Data Center Construction Market in Europe - Industry Outlook and Forecast 2019-2024

April 2019 | 362 pages | ID: D7608270F31EN
Arizton Advisory & Intelligence

US$ 4,250.00

E-mail Delivery (PDF)

Download PDF Leaflet

Accepted cards
Wire Transfer
Checkout Later
Need Help? Ask a Question
Europe data center construction market is expected to reach around $13 billion by 2024, growing at a CAGR of over 4% during 2018–2024.

The increased procurement of renewable energy sources for data centers operations, the rise in data center automation, and the emergence of Lithium-ion batteries and fuel cells are expected to drive the Europe data center construction market. Ericsson, Deutsche Telekom, Telia Sonera, Telenor, and Tele2 TDC Group along with government agencies are investing a high capital in improving internet connectivity in Western Europe and the Nordic region. The Europe data center construction market is expected to grow due to increased investments from colocation, cloud, internet, and telecommunication service providers. Further, growth in data, general data protection regulation (GDPR), the popularity of social media, high adoption of smart wearable devices, and the rise of connected reality will be significant growth drivers for Europe data center construction market.

This market research report on the Europe data center construction market covers market sizing and forecast, market share, industry trends, growth drivers, and vendor analysis. The market study includes insights on segmentation by electrical infrastructure (UPS Systems, generators, transfer switches and switchgears, rack PDUs, and other electrical infrastructure), mechanical infrastructure (cooling systems, racks, and other infrastructure), tier standards (Tier I&II, Tier III, and Tier IV), general construction (building development, installation and commissioning services,building design, physical security, DCIM (datacenter infrastructure management software), and countries (Western Europe: Netherlands, UK, Germany, and France), (Central and Eastern Europe: Russia and Czech Republic, Poland and Austria, and other countries), and Nordic region (Denmark, Finland, Sweden, Iceland, and Norway).

The report considers the present scenario of the Europe data center construction market and its market dynamics for the period 2019−2024. It covers a detailed overview of several growth enablers, restraints, and trends in the Europe data center construction market. The study includes both the demand and supply aspect of the data center construction market. It profiles and analysis leading infrastructure vendors, data center construction contractors, and data center service providers.

Europe Data Center Construction Market: Dynamics

Europe is one of the leading active data center markets, which is expected to grow at a CAGR of 16% during the forecast period. According to the Global Interconnection Index by Equinix Frankfurt, about 70% of the data traffic is concentrated in Germany, France, Italy, Spain, and the UK. London is expected to be the largest interconnection market. Hyperscaleservice providers are actively investing in the Europe data center construction market. For example, Microsoft is expected to open its cloud region in Germany by the end of 2019 or early 2020. The investment in data center technology, especially edge computing facilities, is expected to grow in several facilities after 2020 in the European region. EdgeConnex is among the leading-edge datacenter operator that is likely to increase its presence in the European market with operations in Amsterdam, Dublin, Munich, and Warsaw. The augmenting numbers of connected devices are expected to triple by the end of the forecast period, and the investment on edge computing facilities will grow post-2020 in the region. EdgeConnex and other colocation service providers have also planned to establish facilities in the Europe data center construction market.

Europe Data Center Construction Market: Segmentation

This market research report includes a detailed segmentation of the market by electrical infrastructure, mechanical infrastructure, tier standards, general construction, and countries.

The Europe data center construction market by electrical infrastructure can be classified into UPS systems, generators, transfer switches and switchgears, rack PDUs, and others (utility transformers, power cables and panels, lighting equipment, installation services, busbars, circuit breakers, and TVSS systems). The UPS systems and generators segments account for significant market shares and are expected to grow at CAGRs of approximately 5% and 4%, respectively, during 2018–2024. In 2019, western Europe is likely to witness the opening of over 20 data center projects with the power capacity of more than 10 MW. The European data center market is adopting pre-fabricated datacenters, which will add more revenue for less than 1 W UPS systems.

