Data Center Construction Market in Middle East Africa - Industry Outlook and Forecast 2020-2025
In-depth Analysis and Data-driven Insights on the Impact of COVID-19 Included in this Middle East Africa Data Center Construction Market Report
The data center construction market in Middle East Africa is expected to grow at a CAGR of over 5% during the period 2019–2025.
The data center construction market share in Middle East Africa is expected to grow on account of the growth in internet penetration, social media usage, and smart city initiatives across the region. The demand for cloud computing, big data, and IoT technologies is likely to emerge as a prominent driver for data center development in the Middle Eastern region. Countries across the Middle East are likely to witness the improvement in network connectivity via the installation of inland and submarine network connectivity.
The construction of traditional brick-and-mortar facilities is also growing along with the rising deployment of modular facilities. The data center market in Middle East is attracting significant investments in recent years, led by countries such as UAE, Bahrain, Qatar, Turkey, Jordan and Saudi Arabia.
South Africa continues to dominate the data center construction market in Africa. In 2019, Morocco witnessed higher investments followed by Egypt, Kenya, and Nigeria. Colocation and telecommunication service providers are major investors in Africa, followed by enterprises and governments agencies. The increase in internet penetration, smartphone users, and improvement in broadband connectivity is aiding the growth of data across African countries.
The following factors are likely to contribute to the growth of the data center construction market in Middle East Africa during the forecast period:
Data Center Construction Market in Middle East Africa - Segmentation
This research report includes a detailed segmentation by, Electrical Infrastructure, general construction, mechanical infrastructure, tier standards, and geography. The adoption of lithium-ion batteries will emerge in the next two years in UAE and Saudi Arabia countries. However, the use of lithium-ion, will pick up in the next 3-4 years in Africa countries, as many operators start to build large and hyperscale facilities. The market for generators will continue to grow because of the continuous construction of large and mega facilities in the region. The adoption of Diesel Rotary Uninterruptible Power Supply (DRUPS) systems is also growing since these systems combine both battery and flywheel UPS topology and a diesel generator to provide backup power during outages.
Data centers operated in Middle East countries do not support the use of free cooling systems. The Middle Eastern data centers market is adopting water-based cooling systems. The direct liquid cooling and immersion cooling solutions are likely to emerge in the market through the deployment of artificial intelligence and machine learning workloads in IoT and big data environment.
The data center market in Saudi Arabia has the presence of both local and global data center contractors. The market lacks a strong skilled workforce to accommodate the growing need for data center operational personnel. However, the facility investments are likely to increase the skilled workforce during the forecast period. The UAE will aid in the growth of greenfield projects as well as modular data centers. The country also has a strong presence of local as well as global data center contractors in the design, construction, installation, and commissioning services.
A majority of data center development in Turkey is greenfield type, whereas modular facilities are confined to enterprise on-premise deployments. In terms of construction, most colocation facilities in South Africa have installed physical security solutions, ranging from perimeters to video surveillance to biometric systems. The rapid growth in colocation data centers will increase the investment in physical security systems in the African market. Data center facilities in Morocco are installing 24X7 physical security with CCTV surveillance, and intrusion detection devices.
Currently, operators in Middle East & Africa are spending on infrastructure across Tier I and Tier II facilities, while focusing on adding redundant infrastructure for power. These data centers have a power capacity of less than 1 MW and are not involved in running mission-critical applications. A majority of under-developed projects across the region fall under the Tier III category. This trend is likely to continue during the forecast period.
Around eight data centers, which were opened in 2019, are of Tier III standard. About 10 Tier III data centers, which were under construction in 2019, are expected to open by Q1 & Q2 of 2020. Tier IV data centers are equipped with at least 2N+1 redundancy in every infrastructure that makes the facility fault-tolerant, with UPS systems and PDUs having 2N+2 redundancy. Amazon Web Services’ data center in Bahrain is one of the major contributors to the Middle East Tier IV market.
Segmentation by Electrical Infrastructure
The demand for cloud computing, big data, and IoT technologies will be a predominant driver for data center development in the Middle Eastern region. The investment in the market is aided by the construction of facilities by telecommunication providers, enterprises, government, cloud, and colocation service providers. Similarly, the investment in Africa is growing significantly, aided by the construction of data centers by telecommunication providers, enterprises, government, cloud, and colocation service providers.
Over the last few years, the region witnessed interest from leading cloud service providers such as AWS and Microsoft. Huawei also has a strong presence in the market and provides modular data center solutions for enterprise and government agencies. The demand for cloud services is growing among SMEs in the African region. It is expected that over 50% of the organizations operating in the African region will shift to cloud services by 2025.
Segmentation by Geography
Multiple electrical infrastructure providers operate in the data center construction market in Middle East Africa. The growing data center construction market is prompting providers to improve the efficiency of solutions that are currently being offered. Many countries in the region suffer from frequent power fluctuations and power outages. This will enable operators to adopt efficient power backup solutions, with UPS systems that offer over 95% efficiency.
The market for VRLA UPS systems will continue to dominate the market. However, the share of VRLA UPS systems will start declining by the end of the forecast period. Schneider Electric, Vertiv, and Huawei have a strong presence in the market.
Prominent Support Infrastructure Providers
1. What is the market size of the data center construction market analysis in Middle East Africa?
2. What are the factors impacting the growth of the data center construction market forecast in Middle East Africa?
3. What are the drivers, trends, and restraints in the market?
4. Who are the leading vendors and what are their market shares?
The data center construction market in Middle East Africa is expected to grow at a CAGR of over 5% during the period 2019–2025.
The data center construction market share in Middle East Africa is expected to grow on account of the growth in internet penetration, social media usage, and smart city initiatives across the region. The demand for cloud computing, big data, and IoT technologies is likely to emerge as a prominent driver for data center development in the Middle Eastern region. Countries across the Middle East are likely to witness the improvement in network connectivity via the installation of inland and submarine network connectivity.
The construction of traditional brick-and-mortar facilities is also growing along with the rising deployment of modular facilities. The data center market in Middle East is attracting significant investments in recent years, led by countries such as UAE, Bahrain, Qatar, Turkey, Jordan and Saudi Arabia.
South Africa continues to dominate the data center construction market in Africa. In 2019, Morocco witnessed higher investments followed by Egypt, Kenya, and Nigeria. Colocation and telecommunication service providers are major investors in Africa, followed by enterprises and governments agencies. The increase in internet penetration, smartphone users, and improvement in broadband connectivity is aiding the growth of data across African countries.
The following factors are likely to contribute to the growth of the data center construction market in Middle East Africa during the forecast period:
- Availability of Renewable Energy Prompts Procurement Growth
- Smart City Initiatives Leading Edge Data Center Deployments
- Government Support to Boost Digital Economy in Middle East & Africa
- Cloud Adoption Fueling Data Center Investments
Data Center Construction Market in Middle East Africa - Segmentation
This research report includes a detailed segmentation by, Electrical Infrastructure, general construction, mechanical infrastructure, tier standards, and geography. The adoption of lithium-ion batteries will emerge in the next two years in UAE and Saudi Arabia countries. However, the use of lithium-ion, will pick up in the next 3-4 years in Africa countries, as many operators start to build large and hyperscale facilities. The market for generators will continue to grow because of the continuous construction of large and mega facilities in the region. The adoption of Diesel Rotary Uninterruptible Power Supply (DRUPS) systems is also growing since these systems combine both battery and flywheel UPS topology and a diesel generator to provide backup power during outages.
Data centers operated in Middle East countries do not support the use of free cooling systems. The Middle Eastern data centers market is adopting water-based cooling systems. The direct liquid cooling and immersion cooling solutions are likely to emerge in the market through the deployment of artificial intelligence and machine learning workloads in IoT and big data environment.
The data center market in Saudi Arabia has the presence of both local and global data center contractors. The market lacks a strong skilled workforce to accommodate the growing need for data center operational personnel. However, the facility investments are likely to increase the skilled workforce during the forecast period. The UAE will aid in the growth of greenfield projects as well as modular data centers. The country also has a strong presence of local as well as global data center contractors in the design, construction, installation, and commissioning services.
A majority of data center development in Turkey is greenfield type, whereas modular facilities are confined to enterprise on-premise deployments. In terms of construction, most colocation facilities in South Africa have installed physical security solutions, ranging from perimeters to video surveillance to biometric systems. The rapid growth in colocation data centers will increase the investment in physical security systems in the African market. Data center facilities in Morocco are installing 24X7 physical security with CCTV surveillance, and intrusion detection devices.
Currently, operators in Middle East & Africa are spending on infrastructure across Tier I and Tier II facilities, while focusing on adding redundant infrastructure for power. These data centers have a power capacity of less than 1 MW and are not involved in running mission-critical applications. A majority of under-developed projects across the region fall under the Tier III category. This trend is likely to continue during the forecast period.
Around eight data centers, which were opened in 2019, are of Tier III standard. About 10 Tier III data centers, which were under construction in 2019, are expected to open by Q1 & Q2 of 2020. Tier IV data centers are equipped with at least 2N+1 redundancy in every infrastructure that makes the facility fault-tolerant, with UPS systems and PDUs having 2N+2 redundancy. Amazon Web Services’ data center in Bahrain is one of the major contributors to the Middle East Tier IV market.
