construction Physical Security Market 2019–2025 ($ million)
Exhibit 73 Nordic Data Center Construction Physical Security Market by Country
Exhibit 74 Nordic Data Center Construction DCIM Market 2019–2025 ($ million)
Exhibit 75 Nordic Data Center Construction DCIM/BMS Market by Country
Exhibit 76 Incremental Growth by Tier Standards 2019?2025
Exhibit 77 Overview of Tier Standards
Exhibit 78 Nordic Tier I & II Data Center Construction Market 2019–2025 ($ million)
Exhibit 79 Nordic Tier III Data Center Construction Market 2019–2025 ($ million)
Exhibit 80 Nordic Tier IV Data Center Construction Market 2019?2025 ($ million)
Exhibit 81 Incremental Growth in Nordic Countries by Investment 2019?2025 ($ billion)
Exhibit 82 Incremental Growth in Nordics by Area 2019?2025 (million square feet)
Exhibit 83 Incremental Growth in Nordics by Power Capacity 2019?2025 (MW)
Exhibit 84 Snapshot – Data Center Construction Market in Denmark 2019?2025
Exhibit 85 Data Center Construction Market in Denmark 2019?2025 ($ million)
Exhibit 86 Data Center Construction Market in Denmark by Area 2019?2025 (Million Square Feet)
Exhibit 87 Renewable Energy Generation in Denmark 2019
Exhibit 88 Data Center Construction Market in Denmark by Power Capacity 2019?2025 (MW)
Exhibit 89 Data Center Construction Infrastructure Market in Denmark 2019?2025 ($ million)
Exhibit 90 Snapshot – Data Center Construction Market in Norway 2019?2025
Exhibit 91 Data Center Construction Market in Norway 2019?2025 ($ million)
Exhibit 92 Data Center Construction Market in Norway by Area 2019?2025 (Million Square Feet)
Exhibit 93 Data Center Construction Market in Norway by Power Capacity 2019?2025 (MW)
Exhibit 94 Data Center Construction Infrastructure Market in Norway 2019?2025 ($ million)
Exhibit 95 Snapshot – Data Center Construction Market in Sweden 2019?2025
Exhibit 96 Data Center Construction Market in Sweden 2019?2025 ($ million)
Exhibit 97 Data Center Construction Market in Sweden by Area 2019?2025 (Million Square Feet)
Exhibit 98 Data Center Construction Market in Sweden by Power Capacity 2019?2025 (MW)
Exhibit 99 Data Center Construction Infrastructure Market in Sweden 2019?2025 ($ million)
Exhibit 100 Snapshot – Data Center Construction Market in Finland & Iceland 2019?2025
Exhibit 101 Data Center Construction Market in Finland & Iceland 2019?2025 ($ million)
Exhibit 102 Data Center Construction Market in Finland & Iceland by Area 2019?2025 (Million Square Feet)
Exhibit 103 Data Center Construction Market in Finland & Iceland by Power Capacity 2019?2025 (MW)
Exhibit 104 Data Center Construction Infrastructure Market in Finland & Iceland 2019?2025 ($ million)
Exhibit 105 Nordic Data Center Construction Market 2019?2025

LIST OF TABLES

Table 1 Key Caveats
Table 2 Currency Conversion 2014?2019
Table 3 Data Center Site Selection Criteria
Table 4 List Of Submarine Fiber Cable Projects
Table 5 Data Center Market in Nordics 2019?2025
Table 6 Impact of COVID-19 on Data Center Power Market ($ million) 2020
Table 7 Comparison of Traditional & Prefabricated Module Approaches
Table 8 PUE vs Efficiency vs DCIE
Table 9 Nordic Data Center Construction Market by Infrastructure 2019?2025 ($ million)
Table 10 Nordic Data Center Construction Electrical Infrastructure Market 2019?2025 ($ million)
Table 11 Nordic Data Center Construction Mechanical Infrastructure Market 2019?2025 ($ million)
Table 12 Nordic Data Center Construction Cooling System Market 2019?2025 ($ million)
Table 13 Nordic Data Center Construction Cooling Technique Market 2019?2025 ($ million)
Table 14 Nordic Data Center General Construction Market 2019?2025 ($ million)
Table 15 Nordic Data Center Market by Geography 2019?2025 ($ million)
Table 16 Nordic Data Center Construction Market by Area 2019?2025 (million square feet)
Table 17 Nordic Data Center Construction Market by Power Capacity 2019?2025 (MW)
Table 18 Denmark Data Center Construction Market 2019?2025
Table 19 Denmark Data Center Construction Infrastructure Market 2019?2025 ($ million)
Table 20 Sweden Data Center Construction Market 2019?2025
Table 21 Sweden Data Center Construction Infrastructure Market 2019?2025 ($ million)
Table 22 Norway Data Center Construction Market 2019?2025
Table 23 Norway Data Center Construction Infrastructure Market 2019?2025 ($ million)
Table 24 Finland & Iceland Data Center Construction Market 2019?2025
Table 25 Finland & Iceland Data Center Construction Infrastructure 2019?2025 ($ million)