The Europe data center construction market by mechanical infrastructure can be classified into cooling systems, racks, and others. The cooling systems segment has captured a major portion of the European market and is expected to grow at a CAGR of over 4% during 2018–2024. Computer room air conditioners (CRAC), computer room air handlers (CRAH), chillers, cooling towers, and dry coolers are the commonly adopted cooling infrastructure in the Europe data center construction market. The use of indirect evaporative cooler and air/water-side economizers will continue to grow in Nordic countries and Northern Western Europe, facilitating free cooling for a minimum of 8,000 hours per year.

The Europe data center construction market by tier standards can be divided into Tier I&II, Tier III, and Tier IV. Tier IV data center facilities are the fastest growing segment in the Europe data center construction market and are expected to grow at a CAGR of approximately 6% during 2018–2024. The Uptime Institute has developed a Tier Classification System (tier I−4), which evaluates datacenter facilities based on their infrastructure performance, efficiency, redundancy, and high availability. In 2017, Switch, a leading data center developer and operator, designed a tier V data center, which covers the entire data center design and development, including the use of renewable energy sources as a classification parameter.

Building development and designing, installation and commissioning services, physical security, and DCIM (data center infrastructure management software) are major constituents of the general construction segment. Building development and installation and commissioning services are the fastest growing segments and are expected to grow at a CAGR of around 3% and 5%, respectively. While increased hyperscale investments by companies such as AWS, Google, Facebook, Apple, and Microsoft will increase a high demand for skilled workforce in several European countries, including Denmark, Ireland, Germany, etc., the data center market in Western Europe will witness an increase in facility designs that support OCP infrastructure operations.

Market Segmentation by Electrical Infrastructure
  • UPS Systems
  • Generators
  • Transfer Switches and Switchgears
  • Rack PDUs
  • Others
Market Segmentation by Mechanical Infrastructure
  • Cooling Systems
  • Racks
  • Others
Market Segmentation by Tier Standards
  • Tier I & II
  • Tier III
  • Tier IV
Market Segmentation by General Construction
  • Building Development
  • Installation and Commissioning Services
  • Building Design
  • Physical Security Systems
  • DCIM (Data Center Infrastructure Management Software)
Europe Data Center Construction Market: Geography

Western Europe (Netherlands, UK, Germany, France), Central and Eastern Europe (Russia and the Czech Republic, Poland and Austria, and other countries, and the Nordic region (Denmark, Finland, Sweden, Iceland, and Norway) are the major contributors to the Europe data center construction market. The UK and the Netherlands are expanding significantly, and the market in the UK is expected to grow at a CAGR of 2% during 2018–2024. Several global cloud service players such as AWS, Microsoft, and Google and many colocation service providers such as Equinix, Digital Realty, CyrusOne, and Colt DCS are expanding their presence in the UK, which is likely to increase the market growth. The implementation of cloud-based and big data services will be a strong growth enabler for the UK data center market, thereby fueling additional investments during the forecast period.

Market Segmentation by Geography
  • Western Europe
    • Netherlands
    • UK
    • Germany
    • France
  • Central and Eastern Europe
    • Russia and the Czech Republic
    • Poland and Austria
    • other countries
  • Nordic
    • Denmark
    • Finland
    • Sweden
    • Iceland
    • Norway
Key Vendor Analysis

Multiple initiatives by hyperscale service providers to reduce the cost of efficient infrastructure services are expected to aid the growth of the Europe data center construction market. Infrastructure resellers and distributors are expected to compete with each other in the region. The demand for cloud data service and high-density operations is expected to grow during the forecast period. Partnerships with local and modular data center service providers will increase revenues for global vendors operating in the market. The need for installation, commissioning, and maintenance services will generate local job opportunities in the market.