Segmentation by Electrical Infrastructure
- UPS
- Generators
- Transfer Switches & Switchgears
- Rack PDUs
- Other Electrical Infrastructure
- Cooling Systems
- CRAC & CRAH Units
- Chillers
- Cooling Towers & Dry Coolers
- Other Units
- Racks
- Other Mechanical Infrastructure
- Building Development
- Installation & Commissioning Services
- Building Designs
- Physical Security
- DCIM
- Tier I & Tier II
- Tier III
- Tier IV
The demand for cloud computing, big data, and IoT technologies will be a predominant driver for data center development in the Middle Eastern region. The investment in the market is aided by the construction of facilities by telecommunication providers, enterprises, government, cloud, and colocation service providers. Similarly, the investment in Africa is growing significantly, aided by the construction of data centers by telecommunication providers, enterprises, government, cloud, and colocation service providers.
Over the last few years, the region witnessed interest from leading cloud service providers such as AWS and Microsoft. Huawei also has a strong presence in the market and provides modular data center solutions for enterprise and government agencies. The demand for cloud services is growing among SMEs in the African region. It is expected that over 50% of the organizations operating in the African region will shift to cloud services by 2025.
Segmentation by Geography
- Middle East
- Saudi Arabia
- UAE
- Turkey
- Jordan
- Other Middle East Countries
- Africa
- South Africa
- Morocco
- Egypt
- Kenya
- Nigeria
- Other African Countries
Multiple electrical infrastructure providers operate in the data center construction market in Middle East Africa. The growing data center construction market is prompting providers to improve the efficiency of solutions that are currently being offered. Many countries in the region suffer from frequent power fluctuations and power outages. This will enable operators to adopt efficient power backup solutions, with UPS systems that offer over 95% efficiency.
The market for VRLA UPS systems will continue to dominate the market. However, the share of VRLA UPS systems will start declining by the end of the forecast period. Schneider Electric, Vertiv, and Huawei have a strong presence in the market.
Prominent Support Infrastructure Providers
- ABB
- Caterpillar
- Cummins
- Eaton
- Euro-Diesel (KINOLT)
- Hitech
- Legrand
- MTU On Site Energy
- Schneider Electric
- STULZ
- Shenzhen Envicool Technology
- Rittal
- Vertiv
- Atkins
- Aveng Grinaker
- Concor
- Deerns
- Edarat Group
- Etix Everywhere
- Enmar Engineering
- Future-tech
- Harinsa Qatar (HQ)
- Huawei
- ISG
- ICS Nett
- Laing O’Rourke
- Linesight
- McLAREN Construction Group
- NOVA Mission Critical
- Qatar Site and Power
- Red-Engineering
- Akbank
- Amazon Web Services (AWS)
- Batelco (Bahrain Telecommunications Company)
- Equinix
- Etisalat Group
- Gulf Data Hub
- Icolo.io
- Internet Technologies Angola (ITA)
- Inwi
- Khanza
- N+ONE
- Raxio Data Center
- Turkcell
- Telecom Italia Sparkle
- Teraco Data Environments
1. What is the market size of the data center construction market analysis in Middle East Africa?
2. What are the factors impacting the growth of the data center construction market forecast in Middle East Africa?
3. What are the drivers, trends, and restraints in the market?
4. Who are the leading vendors and what are their market shares?
1 RESEARCH METHODOLOGY
2 RESEARCH OBJECTIVES
3 RESEARCH PROCESS
4 SCOPE & COVERAGE
4.1 Market Definition
4.2 Base Year
4.3 Scope of The Study
4.4 Market Segments
4.4.1 Market Segmentation by Infrastructure
4.4.2 Market Segmentation by Electrical Infrastructure
4.4.3 Market Segmentation by Mechanical Infrastructure
4.4.4 Market Segmentation by Cooling Systems
4.4.5 Market Segmentation by General Construction
4.4.6 Market Segmentation by Tier Standards
4.4.7 Market Segmentation by Geography
5 REPORT ASSUMPTIONS & CAVEATS
5.1 Key Caveats
5.2 Currency Conversion
5.3 Market Derivation
6 MARKET AT A GLANCE
7 INTRODUCTION
7.1 Internet & Data Growth
7.2 Data Center Site Selection Criteria
8 IMPACT OF COVID-19
8.1 Impact Of COVID-19 On Data Center Industry
8.1.1 Construction Perspective
8.1.2 Infrastructure Production & Procurement
8.1.3 Data Center Operations
8.2 Impact of COVID-19 on Data Center Construction Market in MEA
8.2.1 Data Center Construction Market in MEA
9 MARKET OPPORTUNITIES & TRENDS
9.1 Availability Of Renewable Energy Fuels Procurement Growth
9.2 Smart City Initiatives Fuel Data Center/Edge Deployments
9.3 Government Support To Boost Digital Economy In Mea
10 MARKET GROWTH ENABLERS
10.1 Cloud Adoption Fueling Data Center Investments
10.2 Big Data & IoT Spending Fueling Data Center Growth
10.3 Migration From On-Premise Infrastructure To Colocation & Managed Services
10.4 Increased Investments In Fiber Connectivity
11 MARKET GROWTH RESTRAINTS
11.1 Location Constraints For Data Center Construction
11.2 Lack Of Skilled Workforce
11.3 Budget Constraints & Meagre Investment Support
12 MARKET LANDSCAPE
12.1 Market Overview
12.2 Market Size & Forecast
12.3 Five Forces Analysis
12.3.1 Threat of New Entrants
12.3.2 Bargaining Power of Suppliers
12.3.3 Bargaining Power of Buyers
12.3.4 Threat of Substitutes
12.3.5 Competitive Rivalry
13 BY INFRASTRUCTURE
13.1 Market Snapshot & Growth Engine
13.2 Market Overview
13.3 Electrical Infrastructure
13.3.1 Market Overview
13.3.2 Market Size & Forecast
13.4 Mechanical Infrastructure
13.4.1 Market Overview
13.4.2 Market Size & Forecast
13.5 General Construction
13.5.1 Market Overview
13.5.2 Market Size & Forecast
14 BY ELECTRICAL INFRASTRUCTURE
14.1 Market Snapshot & Growth Engine
14.2 UPS Systems
14.2.1 Market Overview
14.2.2 Market Size & Forecast
14.3 Generators
14.3.1 Market Overview
14.3.2 Market Size & Forecast
14.4 Transfer Switches & Switchgear
14.4.1 Market Overview
14.4.2 Market Size & Forecast
14.5 Power Distribution Units
14.5.1 Market Overview
14.5.2 Market Size & Forecast
14.6 Other Electrical Infrastructure
14.6.1 Market Overview
14.6.2 Market Size & Forecast
15 BY MECHANICAL INFRASTRUCTURE
15.1 Market Snapshot & Growth Engine
15.2 Cooling Systems
15.2.1 Market Overview
15.2.2 Market Size & Forecast
15.3 Racks
15.3.1 Market Overview
15.3.2 Market Size & Forecast
15.4 Other Mechanical Infrastructure
15.4.1 Market Overview
15.4.2 Market Size & Forecast
16 BY COOLING SYSTEMS
16.1 Market Snapshot & Growth Engine
16.2 CRAC & CRAH Units
16.2.1 Market Overview
16.2.2 Market Size & Forecast
16.3 Chiller Units
16.3.1 Market Overview
16.3.2 Market Size & Forecast
16.4 Cooling Towers & Dry Coolers
16.4.1 Market Overview
16.4.2 Market Size & Forecast
16.5 Other Cooling Units
16.5.1 Market Overview
16.5.2 Market Size & Forecast
17 BY COOLING TECHNIQUES
17.1 Market Snapshot & Growth Engine
17.2 Air-Based Cooling Techniques
17.2.1 Market Overview
17.2.2 Market Size & Forecast
17.3 Liquid-Based Cooling Techniques
17.3.1 Market Overview
17.3.2 Market Size & Forecast
18 BY GENERAL CONSTRUCTION
18.1 Market Snapshot & Growth Engine
18.2 Building Development
18.2.1 Market Overview
18.2.2 Market Size & Forecast
18.3 Installation & Commissioning Services
18.3.1 Market Overview
18.3.2 Market Size & Forecast
18.4 Building Design
18.4.1 Market Overview
18.4.2 Market Size & Forecast
18.5 Physical Security
18.5.1 Market Overview
18.5.2 Market Size & Forecast
18.6 DCIM/BMS
18.6.1 Market Overview
18.6.2 Market Size & Forecast
19 BY TIER STANDARDS
19.1 Market Snapshot & Growth Engine
19.2 Overview Of Tier Standards
19.3 TIER I & II
19.3.1 Market Overview
19.3.2 Market Size & Forecast
19.4 TIER III
19.4.1 Market Overview
19.4.2 Market Size & Forecast
19.5 TIER IV
19.5.1 Market Overview
19.5.2 Market Size & Forecast
20 BY GEOGRAPHY
20.1 Market Snapshot & Growth Engine
21 MIDDLE EAST
21.1 Investment: Snapshot & Growth Engine
21.2 Area: Snapshot & Growth Engine
21.3 Power Capacity: Snapshot & Growth Engine
21.4 Market Overview
21.5 Investment: Market Size & Forecast
21.6 Area: Market Size & Forecast
21.7 Power Capacity: Market Size & Forecast
21.8 Infrastructure: Market Size & Forecast
21.9 Saudi Arabia
21.9.1 Market Snapshot & Growth Engine
21.9.2 Market Overview
21.9.3 Investment: Market Size & Forecast
21.9.4 Area: Market Size & Forecast
21.9.5 Power Capacity: Market Size & Forecast
21.9.6 Market by Infrastructure
21.10 UAE
21.10.1 Market Snapshot & Growth Engine
21.10.2 Market Overview
21.10.3 Investment: Market Size & Forecast
21.10.4 Area: Market Size & Forecast
21.10.5 Power Capacity: Market Size & Forecast
21.10.6 Market by Infrastructure
21.11 Turkey
21.11.1 Market Snapshot & Growth Engine
21.11.2 Market Overview
21.11.3 Investment: Market Size & Forecast
21.11.4 Area: Market Size & Forecast
21.11.5 Power Capacity: Market Size & Forecast
21.11.6 Market by Infrastructure
21.12 Jordan
21.12.1 Market Snapshot & Growth Engine
21.12.2 Market Overview
21.12.3 Investment: Market Size & Forecast
21.12.4 Area: Market Size & Forecast
21.12.5 Power Capacity: Market Size & Forecast
21.12.6 Market by Infrastructure
21.13 Other Middle Eastern Countries
21.13.1 Market Snapshot & Growth Engine
21.13.2 Market Overview
21.13.3 Investment: Market Size & Forecast
21.13.4 Area: Market Size & Forecast
21.13.5 Power Capacity: Market Size & Forecast
21.13.6 Market by Infrastructure
22 AFRICA
22.1 Investment: Snapshot & Growth Engine
22.2 Area: Snapshot & Growth Engine
22.3 Power Capacity: Snapshot & Growth Engine
22.4 Market Overview
22.5 Investment: Market Size & Forecast
22.6 Area: Market Size & Forecast
22.7 Power Capacity: Market Size & Forecast
22.8 Infrastructure: Market Size & Forecast
22.9 South Africa
22.9.1 Market Snapshot & Growth Engine
22.9.2 Market Overview
22.9.3 Investment: Market Size & Forecast
22.9.4 Area: Market Size & Forecast
22.9.5 Power Capacity: Market Size & Forecast
22.9.6 Market By Infrastructure
22.10 Morocco
22.10.1 Market Snapshot & Growth Engine
22.10.2 Market Overview
22.10.3 Investment: Market Size & Forecast
22.10.4 Area: Market Size & Forecast
22.10.5 Power Capacity: Market Size & Forecast
22.10.6 Market By Infrastructure
22.11 Egypt
22.11.1 Market Snapshot & Growth Engine
22.11.2 Market Overview
22.11.3 Investment: Market Size & Forecast
22.11.4 Area: Market Size & Forecast
22.11.5 Power Capacity: Market Size & Forecast
22.11.6 Market By Infrastructure
22.12 Kenya
22.12.1 Market Snapshot & Growth Engine
22.12.2 Market Overview
22.12.3 Investment: Market Size & Forecast
22.12.4 Area: Market Size & Forecast
22.12.5 Power Capacity: Market Size And Forecast
22.12.6 Market By Infrastructure
22.13 Nigeria
22.13.1 Market Snapshot & Growth Engine
22.13.2 Market Overview
22.13.3 Investment: Market Size & Forecast
22.13.4 Area: Market Size & Forecast
22.13.5 Power Capacity: Market Size And Forecast
22.13.6 Market By Infrastructure
22.14 Other African Countries
22.14.1 Market Snapshot & Growth Engine
22.14.2 Market Overview
22.14.3 Investment: Market Size & Forecast
22.14.4 Area: Market Size & Forecast
22.14.5 Power Capacity: Market Size & Forecast
22.14.6 Market By Infrastructure
23 COMPETITIVE LANDSCAPE
23.1 Electrical Infrastructure
23.2 Mechanical Infrastructure
23.3 General Construction
24 PROMINENT DATA CENTER SUPPORT INFRASTRUCTURE PROVIDERS
24.1 ABB
24.1.1 Business Overview
24.1.2 Product Offerings
24.1.3 Key News
24.2 Caterpillar
24.2.1 Business Overview
24.2.2 Product Offerings
24.3 Cummins
24.3.1 Business Overview
24.3.2 Product Offerings
24.3.3 Key News
24.4 Eaton
24.4.1 Business Overview
24.4.2 Product Offerings
24.4.3 Key News
24.5 Euro-Diesel (KINOLT)
24.5.1 Business Overview
24.5.2 Product Offerings
24.6 Hitech Power Protection
24.6.1 Business Overview
24.6.2 Product Offerings
24.7 Legrand
24.7.1 Business Overview
24.7.2 Product Offerings
24.8 MTU On Site Energy (Rolls-Royce Power Systems AG)
24.8.1 Business Overview
24.8.2 Product Offerings
24.9 Schneider Electric
24.9.1 Business Overview
24.9.2 Product Offerings
24.9.3 Key News
24.1 STULZ
24.10.1 Business Overview
24.10.2 Product Offerings
24.11 Shenzhen Envicool Technology
24.11.1 Business Overview
24.11.2 Product Offerings
24.12 Rittal
24.12.1 Business Overview
24.12.2 Product Offerings
24.13 VERTIV
24.13.1 Business Overview
24.13.2 Product Offerings
24.13.3 Key News
25 PROMINENT CONSTRUCTION CONTRACTORS
25.1 Atkins
25.1.1 Business Overview
25.1.2 Service Offerings
25.2 Aveng Grinaker
25.2.1 Business Overview
25.2.2 Service Offerings
25.3 Concor
25.3.1 Business Overview
25.3.2 Service Offerings
25.4 Deerns
25.4.1 Business Overview
25.4.2 Service Offerings
25.5 Edarat Group
25.5.1 Business Overview
25.5.2 Service Offerings
25.6 Etix Everywhere (Vantage Data Center)
25.6.1 Business Overview
25.6.2 Service Offerings
25.7 Enmar Engineering
25.7.1 Business Overview
25.7.2 Service Offerings
25.8 FUTURE-TECH
25.8.1 Business Overview
25.8.2 Service Offerings
25.9 Harinsa Qatar
25.9.1 Business Overview
25.9.2 Service Offerings
25.10 Huawei
25.10.1 Business Overview
25.10.2 Service Offerings
25.11 ISG
25.11.1 Business Overview
25.11.2 Service Offerings
25.12 ICS Nett
25.12.1 Business Overview
25.12.2 Service Offerings
25.13 Laing O'Rourke
25.13.1 Business Overview
25.13.2 Service Offerings
25.14 Linesight
25.14.1 Business Overview
25.14.2 Service Offerings
25.15 MCLAREN Construction Group
25.15.1 Business Overview
25.15.2 Service Offerings
25.16 Nova Mission Critical
25.16.1 Business Overview
25.16.2 Service Offerings
25.17 Qatar Site & Power
25.17.1 Business Overview
25.17.2 Service Offerings
25.18 Red-Engineering
25.18.1 Business Overview
25.18.2 Service Offerings
26 PROMINENT DATA CENTER INVESTORS
26.1 AKBANK
26.1.1 Business overview
26.1.2 Service Offerings
26.2 Amazon Web Services (AWS)
26.2.1 Business Overview
26.2.2 Service Offerings
26.3 Batelco
26.3.1 Business Overview
26.3.2 Service Offerings
26.3.3 Key News:
26.4 Equinix
26.4.1 Business Overview
26.4.2 Service Offerings
26.5 Etisalat
26.5.1 Business Overview
26.5.2 Service Offerings
26.6 Gulf Data HUB
26.6.1 Business Overview
26.6.2 Service Offerings
26.7 ICOLO.IO
26.7.1 Business Overview
26.7.2 Service Offerings
26.8 Internet Technologies Angola (ITA)
26.8.1 Business Overview
26.8.2 Service Offerings
26.9 INWI
26.9.1 Business Overview
26.9.2 Service Offerings
26.10 KHANZA
26.10.1 Business Overview
26.10.2 Service Offerings
26.11 N+ ONE
26.11.1 Business Overview
26.11.2 Service Offerings
26.12 Raxio Data Center
26.12.1 Business Overview
26.12.2 Service Offerings
26.13 Turkcell
26.13.1 Business Overview
26.13.2 Service Offerings
26.14 Telecom Italia Sparkle
26.14.1 Business Overview
26.14.2 Service Offerings
26.14.3 Key News
26.15 Teraco Data Environments
26.15.1 Business Overview
26.15.2 Service Offerings
26.16 ZAIN
26.16.1 Business Overview
26.16.2 Service Offerings
27 REPORT SUMMARY
27.1 Key Takeaways
28 QUANTITATIVE SUMMARY
28.1 Overall Market
28.2 Infrastructure: Market Size & Forecast
28.3 Electrical Infrastructure: Market Size & Forecast
28.4 Mechanical Infrastructure: Market Size & Forecast
28.5 Cooling Systems: Market Size & Forecast
28.6 Cooling Technique: Market Sizing & Forecast
28.7 General Construction: Market Size & Forecast
28.8 Tier Standards: Market Size & Forecast
28.9 Middle East
28.9.1 Overall Market
28.9.2 Investment by Country
28.9.3 Investment in Area by Country
28.9.4 Investment in Power Capacity by Country
28.9.5 Market By Infrastructure
28.10 Saudi Arabia
28.10.1 Overall Market
28.10.2 Market By Infrastructure
28.11 UAE
28.11.1 Overall Market
28.11.2 Market By Infrastructure
28.12 Turkey
28.12.1 Overall Market
28.12.2 Market By Infrastructure
28.13 Jordan
28.13.1 Overall Market
28.13.2 Market By Infrastructure
28.14 OTHER MIDDLE EASTERN COUNTRIES
28.14.1 Overall Market
28.14.2 Market By Infrastructure
28.15 Africa
28.15.1 Overall Market
28.15.2 Investment by Country
28.15.3 Investment in Area by Country
28.15.4 Investment in Power Capacity by Country
28.15.5 Market By Infrastructure
28.16 South Africa
28.16.1 Overall Market
28.16.2 Market By Infrastructure
28.17 Morocco
28.17.1 Overall Market
28.17.2 Market By Infrastructure
28.18 EGYPT
28.18.1 Overall Market
28.18.2 Market By Infrastructure
28.19 Kenya
28.19.1 Overall Market
28.19.2 Market By Infrastructure
28.20 Nigeria
28.20.1 Overall Market
28.20.2 Market By Infrastructure
28.21 Other African Countries
28.21.1 Overall Market
28.21.2 Market By Infrastructure