Prominent Construction Contractors
  • AECOM
  • Arup Group
  • Bruce Shaw
  • Cap Ingelec
  • DPR Construction
  • Etix Everywhere
  • Flex Enclosure
  • Future-tech
  • Jones Engineering
  • KMCS
  • LUPP Group
  • Mace group
  • Mercury engineering
  • NCC
  • Red Engineering
  • Skanska
  • SISK Group
  • Structure Tone
Prominent Infrastructure Providers
  • ABB
  • Bosch Security
  • Caterpillar
  • Cummins
  • Eaton
  • EURO-DIESEL
  • Hitec Power Protection
  • KOHLER
  • Legrand Group
  • MTU OnSite Energy
  • Nlyte Software
  • Piller Power Systems
      • Riello UPS
  • Rittal
  • Schneider Electric
  • Socomec Group
  • STULZ
  • Vertiv
Prominent Data Center Investors
  • Adgar
  • Advania Data Center
  • Apple
  • Aruba
  • AWS
  • Colt Data Centre Services (Colt DCS)
  • CyrusOne
  • Digital Realty
  • Equinix
  • Facebook
  • Google
  • Global Switch
  • Iliad Data Center
  • Interxion
  • IXcellerate
  • Microsoft
  • NTT Communications
  • OVH
  • STT GDC
  • T-Systems
  • T5 Data Centers
Key Market Insights

1. An analysis of the Europe data center construction market in terms of market sizing and growth opportunities for the forecast period 2019−2024
2. Comprehensive insights on current industry trends, market forecast, and growth drivers in the Europe data center construction market
3. Discussion on growth drivers, challenges, and investment opportunities
4. A complete overview of market segments and the regional outlook of the Europe data center construction market
5. A detailed outline of the vendor landscape, competitive analysis, and key market strategies for gaining a competitive advantage in the Europe data center construction market
1 RESEARCH METHODOLOGY

2 RESEARCH OBJECTIVES

3 RESEARCH PROCESS

4 SCOPE & COVERAGE

4.1 Market Definition
4.2 Base Year
4.3 Scope of the study
4.4 Market Segments
  4.4.1 Market Segmentation by Infrastructure
  4.4.2 Market Segmentation by Electrical Infrastructure
  4.4.3 Market Segmentation by Mechanical Infrastructure
  4.4.4 Market Segmentation by Cooling Systems
  4.4.5 Market Segmentation by General Construction
  4.4.6 Market Segmentation by Tier Standards
  4.4.7 Market Segmentation by Geography

5 REPORT ASSUMPTIONS & CAVEATS

5.1 Key Caveats
5.2 Currency Conversion
5.3 Market Derivation

6 MARKET AT A GLANCE

7 INTRODUCTION

7.1 Internet Penetration and Data Center Traffic in Europe
7.2 Electricity Pricing in Europe
7.3 Data Center Site Selection Criteria

8 MARKET DYNAMICS

8.1 Market Growth Enablers
  8.1.1 GDPR Driving Cloud Demand in Europe
  8.1.2 Big Data and IoT to Increase Data Center Investments
  8.1.3 Government Support to Grow Data Center Investments
  8.1.4 Higher Demand for Colocation Services
  8.1.5 Growing Submarine Cable Investments in Europe
8.2 Market Growth Restraints
  8.2.1 Increase in Power Outages and Fluctuations
  8.2.2 Lack of Skilled Workforce
  8.2.3 Increased Carbon Emissions from Data Centers
8.3 Market Opportunities & Trends
  8.3.1 Higher Procurement of Renewable Energy for Data Centers
  8.3.2 Growth in Mergers & Acquisitions
  8.3.3 Increased Automation of Data Centers
  8.3.4 Emergence of Lithium-ion Batteries and Fuel Cells in Data Centers
  8.3.5 District Heating in European Data Centers

9 DATA CENTER CONSTRUCTION MARKET IN EUROPE

9.1 Market Overview
9.2 Market Size & Forecast
9.3 Five Forces Analysis
  9.3.1 Threat of New Entrants
  9.3.2 Bargaining Power of Suppliers
  9.3.3 Bargaining Power of Buyers
  9.3.4 Threat of Substitutes
  9.3.5 Competitive Rivalry