29 APPENDIX
29.1 Abbreviations
2 RESEARCH OBJECTIVES
3 RESEARCH PROCESS
4 SCOPE & COVERAGE
4.1 Market Definition
4.2 Base Year
4.3 Scope of The Study
4.4 Market Segments
4.4.1 Market Segmentation by Infrastructure
4.4.2 Market Segmentation by Electrical Infrastructure
4.4.3 Market Segmentation by Mechanical Infrastructure
4.4.4 Market Segmentation by Cooling Systems
4.4.5 Market Segmentation by General Construction
4.4.6 Market Segmentation by Tier Standards
4.4.7 Market Segmentation by Geography
5 REPORT ASSUMPTIONS & CAVEATS
5.1 Key Caveats
5.2 Currency Conversion
5.3 Market Derivation
6 MARKET AT A GLANCE
7 INTRODUCTION
7.1 Internet & Data Growth
7.2 Data Center Site Selection Criteria
8 IMPACT OF COVID-19
8.1 Impact Of COVID-19 On Data Center Industry
8.1.1 Construction Perspective
8.1.2 Infrastructure Production & Procurement
8.1.3 Data Center Operations
8.2 Impact of COVID-19 on Data Center Construction Market in MEA
8.2.1 Data Center Construction Market in MEA
9 MARKET OPPORTUNITIES & TRENDS
9.1 Availability Of Renewable Energy Fuels Procurement Growth
9.2 Smart City Initiatives Fuel Data Center/Edge Deployments
9.3 Government Support To Boost Digital Economy In Mea
10 MARKET GROWTH ENABLERS
10.1 Cloud Adoption Fueling Data Center Investments
10.2 Big Data & IoT Spending Fueling Data Center Growth
10.3 Migration From On-Premise Infrastructure To Colocation & Managed Services
10.4 Increased Investments In Fiber Connectivity
11 MARKET GROWTH RESTRAINTS
11.1 Location Constraints For Data Center Construction
11.2 Lack Of Skilled Workforce
11.3 Budget Constraints & Meagre Investment Support
12 MARKET LANDSCAPE
12.1 Market Overview
12.2 Market Size & Forecast
12.3 Five Forces Analysis
12.3.1 Threat of New Entrants
12.3.2 Bargaining Power of Suppliers
12.3.3 Bargaining Power of Buyers
12.3.4 Threat of Substitutes
12.3.5 Competitive Rivalry
13 BY INFRASTRUCTURE
13.1 Market Snapshot & Growth Engine
13.2 Market Overview
13.3 Electrical Infrastructure
13.3.1 Market Overview
13.3.2 Market Size & Forecast
13.4 Mechanical Infrastructure
13.4.1 Market Overview
13.4.2 Market Size & Forecast
13.5 General Construction
13.5.1 Market Overview
13.5.2 Market Size & Forecast
14 BY ELECTRICAL INFRASTRUCTURE
14.1 Market Snapshot & Growth Engine
14.2 UPS Systems
14.2.1 Market Overview
14.2.2 Market Size & Forecast
14.3 Generators
14.3.1 Market Overview
14.3.2 Market Size & Forecast
14.4 Transfer Switches & Switchgear
14.4.1 Market Overview
14.4.2 Market Size & Forecast
14.5 Power Distribution Units
14.5.1 Market Overview
14.5.2 Market Size & Forecast
14.6 Other Electrical Infrastructure
14.6.1 Market Overview
14.6.2 Market Size & Forecast
15 BY MECHANICAL INFRASTRUCTURE
15.1 Market Snapshot & Growth Engine
15.2 Cooling Systems
15.2.1 Market Overview
15.2.2 Market Size & Forecast
15.3 Racks
15.3.1 Market Overview
15.3.2 Market Size & Forecast
15.4 Other Mechanical Infrastructure
15.4.1 Market Overview
15.4.2 Market Size & Forecast
16 BY COOLING SYSTEMS
16.1 Market Snapshot & Growth Engine
16.2 CRAC & CRAH Units
16.2.1 Market Overview
16.2.2 Market Size & Forecast
16.3 Chiller Units
16.3.1 Market Overview
16.3.2 Market Size & Forecast
16.4 Cooling Towers & Dry Coolers
16.4.1 Market Overview
16.4.2 Market Size & Forecast
16.5 Other Cooling Units
16.5.1 Market Overview
16.5.2 Market Size & Forecast
17 BY COOLING TECHNIQUES
17.1 Market Snapshot & Growth Engine
17.2 Air-Based Cooling Techniques
17.2.1 Market Overview
17.2.2 Market Size & Forecast
17.3 Liquid-Based Cooling Techniques
17.3.1 Market Overview
17.3.2 Market Size & Forecast
18 BY GENERAL CONSTRUCTION
18.1 Market Snapshot & Growth Engine
18.2 Building Development
18.2.1 Market Overview
18.2.2 Market Size & Forecast
18.3 Installation & Commissioning Services
18.3.1 Market Overview
18.3.2 Market Size & Forecast
18.4 Building Design
18.4.1 Market Overview
18.4.2 Market Size & Forecast
18.5 Physical Security
18.5.1 Market Overview
18.5.2 Market Size & Forecast
18.6 DCIM/BMS
18.6.1 Market Overview
18.6.2 Market Size & Forecast
19 BY TIER STANDARDS
19.1 Market Snapshot & Growth Engine
19.2 Overview Of Tier Standards
19.3 TIER I & II
19.3.1 Market Overview
19.3.2 Market Size & Forecast
19.4 TIER III
19.4.1 Market Overview
19.4.2 Market Size & Forecast
19.5 TIER IV
19.5.1 Market Overview
19.5.2 Market Size & Forecast
20 BY GEOGRAPHY
20.1 Market Snapshot & Growth Engine
21 MIDDLE EAST
21.1 Investment: Snapshot & Growth Engine
21.2 Area: Snapshot & Growth Engine
21.3 Power Capacity: Snapshot & Growth Engine
21.4 Market Overview
21.5 Investment: Market Size & Forecast
21.6 Area: Market Size & Forecast
21.7 Power Capacity: Market Size & Forecast
21.8 Infrastructure: Market Size & Forecast
21.9 Saudi Arabia
21.9.1 Market Snapshot & Growth Engine
21.9.2 Market Overview
21.9.3 Investment: Market Size & Forecast
21.9.4 Area: Market Size & Forecast
21.9.5 Power Capacity: Market Size & Forecast
21.9.6 Market by Infrastructure
21.10 UAE
21.10.1 Market Snapshot & Growth Engine
21.10.2 Market Overview
21.10.3 Investment: Market Size & Forecast
21.10.4 Area: Market Size & Forecast
21.10.5 Power Capacity: Market Size & Forecast
21.10.6 Market by Infrastructure
21.11 Turkey
21.11.1 Market Snapshot & Growth Engine
21.11.2 Market Overview
21.11.3 Investment: Market Size & Forecast
21.11.4 Area: Market Size & Forecast
21.11.5 Power Capacity: Market Size & Forecast
21.11.6 Market by Infrastructure
21.12 Jordan
21.12.1 Market Snapshot & Growth Engine
21.12.2 Market Overview
21.12.3 Investment: Market Size & Forecast
21.12.4 Area: Market Size & Forecast
21.12.5 Power Capacity: Market Size & Forecast
21.12.6 Market by Infrastructure
21.13 Other Middle Eastern Countries
21.13.1 Market Snapshot & Growth Engine
21.13.2 Market Overview
21.13.3 Investment: Market Size & Forecast
21.13.4 Area: Market Size & Forecast
21.13.5 Power Capacity: Market Size & Forecast
21.13.6 Market by Infrastructure
22 AFRICA
22.1 Investment: Snapshot & Growth Engine
22.2 Area: Snapshot & Growth Engine
22.3 Power Capacity: Snapshot & Growth Engine
22.4 Market Overview
22.5 Investment: Market Size & Forecast
22.6 Area: Market Size & Forecast
22.7 Power Capacity: Market Size & Forecast
22.8 Infrastructure: Market Size & Forecast
22.9 South Africa
22.9.1 Market Snapshot & Growth Engine
22.9.2 Market Overview
22.9.3 Investment: Market Size & Forecast
22.9.4 Area: Market Size & Forecast
22.9.5 Power Capacity: Market Size & Forecast
22.9.6 Market By Infrastructure
22.10 Morocco
22.10.1 Market Snapshot & Growth Engine
22.10.2 Market Overview
22.10.3 Investment: Market Size & Forecast
22.10.4 Area: Market Size & Forecast
22.10.5 Power Capacity: Market Size & Forecast
22.10.6 Market By Infrastructure
22.11 Egypt
22.11.1 Market Snapshot & Growth Engine
22.11.2 Market Overview
22.11.3 Investment: Market Size & Forecast
22.11.4 Area: Market Size & Forecast
22.11.5 Power Capacity: Market Size & Forecast
22.11.6 Market By Infrastructure
22.12 Kenya
22.12.1 Market Snapshot & Growth Engine
22.12.2 Market Overview
22.12.3 Investment: Market Size & Forecast
22.12.4 Area: Market Size & Forecast
22.12.5 Power Capacity: Market Size And Forecast
22.12.6 Market By Infrastructure
22.13 Nigeria
22.13.1 Market Snapshot & Growth Engine
22.13.2 Market Overview
22.13.3 Investment: Market Size & Forecast
22.13.4 Area: Market Size & Forecast
22.13.5 Power Capacity: Market Size And Forecast
22.13.6 Market By Infrastructure
22.14 Other African Countries
22.14.1 Market Snapshot & Growth Engine
22.14.2 Market Overview
22.14.3 Investment: Market Size & Forecast
22.14.4 Area: Market Size & Forecast
22.14.5 Power Capacity: Market Size & Forecast
22.14.6 Market By Infrastructure
23 COMPETITIVE LANDSCAPE
23.1 Electrical Infrastructure
23.2 Mechanical Infrastructure
23.3 General Construction
24 PROMINENT DATA CENTER SUPPORT INFRASTRUCTURE PROVIDERS
24.1 ABB
24.1.1 Business Overview
24.1.2 Product Offerings
24.1.3 Key News
24.2 Caterpillar
24.2.1 Business Overview
24.2.2 Product Offerings
24.3 Cummins
24.3.1 Business Overview
24.3.2 Product Offerings
24.3.3 Key News
24.4 Eaton
24.4.1 Business Overview
24.4.2 Product Offerings
24.4.3 Key News
24.5 Euro-Diesel (KINOLT)