10 BY INFRASTRUCTURE

10.1 Market Segment Snapshot & Growth Engine
10.2 Market Overview
10.3 Electrical Infrastructure
  10.3.1 Market Overview
  10.3.2 Market Size & Forecast
10.4 General Construction
  10.4.1 Market Overview
  10.4.2 Market Size & Forecast
10.5 Mechanical Infrastructure
  10.5.1 Market Overview
  10.5.2 Market Size & Forecast

11 BY ELECTRICAL INFRASTRUCTURE

11.1 Market segment snapshot & Growth Engine
11.2 UPS Systems
  11.2.1 Market Overview
  11.2.2 Market Size & Forecast
11.3 Generators
  11.3.1 Market Overview
  11.3.2 Market Size & Forecast
11.4 Transfer Switches & Switchgears
  11.4.1 Market Overview
  11.4.2 Market Size & Forecast
11.5 Rack Power Distribution Units
  11.5.1 Market Overview
  11.5.2 Market Size & Forecast
11.6 Other Electrical Infrastructure
  11.6.1 Market Overview
  11.6.2 Market Size & Forecast

12 BY MECHANICAL INFRASTRUCTURE

12.1 Market Segment Snapshot & Growth Engine
12.2 Cooling Systems
  12.2.1 Market Overview
  12.2.2 Market Size & Forecast
12.3 Racks
  12.3.1 Market Overview
  12.3.2 Market Size & Forecast
12.4 Other Mechanical Infrastructure
  12.4.1 Market Overview
  12.4.2 Market Size & Forecast

13 BY COOLING SYSTEMS

13.1 Market segment snapshot & Growth Engine
13.2 Economizers & Evaporative Coolers
  13.2.1 Market Overview
  13.2.2 Market Size & Forecast
13.3 CRAC & CRAH UNITS
  13.3.1 Market Overview
  13.3.2 Market Size & Forecast
13.4 Chiller Units
  13.4.1 Market Overview
  13.4.2 Market Size & Forecast
13.5 Cooling Towers & Dry Coolers
  13.5.1 Market Overview
  13.5.2 Market Size & Forecast
13.6 Other Cooling Units
  13.6.1 Market Overview
  13.6.2 Market Size & Forecast

14 BY GENERAL CONSTRUCTION

14.1 Market segment Snapshot & Growth Engine
14.2 Building Development
  14.2.1 Market Overview
  14.2.2 Market Size & Forecast
14.3 Installation & Commissioning Services
  14.3.1 Market Overview
  14.3.2 Market Size & Forecast
14.4 Building Design
  14.4.1 Market Overview
  14.4.2 Market Size & Forecast
14.5 Physical Security
  14.5.1 Market Overview
  14.5.2 Market Size & Forecast
14.6 DCIM
  14.6.1 Market Overview
  14.6.2 Market Size & Forecast

15 MARKET BY TIER STANDARDS

15.1 Market segment Snapshot & Growth Engine
15.2 Overview Of Tier Standards
15.3 TIER I & II
  15.3.1 Market Overview
  15.3.2 Market Size & Forecast
15.4 TIER III
  15.4.1 Market Overview
  15.4.2 Market Size & Forecast
15.5 TIER IV
  15.5.1 Market Overview
  15.5.2 Market Size & Forecast

16 BY GEOGRAPHY

16.1 Geography Snapshot & Growth Engine by investment
16.2 Geography Snapshot & Growth Engine by Area
16.3 Geography Snapshot & Growth Engine by Power Capacity
16.4 Market Overview

17 WESTERN EUROPE

17.1 Western Europe Market Snapshot & Growth Engine by investment
17.2 Western Europe Market snapshot & Growth Engine by Area
17.3 Western Europe Market snapshot & Growth Engine by POWER
17.4 UK
  17.4.1 Market Overview
  17.4.2 Market Size & Forecast by Investment
  17.4.3 Market Size & Forecast by Area
  17.4.4 Market Size & Forecast by Power Capacity
  17.4.5 Market Size & Forecast by Infrastructure
17.5 Netherlands
  17.5.1 Market Overview
  17.5.2 Market Size & Forecast by Investment
  17.5.3 Market Size & Forecast by Area
  17.5.4 Market Size & Forecast by Power Capacity
  17.5.5 Market Size & Forecast by Infrastructure
17.6 Germany
  17.6.1 Market Overview
  17.6.2 Market Size & Forecast by Investment
  17.6.3 Market Size & Forecast by Area
  17.6.4 Market Size & Forecast by Power Capacity
  17.6.5 Market Size & Forecast by Infrastructure
17.7 France
  17.7.1 Market Overview
  17.7.2 Market Size & Forecast by Investment
  17.7.3 Market Size & Forecast by Area
  17.7.4 Market Size & Forecast by Power Capacity
  17.7.5 Market Size & Forecast by Infrastructure
17.8 Other Western European Countries
  17.8.1 Market Overview
  17.8.2 Market Size & Forecast by Investment
  17.8.3 Market Size & Forecast by Area
  17.8.4 Market Size & Forecast by Power Capacity
  17.8.5 Market Size & Forecast by Infrastructure

18 NORDIC REGION

18.1 Nordic Market Snapshot & Growth Engine by investment
18.2 Nordic Market Snapshot & Growth Engine by Area
18.3 Nordic Market Snapshot & Growth Engine by Power
18.4 Denmark
  18.4.1 Market Overview
  18.4.2 Market Size & Forecast by Investment
  18.4.3 Market Size & Forecast by Area
  18.4.4 Market Size & Forecast by Power Capacity
  18.4.5 Market Size & Forecast by Infrastructure
18.5 Norway
  18.5.1 Market Overview
  18.5.2 Market Size & Forecast by Investment
  18.5.3 Market Size & Forecast by Area
  18.5.4 Market Size & Forecast by Power Capacity
  18.5.5 Market Size & Forecast by Infrastructure
18.6 Sweden
  18.6.1 Market Overview
  18.6.2 Market Size & Forecast by Investment
  18.6.3 Market Size & Forecast by Area
  18.6.4 Market Size & Forecast by Power Capacity
  18.6.5 Market Size & Forecast by Infrastructure
18.7 Finland & Iceland
  18.7.1 Market Overview
  18.7.2 Market Size & Forecast by Investment
  18.7.3 Market Size & Forecast by Area
  18.7.4 Market Size & Forecast by Power Capacity
  18.7.5 Market Size & Forecast by Infrastructure

19 CENTRAL & EASTERN EUROPE

19.1 Central & Eastern Europe Snapshot & Growth Engine by investment
19.2 Central & Eastern Europe Market Snapshot & Growth Engine by Area
19.3 Central & Eastern Europe Market Snapshot & Growth Engine by Power
19.4 Russia & Czech Republic
  19.4.1 Market Overview
  19.4.2 Market Size & Forecast by Investment
  19.4.3 Market Size & Forecast by Area
  19.4.4 Market Size & Forecast by Power Capacity
  19.4.5 Market Size & Forecast by Infrastructure
19.5 Poland & Austria
  19.5.1 Market Overview
  19.5.2 Market Size & Forecast by Investment
  19.5.3 Market Size & Forecast by Area
  19.5.4 Market Size & Forecast by Power Capacity
  19.5.5 Market Size & Forecast by Infrastructure
19.6 Other Eastern European Countries
  19.6.1 Market Overview
  19.6.2 Market Size & Forecast by Investment
  19.6.3 Market Size & Forecast by Area
  19.6.4 Market Size & Forecast by Power Capacity
  19.6.5 Market Size & Forecast by Infrastructure

20 COMPETITIVE LANDSCAPE

20.1 Key Market Participants
  20.1.1 Electrical Infrastructure
  20.1.2 Mechanical Infrastructure
  20.1.3 General Construction