24.5.1 Business Overview
24.5.2 Product Offerings
24.6 Hitech Power Protection
24.6.1 Business Overview
24.6.2 Product Offerings
24.7 Legrand
24.7.1 Business Overview
24.7.2 Product Offerings
24.8 MTU On Site Energy (Rolls-Royce Power Systems AG)
24.8.1 Business Overview
24.8.2 Product Offerings
24.9 Schneider Electric
24.9.1 Business Overview
24.9.2 Product Offerings
24.9.3 Key News
24.1 STULZ
24.10.1 Business Overview
24.10.2 Product Offerings
24.11 Shenzhen Envicool Technology
24.11.1 Business Overview
24.11.2 Product Offerings
24.12 Rittal
24.12.1 Business Overview
24.12.2 Product Offerings
24.13 VERTIV
24.13.1 Business Overview
24.13.2 Product Offerings
24.13.3 Key News
25 PROMINENT CONSTRUCTION CONTRACTORS
25.1 Atkins
25.1.1 Business Overview
25.1.2 Service Offerings
25.2 Aveng Grinaker
25.2.1 Business Overview
25.2.2 Service Offerings
25.3 Concor
25.3.1 Business Overview
25.3.2 Service Offerings
25.4 Deerns
25.4.1 Business Overview
25.4.2 Service Offerings
25.5 Edarat Group
25.5.1 Business Overview
25.5.2 Service Offerings
25.6 Etix Everywhere (Vantage Data Center)
25.6.1 Business Overview
25.6.2 Service Offerings
25.7 Enmar Engineering
25.7.1 Business Overview
25.7.2 Service Offerings
25.8 FUTURE-TECH
25.8.1 Business Overview
25.8.2 Service Offerings
25.9 Harinsa Qatar
25.9.1 Business Overview
25.9.2 Service Offerings
25.10 Huawei
25.10.1 Business Overview
25.10.2 Service Offerings
25.11 ISG
25.11.1 Business Overview
25.11.2 Service Offerings
25.12 ICS Nett
25.12.1 Business Overview
25.12.2 Service Offerings
25.13 Laing O'Rourke
25.13.1 Business Overview
25.13.2 Service Offerings
25.14 Linesight
25.14.1 Business Overview
25.14.2 Service Offerings
25.15 MCLAREN Construction Group
25.15.1 Business Overview
25.15.2 Service Offerings
25.16 Nova Mission Critical
25.16.1 Business Overview
25.16.2 Service Offerings
25.17 Qatar Site & Power
25.17.1 Business Overview
25.17.2 Service Offerings
25.18 Red-Engineering
25.18.1 Business Overview
25.18.2 Service Offerings
26 PROMINENT DATA CENTER INVESTORS
26.1 AKBANK
26.1.1 Business overview
26.1.2 Service Offerings
26.2 Amazon Web Services (AWS)
26.2.1 Business Overview
26.2.2 Service Offerings
26.3 Batelco
26.3.1 Business Overview
26.3.2 Service Offerings
26.3.3 Key News:
26.4 Equinix
26.4.1 Business Overview
26.4.2 Service Offerings
26.5 Etisalat
26.5.1 Business Overview
26.5.2 Service Offerings
26.6 Gulf Data HUB
26.6.1 Business Overview
26.6.2 Service Offerings
26.7 ICOLO.IO
26.7.1 Business Overview
26.7.2 Service Offerings
26.8 Internet Technologies Angola (ITA)
26.8.1 Business Overview
26.8.2 Service Offerings
26.9 INWI
26.9.1 Business Overview
26.9.2 Service Offerings
26.10 KHANZA
26.10.1 Business Overview
26.10.2 Service Offerings
26.11 N+ ONE
26.11.1 Business Overview
26.11.2 Service Offerings
26.12 Raxio Data Center
26.12.1 Business Overview
26.12.2 Service Offerings
26.13 Turkcell
26.13.1 Business Overview
26.13.2 Service Offerings
26.14 Telecom Italia Sparkle
26.14.1 Business Overview
26.14.2 Service Offerings
26.14.3 Key News
26.15 Teraco Data Environments
26.15.1 Business Overview
26.15.2 Service Offerings
26.16 ZAIN
26.16.1 Business Overview
26.16.2 Service Offerings
27 REPORT SUMMARY
27.1 Key Takeaways
28 QUANTITATIVE SUMMARY
28.1 Overall Market
28.2 Infrastructure: Market Size & Forecast
28.3 Electrical Infrastructure: Market Size & Forecast
28.4 Mechanical Infrastructure: Market Size & Forecast
28.5 Cooling Systems: Market Size & Forecast
28.6 Cooling Technique: Market Sizing & Forecast
28.7 General Construction: Market Size & Forecast
28.8 Tier Standards: Market Size & Forecast
28.9 Middle East
28.9.1 Overall Market
28.9.2 Investment by Country
28.9.3 Investment in Area by Country
28.9.4 Investment in Power Capacity by Country
28.9.5 Market By Infrastructure
28.10 Saudi Arabia
28.10.1 Overall Market
28.10.2 Market By Infrastructure
28.11 UAE
28.11.1 Overall Market
28.11.2 Market By Infrastructure
28.12 Turkey
28.12.1 Overall Market
28.12.2 Market By Infrastructure
28.13 Jordan
28.13.1 Overall Market
28.13.2 Market By Infrastructure
28.14 OTHER MIDDLE EASTERN COUNTRIES
28.14.1 Overall Market
28.14.2 Market By Infrastructure
28.15 Africa
28.15.1 Overall Market
28.15.2 Investment by Country
28.15.3 Investment in Area by Country
28.15.4 Investment in Power Capacity by Country
28.15.5 Market By Infrastructure
28.16 South Africa
28.16.1 Overall Market
28.16.2 Market By Infrastructure
28.17 Morocco
28.17.1 Overall Market
28.17.2 Market By Infrastructure
28.18 EGYPT
28.18.1 Overall Market
28.18.2 Market By Infrastructure
28.19 Kenya
28.19.1 Overall Market
28.19.2 Market By Infrastructure
28.20 Nigeria
28.20.1 Overall Market
28.20.2 Market By Infrastructure
28.21 Other African Countries
28.21.1 Overall Market
28.21.2 Market By Infrastructure
29 APPENDIX
29.1 Abbreviations
LIST OF EXHIBITS
Exhibit 1 Segmentation of Data Center Construction Market in MEA
Exhibit 2 Market Size Calculation Approach 2019
Exhibit 3 Internet Penetration Across MEA in 2019
Exhibit 4 Data Center Construction Market in MEA 2019?2025 ($ million)
Exhibit 5 Impact of Availability of Renewable Energy Fuels Procurement Growth
Exhibit 6 Impact of Smart City Initiatives Leading Edge Data Center Deployments
Exhibit 7 Impact of Government Support to Boost Digital Economy in MEA
Exhibit 8 Impact of Cloud Adoption Fueling Data Center Investments
Exhibit 9 Impact of Big Data & IoT Spending Fueling Data Center Growth
Exhibit 10 Impact of Migration from On-Premise Infrastructure to Colocation & Managed Services
Exhibit 11 Impact of Increased Investments in Fiber Connectivity
Exhibit 12 Impact of Location Constraints for Data Center Construction
Exhibit 13 Impact of Lack of Skilled Workforce
Exhibit 14 Impact of Budget Constraints & Meagre Investment Support
Exhibit 15 Data Center Construction Market in MEA 2019–2025 ($ million)
Exhibit 16 Data Center Construction Market in MEA by Area 2019–2025 (Million Square Feet)
Exhibit 17 Data Center Construction Market in MEA by Power Capacity 2019–2025 (MW)
Exhibit 18 Five Forces Analysis 2019
Exhibit 19 Incremental Growth by Infrastructure 2019?2025
Exhibit 20 Data Center Construction Market in MEA by Infrastructure
Exhibit 21 Data Center Construction Electrical Infrastructure Market in MEA 2019?2025 ($ million)
Exhibit 22 Data Center Construction Mechanical Infrastructure Market in MEA 2019?2025 ($ million)
Exhibit 23 Data Center General Construction Market in MEA 2019?2025 ($ million)
Exhibit 24 Incremental Growth by Electrical Infrastructure 2019?2025
Exhibit 25 Data Center UPS Systems Market in MEA 2019?2025 ($ million)
Exhibit 26 Data Center Generators Market in MEA 2019?2025 ($ million)
Exhibit 27 Data Center Transfer Switches & Switchgears Market in MEA 2019?2025 ($ million)
Exhibit 28 Data Center Construction PDUs Market in MEA 2019?2025 ($ million)
Exhibit 29 Data Center Other Electrical Infrastructure Construction Market in MEA 2019?2025 ($ million)
Exhibit 30 Incremental Growth by Mechanical Infrastructure 2019?2025
Exhibit 31 Data Center Construction Cooling Systems Market in MEA 2019?2025 ($ million)
Exhibit 32 Data Center Construction Racks Market in MEA 2019–2025 ($ million)
Exhibit 33 Data Center Other Mechanical Infrastructure Market in MEA 2019?2025 ($ million)
Exhibit 34 Incremental Growth by Cooling Systems 2019?2025
Exhibit 35 Data Center Construction CRAC & CRAH Market in MEA 2019?2025 ($ million)
Exhibit 36 Data Center Construction Chiller Market in MEA 2019?2025 ($ million)
Exhibit 37 Data Center Cooling Towers & Dry Coolers Market in MEA 2019?2025 ($ million)
Exhibit 38 Data Center Construction Other Cooling Units Market in MEA 2019?2025 ($ million)
Exhibit 39 Incremental Growth by Cooling Techniques 2019?2025
Exhibit 40 Data Center Air-based Cooling Construction Market in MEA 2019?2025 ($ million)
Exhibit 41 Data Center Liquid-based Cooling Construction Market in MEA 2019?2025 ($ million)
Exhibit 42 Incremental Growth by General Construction 2019?2025
Exhibit 43 Data Center Building Development Market in MEA 2019–2025 ($ million)
Exhibit 44 Data Center Installation & Commissioning Construction Market in MEA 2019–2025 ($ million)