21 PROMINENT DATA CENTER CONSTRUCTION CONTRACTORS

21.1 AECOM
  21.1.1 Overview
  21.1.2 Service Offerings
21.2 Arup Group
  21.2.1 Overview
  21.2.2 Service Offerings
21.3 Bruce Shaw
  21.3.1 Overview
  21.3.2 Service Offerings
21.4 Cap Ingelec
  21.4.1 Overview
  21.4.2 Service Offerings
21.5 DPR Construction
  21.5.1 Overview
  21.5.2 Service Offerings
21.6 Etix Everywhere
  21.6.1 Overview
  21.6.2 Products and Service Offerings
21.7 Flex Enclosure
  21.7.1 Overview
  21.7.2 Products and Service Offerings
21.8 Future-Tech
  21.8.1 Overview
  21.8.2 Service Offerings
21.9 Jones Engineering Group
  21.9.1 Overview
  21.9.2 Service Offerings
21.10 KMCS
  21.10.1 Overview
  21.10.2 Service Offerings
21.11 LUPP GROUP
  21.11.1 Overview
  21.11.2 Service Offerings
21.12 Mace Group
  21.12.1 Overview
  21.12.2 Service Offerings
21.13 Mercury Engineering
  21.13.1 Overview
  21.13.2 Service Offerings
21.14 NCC
  21.14.1 Overview
  21.14.2 Service Offerings
21.15 Red Engineering
  21.15.1 Overview
  21.15.2 Service Offerings
21.16 Skanska
  21.16.1 Overview
  21.16.2 Service Offerings
21.17 SISK GROUP
  21.17.1 Overview
  21.17.2 Service Offerings
21.18 Structure Tone
  21.18.1 Overview
  21.18.2 Service Offerings

22 PROMINENT DATA CENTER INFRASTRUCTURE PROVIDERS

22.1 ABB
  22.1.1 Overview
  22.1.2 Product Offerings
22.2 Bosch Security Systems
  22.2.1 Overview
  22.2.2 Product Offerings
22.3 Caterpillar
  22.3.1 Overview
  22.3.2 Product Offerings
22.4 Cummins
  22.4.1 Overview
  22.4.2 Product Offerings
22.5 Eaton
  22.5.1 Overview
  22.5.2 Product Offerings
22.6 Euro-Diesel
  22.6.1 Overview
  22.6.2 Product Offerings
22.7 Hitec Power Protection
  22.7.1 Overview
  22.7.2 Product Offerings
22.8 Kohler (Sdmo)
  22.8.1 Overview
  22.8.2 Product Offerings
22.9 Legrand Group
  22.9.1 Overview
  22.9.2 Product Offerings
22.10 MTU OnSite Energy (Rolls-Royce Power Systems AG)
  22.10.1 Overview
  22.10.2 Product Offerings
22.11 Nlyte Software
  22.11.1 Overview
  22.11.2 Product Offerings
22.12 Piller Power Systems
  22.12.1 Overview
  22.12.2 Product Offerings
22.13 Riello UPS
  22.13.1 Overview
  22.13.2 Product Offerings
22.14 Rittal
  22.14.1 Overview
  22.14.2 Product Offerings
22.15 Schneider Electric
  22.15.1 Overview
  22.15.2 Product Offerings
22.16 SOCOMEC
  22.16.1 Overview
  22.16.2 Product Offerings
22.17 STULZ
  22.17.1 Overview
  22.17.2 Product Offerings
22.18 Vertiv
  22.18.1 Overview
  22.18.2 Product Offerings

23 PROMINENT DATA CENTER INVESTORS

23.1 Adgar
  23.1.1 Overview
  23.1.2 Service Offerings
23.2 Advania Data Centers-THOR DC
  23.2.1 Overview
  23.2.2 Service Offerings
23.3 Apple
  23.3.1 Overview
  23.3.2 Service Offerings
23.4 Aruba S.P.A
  23.4.1 Overview
  23.4.2 Service Offerings
23.5 Amazon Web Service (Aws)
  23.5.1 Overview
  23.5.2 Service Offerings
23.6 Colt Data Centre Services (COLT DCS)
  23.6.1 Overview
  23.6.2 Services Offerings
23.7 Cyrusone (Zenium)
  23.7.1 Overview
  23.7.2 Service Offerings
23.8 Digital Realty
  23.8.1 Overview
  23.8.2 Service Offerings
23.9 Equinix
  23.9.1 Overview
  23.9.2 Service Offerings
23.10 Facebook
  23.10.1 Overview
  23.10.2 Service Offerings
23.11 Google
  23.11.1 Overview
  23.11.2 Product & Service Offerings
23.12 Global Switch
  23.12.1 Overview
  23.12.2 Service Offerings
23.13 Illiad Data Center
  23.13.1 Overview
  23.13.2 Service Offerings
23.14 Interxion
  23.14.1 Overview
  23.14.2 Service Offerings
23.15 Ixcellerate
  23.15.1 Overview
  23.15.2 Service Offerings
23.16 Microsoft
  23.16.1 Overview
  23.16.2 Service Offerings
23.17 NTT Communications (e-shelter)
  23.17.1 Overview
  23.17.2 Service Offerings
23.18 OVH
  23.18.1 Overview
  23.18.2 Product & Service Offerings
23.19 ST Telemedia GDC (VIRTUS Data Centers)
  23.19.1 Overview
  23.19.2 Service Offerings
23.20 T-Systems (Deutsche Telekom)
  23.20.1 Overview
  23.20.2 Service Offerings
23.21 T5 Data Centers
  23.21.1 Overview
  23.21.2 Service Offerings

24 REPORT SUMMARY

24.1 Key Takeaways
24.2 Quantitative Summary
  24.2.1 Data Center Construction Market in Europe
  24.2.2 Market by Infrastructure
  24.2.3 Electrical Infrastructure
  24.2.4 Mechanical Infrastructure
  24.2.5 General Construction
  24.2.6 Market by Tier Standard
  24.2.7 Market by Region
  24.2.8 Western Europe
  24.2.9 UK
  24.2.10 Netherlands
  24.2.11 Germany
  24.2.12 France
  24.2.13 Other Western European Countries
  24.2.14 Nordics
  24.2.15 Denmark
  24.2.16 Norway
  24.2.17 Sweden
  24.2.18 Finland & Iceland
  24.2.19 Central & Eastern Europe
  24.2.20 Russia
  24.2.21 Poland & Austria
  24.2.22 Other Central & Eastern European Countries