Exhibit 45 Data Center Construction Building Design Market in MEA 2019–2025 ($ million)
Exhibit 46 Data Center Physical Security Construction Market in MEA 2019–2025 ($ million)
Exhibit 47 Data Center DCIM/BMS Construction Market in MEA 2019–2025 ($ million)
Exhibit 48 Incremental Growth by Tier Standards 2019?2025
Exhibit 49 Overview of Tier Standards
Exhibit 50 Tier I & Tier II Data Center Construction Market in MEA 2019–2025 ($ million)
Exhibit 51 Tier III Data Center Construction Market in MEA 2019–2025 ($ million)
Exhibit 52 Tier IV Data Center Construction Market in MEA 2019?2025 ($ million)
Exhibit 53 Incremental Growth in MEA 2019 & 2025
Exhibit 54 Incremental Growth in Middle East by Investment 2019?2025 ($ million)
Exhibit 55 Incremental Growth in Middle East by Area 2019?2025 (thousand square feet)
Exhibit 56 Incremental Growth in Middle East by Power Capacity 2019?2025 (MW)
Exhibit 57 Data Center Construction Market in Middle East 2019–2025 ($ million)
Exhibit 58 Data Center Construction Market in Middle East by Area 2019–2025 (Thousand Square Feet)
Exhibit 59 Data Center Construction Market in Middle East by Power Capacity 2019–2025 (MW)
Exhibit 60 Data Center Infrastructure Market in Middle East 2019?2025 ($ million)
Exhibit 61 Snapshot – Data Center Construction Market in Saudi Arabia 2019?2025
Exhibit 62 Data Center Construction Market in Saudi Arabia by Investment 2019–2025 ($ million)
Exhibit 63 Data Center Construction Market in Saudi Arabia by Area 2019–2025 (thousand square feet)
Exhibit 64 Data Center Construction Market in Saudi Arabia by Power Capacity 2019–2025 (MW)
Exhibit 65 Data Center Infrastructure Market in Saudi Arabia 2019–2025 ($ million)
Exhibit 66 Snapshot – Data Center Construction Market in UAE 2019?2025
Exhibit 67 Data Center Construction Market in UAE by Investment 2019–2025 ($ million)
Exhibit 68 Data Center Construction Market in UAE by Area 2019–2025 (thousand square feet)
Exhibit 69 Data Center Construction Market in UAE by Power Capacity 2019–2025 (MW)
Exhibit 70 Data Center Infrastructure Market in UAE 2019–2025 ($ million)
Exhibit 71 Snapshot – Data Center Construction Market in Turkey 2019?2025
Exhibit 72 Data Center Construction Market in Turkey by Investment 2019–2025 ($ million)
Exhibit 73 Data Center Construction Market in Turkey by Area 2019–2025 (thousand square feet)
Exhibit 74 Data Center Construction Market in Turkey by Power Capacity 2019–2025 (MW)
Exhibit 75 Data Center Infrastructure Market in Turkey 2019–2025 ($ million)
Exhibit 76 Snapshot – Data Center Construction Market in Jordan 2019?2025
Exhibit 77 Data Center Construction Market in Jordan by Investment 2019–2025 ($ million)
Exhibit 78 Data Center Construction Market in Jordan by Area 2019–2025 (thousand square feet)
Exhibit 79 Data Center Construction Market in Jordan by Power Capacity 2019–2025 (MW)
Exhibit 80 Data Center Infrastructure Market in Jordan 2019–2025 ($ million)
Exhibit 81 Snapshot – Data Center Construction Market in Other ME Countries 2019?2025
Exhibit 82 Data Center Construction Market in Other ME Countries by Investment 2019–2025 ($ million)
Exhibit 83 Data Center Construction Market in Other ME Countries by Area 2019–2025 (thousand square feet)
Exhibit 84 Data Center Construction Market in Other ME Countries by Power Capacity 2019–2025 (MW)
Exhibit 85 Data Center Infrastructure Market in Other ME Countries 2019–2025 ($ million)
Exhibit 86 Incremental Growth in Africa by Investment 2019?2025 ($ million)
Exhibit 87 Incremental Growth in Africa by Area 2019?2025 (thousand square feet)
Exhibit 88 Incremental Growth in Africa by Power Capacity 2019?2025 (MW)
Exhibit 89 Data Center Construction Market in Africa 2019–2025 ($ million)
Exhibit 90 Data Center Construction Market in Africa by Area 2019–2025 (Thousand Square Feet)
Exhibit 91 Data Center Construction Market in Africa by Power Capacity 2019–2025 (MW)
Exhibit 92 Data Center Construction Infrastructure Market in Africa 2019?2025 ($ million)
Exhibit 93 Snapshot – Data Center Construction Market in South Africa 2019?2025
Exhibit 94 Data Center Construction Market in South Africa 2019?2025 ($ million)
Exhibit 95 Data Center Construction Market in South Africa by Area 2019?2025 (Thousand Square Feet)
Exhibit 96 Data Center Construction Market in South Africa by Power Capacity 2019?2025 (MW)
Exhibit 97 Data Center Construction Infrastructure Market in South Africa 2019?2025 ($ million)
Exhibit 98 Snapshot – Data Center Construction Market in Morocco 2019?2025
Exhibit 99 Data Center Construction Market in Morocco 2019?2025 ($ million)
Exhibit 100 Data Center Construction Market in Morocco by Area 2019?2025 (Thousand Square Feet)
Exhibit 101 Data Center Construction Market in Morocco by Power Capacity 2019?2025 (MW)
Exhibit 102 Data Center Construction Infrastructure Market in Morocco 2019?2025 ($ million)
Exhibit 103 Snapshot – Data Center Construction Market in Egypt 2019?2025
Exhibit 104 Data Center Construction Market in Egypt 2019–2025 ($ million)
Exhibit 105 Data Center Construction Market in Egypt by Area 2019–2025 (thousand of square feet)
Exhibit 106 Data Center Construction Market in Egypt by Power Capacity 2019–2025 (MW)
Exhibit 107 Data Center Construction Infrastructure Market in Egypt 2019?2025 ($ million)
Exhibit 108 Snapshot – Data Center Construction Market in Kenya 2019?2025
Exhibit 109 Data Center Construction Market in Kenya 2019?2025 ($ million)
Exhibit 110 Data Center Construction Market in Kenya by Area 2019?2025 (Thousand Square Feet)
Exhibit 111 Data Center Construction Market in Kenya by Power Capacity 2019?2025 (MW)
Exhibit 112 Data Center Construction Infrastructure Market in Kenya 2019–2025 ($ million)
Exhibit 113 Snapshot – Data Center Construction Market in Nigeria 2019?2025
Exhibit 114 Data Center Construction Market in Nigeria 2019?2025 ($ million)
Exhibit 115 Data Center Construction Market in Nigeria by Area 2019?2025 (Thousand Square Feet)
Exhibit 116 Data Center Construction Market in Nigeria by Power Capacity 2019?2025 (MW)
Exhibit 117 Data Center Construction Infrastructure Market in Nigeria 2019?2025 ($ million)
Exhibit 118 Snapshot – Data Center Construction Market in Other African Countries 2019?2025
Exhibit 119 Data Center Construction Market in Other African Countries 2019?2025 ($ million)
Exhibit 120 Data Center Construction Market in Other African Countries by Area 2019?2025 (Thousand Square Feet)
Exhibit 121 Data Center Construction Market in Other African Countries by Power Capacity 2019?2025 (MW)
Exhibit 122 Data Center Construction Infrastructure Market in Other African Countries2019?2025 ($ million)
Exhibit 1 Segmentation of Data Center Construction Market in MEA
Exhibit 2 Market Size Calculation Approach 2019
Exhibit 3 Internet Penetration Across MEA in 2019
Exhibit 4 Data Center Construction Market in MEA 2019?2025 ($ million)
Exhibit 5 Impact of Availability of Renewable Energy Fuels Procurement Growth
Exhibit 6 Impact of Smart City Initiatives Leading Edge Data Center Deployments
Exhibit 7 Impact of Government Support to Boost Digital Economy in MEA
Exhibit 8 Impact of Cloud Adoption Fueling Data Center Investments
Exhibit 9 Impact of Big Data & IoT Spending Fueling Data Center Growth
Exhibit 10 Impact of Migration from On-Premise Infrastructure to Colocation & Managed Services
Exhibit 11 Impact of Increased Investments in Fiber Connectivity
Exhibit 12 Impact of Location Constraints for Data Center Construction
Exhibit 13 Impact of Lack of Skilled Workforce
Exhibit 14 Impact of Budget Constraints & Meagre Investment Support
Exhibit 15 Data Center Construction Market in MEA 2019–2025 ($ million)
Exhibit 16 Data Center Construction Market in MEA by Area 2019–2025 (Million Square Feet)
Exhibit 17 Data Center Construction Market in MEA by Power Capacity 2019–2025 (MW)
Exhibit 18 Five Forces Analysis 2019
Exhibit 19 Incremental Growth by Infrastructure 2019?2025
Exhibit 20 Data Center Construction Market in MEA by Infrastructure
Exhibit 21 Data Center Construction Electrical Infrastructure Market in MEA 2019?2025 ($ million)
Exhibit 22 Data Center Construction Mechanical Infrastructure Market in MEA 2019?2025 ($ million)
Exhibit 23 Data Center General Construction Market in MEA 2019?2025 ($ million)
Exhibit 24 Incremental Growth by Electrical Infrastructure 2019?2025
Exhibit 25 Data Center UPS Systems Market in MEA 2019?2025 ($ million)
Exhibit 26 Data Center Generators Market in MEA 2019?2025 ($ million)
Exhibit 27 Data Center Transfer Switches & Switchgears Market in MEA 2019?2025 ($ million)
Exhibit 28 Data Center Construction PDUs Market in MEA 2019?2025 ($ million)
Exhibit 29 Data Center Other Electrical Infrastructure Construction Market in MEA 2019?2025 ($ million)
Exhibit 30 Incremental Growth by Mechanical Infrastructure 2019?2025
Exhibit 31 Data Center Construction Cooling Systems Market in MEA 2019?2025 ($ million)
Exhibit 32 Data Center Construction Racks Market in MEA 2019–2025 ($ million)
Exhibit 33 Data Center Other Mechanical Infrastructure Market in MEA 2019?2025 ($ million)
Exhibit 34 Incremental Growth by Cooling Systems 2019?2025
Exhibit 35 Data Center Construction CRAC & CRAH Market in MEA 2019?2025 ($ million)
Exhibit 36 Data Center Construction Chiller Market in MEA 2019?2025 ($ million)
Exhibit 37 Data Center Cooling Towers & Dry Coolers Market in MEA 2019?2025 ($ million)
Exhibit 38 Data Center Construction Other Cooling Units Market in MEA 2019?2025 ($ million)
Exhibit 39 Incremental Growth by Cooling Techniques 2019?2025
Exhibit 40 Data Center Air-based Cooling Construction Market in MEA 2019?2025 ($ million)
Exhibit 41 Data Center Liquid-based Cooling Construction Market in MEA 2019?2025 ($ million)
Exhibit 42 Incremental Growth by General Construction 2019?2025
Exhibit 43 Data Center Building Development Market in MEA 2019–2025 ($ million)
Exhibit 44 Data Center Installation & Commissioning Construction Market in MEA 2019–2025 ($ million)
Exhibit 45 Data Center Construction Building Design Market in MEA 2019–2025 ($ million)
Exhibit 46 Data Center Physical Security Construction Market in MEA 2019–2025 ($ million)
Exhibit 47 Data Center DCIM/BMS Construction Market in MEA 2019–2025 ($ million)
Exhibit 48 Incremental Growth by Tier Standards 2019?2025
Exhibit 49 Overview of Tier Standards
Exhibit 50 Tier I & Tier II Data Center Construction Market in MEA 2019–2025 ($ million)
Exhibit 51 Tier III Data Center Construction Market in MEA 2019–2025 ($ million)
Exhibit 52 Tier IV Data Center Construction Market in MEA 2019?2025 ($ million)
Exhibit 53 Incremental Growth in MEA 2019 & 2025
Exhibit 54 Incremental Growth in Middle East by Investment 2019?2025 ($ million)
Exhibit 55 Incremental Growth in Middle East by Area 2019?2025 (thousand square feet)
Exhibit 56 Incremental Growth in Middle East by Power Capacity 2019?2025 (MW)
Exhibit 57 Data Center Construction Market in Middle East 2019–2025 ($ million)
Exhibit 58 Data Center Construction Market in Middle East by Area 2019–2025 (Thousand Square Feet)
Exhibit 59 Data Center Construction Market in Middle East by Power Capacity 2019–2025 (MW)
Exhibit 60 Data Center Infrastructure Market in Middle East 2019?2025 ($ million)
Exhibit 61 Snapshot – Data Center Construction Market in Saudi Arabia 2019?2025
Exhibit 62 Data Center Construction Market in Saudi Arabia by Investment 2019–2025 ($ million)
Exhibit 63 Data Center Construction Market in Saudi Arabia by Area 2019–2025 (thousand square feet)
Exhibit 64 Data Center Construction Market in Saudi Arabia by Power Capacity 2019–2025 (MW)
Exhibit 65 Data Center Infrastructure Market in Saudi Arabia 2019–2025 ($ million)
Exhibit 66 Snapshot – Data Center Construction Market in UAE 2019?2025
Exhibit 67 Data Center Construction Market in UAE by Investment 2019–2025 ($ million)
Exhibit 68 Data Center Construction Market in UAE by Area 2019–2025 (thousand square feet)
Exhibit 69 Data Center Construction Market in UAE by Power Capacity 2019–2025 (MW)
Exhibit 70 Data Center Infrastructure Market in UAE 2019–2025 ($ million)
Exhibit 71 Snapshot – Data Center Construction Market in Turkey 2019?2025
Exhibit 72 Data Center Construction Market in Turkey by Investment 2019–2025 ($ million)
Exhibit 73 Data Center Construction Market in Turkey by Area 2019–2025 (thousand square feet)
Exhibit 74 Data Center Construction Market in Turkey by Power Capacity 2019–2025 (MW)
Exhibit 75 Data Center Infrastructure Market in Turkey 2019–2025 ($ million)
Exhibit 76 Snapshot – Data Center Construction Market in Jordan 2019?2025
Exhibit 77 Data Center Construction Market in Jordan by Investment 2019–2025 ($ million)
Exhibit 78 Data Center Construction Market in Jordan by Area 2019–2025 (thousand square feet)
Exhibit 79 Data Center Construction Market in Jordan by Power Capacity 2019–2025 (MW)
Exhibit 80 Data Center Infrastructure Market in Jordan 2019–2025 ($ million)
Exhibit 81 Snapshot – Data Center Construction Market in Other ME Countries 2019?2025
Exhibit 82 Data Center Construction Market in Other ME Countries by Investment 2019–2025 ($ million)
Exhibit 83 Data Center Construction Market in Other ME Countries by Area 2019–2025 (thousand square feet)
Exhibit 84 Data Center Construction Market in Other ME Countries by Power Capacity 2019–2025 (MW)
Exhibit 85 Data Center Infrastructure Market in Other ME Countries 2019–2025 ($ million)
Exhibit 86 Incremental Growth in Africa by Investment 2019?2025 ($ million)
Exhibit 87 Incremental Growth in Africa by Area 2019?2025 (thousand square feet)
Exhibit 88 Incremental Growth in Africa by Power Capacity 2019?2025 (MW)
Exhibit 89 Data Center Construction Market in Africa 2019–2025 ($ million)
Exhibit 90 Data Center Construction Market in Africa by Area 2019–2025 (Thousand Square Feet)
Exhibit 91 Data Center Construction Market in Africa by Power Capacity 2019–2025 (MW)
Exhibit 92 Data Center Construction Infrastructure Market in Africa 2019?2025 ($ million)
Exhibit 93 Snapshot – Data Center Construction Market in South Africa 2019?2025
Exhibit 94 Data Center Construction Market in South Africa 2019?2025 ($ million)
Exhibit 95 Data Center Construction Market in South Africa by Area 2019?2025 (Thousand Square Feet)
Exhibit 96 Data Center Construction Market in South Africa by Power Capacity 2019?2025 (MW)
Exhibit 97 Data Center Construction Infrastructure Market in South Africa 2019?2025 ($ million)
Exhibit 98 Snapshot – Data Center Construction Market in Morocco 2019?2025
Exhibit 99 Data Center Construction Market in Morocco 2019?2025 ($ million)
Exhibit 100 Data Center Construction Market in Morocco by Area 2019?2025 (Thousand Square Feet)
Exhibit 101 Data Center Construction Market in Morocco by Power Capacity 2019?2025 (MW)
Exhibit 102 Data Center Construction Infrastructure Market in Morocco 2019?2025 ($ million)
Exhibit 103 Snapshot – Data Center Construction Market in Egypt 2019?2025
Exhibit 104 Data Center Construction Market in Egypt 2019–2025 ($ million)
Exhibit 105 Data Center Construction Market in Egypt by Area 2019–2025 (thousand of square feet)
Exhibit 106 Data Center Construction Market in Egypt by Power Capacity 2019–2025 (MW)
Exhibit 107 Data Center Construction Infrastructure Market in Egypt 2019?2025 ($ million)
Exhibit 108 Snapshot – Data Center Construction Market in Kenya 2019?2025
Exhibit 109 Data Center Construction Market in Kenya 2019?2025 ($ million)
Exhibit 110 Data Center Construction Market in Kenya by Area 2019?2025 (Thousand Square Feet)
Exhibit 111 Data Center Construction Market in Kenya by Power Capacity 2019?2025 (MW)
Exhibit 112 Data Center Construction Infrastructure Market in Kenya 2019–2025 ($ million)
Exhibit 113 Snapshot – Data Center Construction Market in Nigeria 2019?2025
Exhibit 114 Data Center Construction Market in Nigeria 2019?2025 ($ million)
Exhibit 115 Data Center Construction Market in Nigeria by Area 2019?2025 (Thousand Square Feet)
Exhibit 116 Data Center Construction Market in Nigeria by Power Capacity 2019?2025 (MW)
Exhibit 117 Data Center Construction Infrastructure Market in Nigeria 2019?2025 ($ million)
Exhibit 118 Snapshot – Data Center Construction Market in Other African Countries 2019?2025
Exhibit 119 Data Center Construction Market in Other African Countries 2019?2025 ($ million)
Exhibit 120 Data Center Construction Market in Other African Countries by Area 2019?2025 (Thousand Square Feet)
Exhibit 121 Data Center Construction Market in Other African Countries by Power Capacity 2019?2025 (MW)
Exhibit 122 Data Center Construction Infrastructure Market in Other African Countries2019?2025 ($ million)
LIST OF TABLES
Table 1 Key Caveats
Table 2 Currency Conversion 2013?2019
Table 3 Data Center Site Selection Criteria
Table 4 Impact of COVID-19 Pandemic on Data Center Construction Market in MEA
Table 5 Impact of COVID-19 on Data Center Cooling Market in MEA ($ million) 2020
Table 6 ABB: Product Offerings
Table 7 Caterpillar: Product Offerings
Table 8 Cummins: Product Offerings
Table 9 Eaton: Product Offerings
Table 10 Schneider Electric: Product Offerings
Table 11 Stulz: Product Offerings
Table 12 Rittal: Product Offerings
Table 13 Vertiv: Product Offerings
Table 14 Data Center Construction Market in MEA 2019?2025
Table 15 Data Center Construction Infrastructure Market in MEA 2019?2025 ($ million)
Table 16 Data Center Electrical Infrastructure Construction Market in MEA 2019?2025 ($ million)
Table 17 Data Center Mechanical Infrastructure Construction Market in MEA 2019?2025 ($ million)
Table 18 Data Center Cooling Systems Construction Market in MEA 2019?2025 ($ million)
Table 19 Data Center Construction Market in MEA by Cooling Techniques 2019?2025 ($ million)
Table 20 Data Center General Construction Market in MEA 2019?2025 ($ million)
Table 21 Data Center Construction Market in MEA by Tier Standards 2019?2025 ($ million)
Table 22 Data Center Construction Market in Middle East 2019?2025
Table 23 Data Center Construction Market in Middle East by Investment 2019?2025 ($ million)
Table 24 Data Center Construction Market in Middle East by Area 2019?2025 (Thousand Square Feet)
Table 25 Data Center Construction Market in Middle East by Power Capacity 2019?2025 (MW)
Table 26 Data Center Construction Infrastructure Market in Middle East 2019?2025 ($ million)
Table 27 Data Center Construction Market in Saudi Arabia 2019?2025
Table 28 Data Center Construction Infrastructure Market in Saudi Arabia 2019?2025 ($ million)
Table 29 Data Center Construction Market in UAE 2019?2025
Table 30 Data Center Construction Infrastructure Market in UAE 2019?2025 ($ million)
Table 31 Data Center Construction Market in Turkey 2019?2025
Table 32 Data Center Construction Infrastructure Market in Turkey 2019?2025 ($ million)
Table 33 Data Center Construction Market in Jordan 2019?2025
Table 34 Data Center Construction Infrastructure Market in Jordan 2019?2025 ($ million)
Table 35 Data Center Construction Market in Other ME Countries 2019?2025
Table 36 Data Center Construction Infrastructure Market in Other ME Countries 2019?2025 ($ million)
Table 37 Data Center Construction Market in Africa 2019?2025
Table 38 Data Center Construction Market in Africa by Investment 2019?2025 ($ million)
Table 39 Data Center Construction Market in Africa by Area 2019?2025 (Thousand Square Feet)
Table 40 Data Center Construction Market in Africa by Power Capacity 2019?2025 (MW)
Table 41 Data Center Construction Infrastructure Market in Africa 2019?2025 ($ million)
Table 42 Data Center Construction Market in South Africa 2019?2025
Table 43 Data Center Construction Infrastructure Market in South Africa 2019?2025($ million)
Table 44 Data Center Construction Market in Morocco 2019?2025
Table 45 Data Center Construction Infrastructure Market in Morocco 2019?2025($ million)
Table 46 Data Center Construction Market in Egypt 2019?2025
Table 47 Data Center Construction Infrastructure Market in Egypt 2019?2025 ($ million)
Table 48 Data Center Construction Market in Kenya 2019?2025
Table 49 Data Center Construction Infrastructure Market in Kenya 2019?2025 ($ million)
Table 50 Data Center Construction Market in Nigeria 2019?2025
Table 51 Data Center Construction Infrastructure Market in Nigeria 2019?2025 ($ million)
Table 52 Data Center Construction Market in Other African Countries 2019?2025
Table 53 Data Center Construction Infrastructure Market in Other African Countries 2019?2025 ($ million)
Table 1 Key Caveats
Table 2 Currency Conversion 2013?2019
Table 3 Data Center Site Selection Criteria
Table 4 Impact of COVID-19 Pandemic on Data Center Construction Market in MEA
Table 5 Impact of COVID-19 on Data Center Cooling Market in MEA ($ million) 2020
Table 6 ABB: Product Offerings
Table 7 Caterpillar: Product Offerings
Table 8 Cummins: Product Offerings
Table 9 Eaton: Product Offerings
Table 10 Schneider Electric: Product Offerings
Table 11 Stulz: Product Offerings
Table 12 Rittal: Product Offerings
Table 13 Vertiv: Product Offerings
Table 14 Data Center Construction Market in MEA 2019?2025
Table 15 Data Center Construction Infrastructure Market in MEA 2019?2025 ($ million)
Table 16 Data Center Electrical Infrastructure Construction Market in MEA 2019?2025 ($ million)
Table 17 Data Center Mechanical Infrastructure Construction Market in MEA 2019?2025 ($ million)
Table 18 Data Center Cooling Systems Construction Market in MEA 2019?2025 ($ million)
Table 19 Data Center Construction Market in MEA by Cooling Techniques 2019?2025 ($ million)
Table 20 Data Center General Construction Market in MEA 2019?2025 ($ million)
Table 21 Data Center Construction Market in MEA by Tier Standards 2019?2025 ($ million)
Table 22 Data Center Construction Market in Middle East 2019?2025
Table 23 Data Center Construction Market in Middle East by Investment 2019?2025 ($ million)
Table 24 Data Center Construction Market in Middle East by Area 2019?2025 (Thousand Square Feet)
Table 25 Data Center Construction Market in Middle East by Power Capacity 2019?2025 (MW)
Table 26 Data Center Construction Infrastructure Market in Middle East 2019?2025 ($ million)
Table 27 Data Center Construction Market in Saudi Arabia 2019?2025
Table 28 Data Center Construction Infrastructure Market in Saudi Arabia 2019?2025 ($ million)
Table 29 Data Center Construction Market in UAE 2019?2025
Table 30 Data Center Construction Infrastructure Market in UAE 2019?2025 ($ million)
Table 31 Data Center Construction Market in Turkey 2019?2025
Table 32 Data Center Construction Infrastructure Market in Turkey 2019?2025 ($ million)
Table 33 Data Center Construction Market in Jordan 2019?2025
Table 34 Data Center Construction Infrastructure Market in Jordan 2019?2025 ($ million)
Table 35 Data Center Construction Market in Other ME Countries 2019?2025
Table 36 Data Center Construction Infrastructure Market in Other ME Countries 2019?2025 ($ million)
Table 37 Data Center Construction Market in Africa 2019?2025
Table 38 Data Center Construction Market in Africa by Investment 2019?2025 ($ million)
Table 39 Data Center Construction Market in Africa by Area 2019?2025 (Thousand Square Feet)
Table 40 Data Center Construction Market in Africa by Power Capacity 2019?2025 (MW)
Table 41 Data Center Construction Infrastructure Market in Africa 2019?2025 ($ million)
Table 42 Data Center Construction Market in South Africa 2019?2025
Table 43 Data Center Construction Infrastructure Market in South Africa 2019?2025($ million)
Table 44 Data Center Construction Market in Morocco 2019?2025
Table 45 Data Center Construction Infrastructure Market in Morocco 2019?2025($ million)
Table 46 Data Center Construction Market in Egypt 2019?2025
Table 47 Data Center Construction Infrastructure Market in Egypt 2019?2025 ($ million)
Table 48 Data Center Construction Market in Kenya 2019?2025
Table 49 Data Center Construction Infrastructure Market in Kenya 2019?2025 ($ million)
Table 50 Data Center Construction Market in Nigeria 2019?2025
Table 51 Data Center Construction Infrastructure Market in Nigeria 2019?2025 ($ million)
Table 52 Data Center Construction Market in Other African Countries 2019?2025
Table 53 Data Center Construction Infrastructure Market in Other African Countries 2019?2025 ($ million)
More Publications
Data Center Construction Market in Latin America - Industry Outlook and Forecast 2019-2024
US$ 3,500.00
September 2019
265 pages
Data Center Construction Market in Southeast Asia - Industry Outlook and Forecast 2019-2024
US$ 4,250.00
March 2019
215 pages