25 APPENDIX

25.1 Abbreviations

LIST OF EXHIBITS

Exhibit 1 Segmentation of Data Center Construction Market in Europe
Exhibit 2 Market Size Calculation Approach 2018
Exhibit 3 Internet Penetration in European Countries 2018
Exhibit 4 IP Traffic & Mobile Data Traffic & Fixed Broadband Speed in Europe
Exhibit 5 The Average Electricity Pricing Across European Countries 2018
Exhibit 6 GDPR Driving Cloud Demand in Europe
Exhibit 7 Big Data and IoT to Increase Data Center Investments
Exhibit 8 Government Support to Grow Data Center Investments
Exhibit 9 Higher Demand for Colocation Services
Exhibit 10 Growing Submarine Cable Investments in Europe
Exhibit 11 Increase in Power Outages and Fluctuations
Exhibit 12 Lack of Skilled Workforce
Exhibit 13 Increased Carbon Emissions from Data Centers
Exhibit 14 Higher Procurement of Renewable Energy for Data Centers
Exhibit 15 Growth in Mergers & Acquisitions
Exhibit 16 Increased Automation of Data Centers
Exhibit 17 Emergence of Lithium-ion Batteries and Fuel Cells in Data Centers
Exhibit 18 District Heating in European Data Centers
Exhibit 19 Data Center Construction Market in Europe 2018−2024 ($ billion)
Exhibit 20 Data Center Construction Market in Europe by Area 2018−2024 (Million Square Feet)
Exhibit 21 Data Center Construction Market in Europe by Power Capacity 2018−2024 (MW)
Exhibit 22 Five Forces Analysis 2018
Exhibit 23 Incremental Growth by Infrastructure 2018−2024
Exhibit 24 Data Center Electrical Infrastructure Market in Europe 2018–2024 ($ billion)
Exhibit 25 Data Center Mechanical Infrastructure Market in Europe 2018–2024 ($ billion)
Exhibit 26 Data Center Mechanical Infrastructure Market in Europe 2018–2024 ($ billion)
Exhibit 27 Incremental Growth by Electrical Infrastructure 2018–2024
Exhibit 28 Data Center UPS Systems Market in Europe 2018−2024 ($ billion)
Exhibit 29 Data Center Generators Market in Europe 2018−2024 ($ billion)
Exhibit 30 Data Center Transfer Switches & Switchgears Market in Europe 2018−2024 ($ billion)
Exhibit 31 Data Center Rack PDU Market in Europe 2018−2024 ($ billion)
Exhibit 32 Data Center Other Electrical Infrastructure Market in Europe 2018−2024 ($ billion)
Exhibit 33 Incremental Growth by Mechanical Infrastructure 2018–2024
Exhibit 34 Data Center Cooling Systems Market in Europe 2018–2024 ($ billion)
Exhibit 35 Data Center Rack Market in Europe 2018–2024 ($ billion)
Exhibit 36 Data Center Other Mechanical Infrastructure Market in Europe 2018–2024 ($ billion)
Exhibit 37 Incremental Growth by Cooling Systems 2018–2024
Exhibit 38 Data Center Economizers & Evaporative Cooler Market in Europe 2018–2024 ($ billion)
Exhibit 39 Data Center CRAC & CRAH Market in Europe 2018–2024 ($ billion)
Exhibit 40 Data Center Chiller Units Market in Europe 2018–2024 ($ billion)
Exhibit 41 Data Center Cooling Towers & Dry Coolers Market in Europe 2018–2024 ($ billion)
Exhibit 42 Data Center Other Cooling Units Market in Europe 2018–2024 ($ billion)
Exhibit 43 Incremental Growth by General Construction 2018–2024
Exhibit 44 Data Center Building Development Market in Europe 2018–2024 ($ billion)
Exhibit 45 Data Center Installation & Commissioning Services Market in Europe 2018–2024 ($ billion)
Exhibit 46 Data Center Building Design Market in Europe 2018–2024 ($ billion)
Exhibit 47 Data Center Physical Security Market in Europe 2018–2024 ($ billion)
Exhibit 48 Data Center DCIM Market in Europe 2018–2024 ($ billion)
Exhibit 49 Incremental Growth by Tier Standards 2018–2024
Exhibit 50 Tier Standard Overview
Exhibit 51 Data Center Tier I & II Construction Market in Europe 2018–2024 ($ billion)
Exhibit 52 Data Center Tier III Construction Market in Europe 2018–2024 ($ billion)
Exhibit 53 Data Center Tier IV Construction Market in Europe 2018−2024 ($ billion)
Exhibit 54 Incremental Growth by Geography 2018-2024
Exhibit 55 Incremental Growth in Nordics by Area 2018–2024 (Million Square Feet)
Exhibit 56 Incremental Growth in Nordics by Power Capacity 2018–2024 (MW)
Exhibit 57 Revenue Market Share by Countries 2018 & 2024 (%)
Exhibit 58 Area Market Share by Regions 2018 & 2024 (%)
Exhibit 59 Power Capacity Market Share by Regions 2018 & 2024 (%)
Exhibit 60 Incremental Growth in Western Europe by Investment 2018–2024 ($ billion)
Exhibit 61 Incremental Growth in Western Europe by Area 2018–2024 (Million square feet)
Exhibit 62 Incremental Growth in Western Europe by Power Capacity 2018–2024 (MW)
Exhibit 63 Data Center Construction Market in UK 2018–2024 ($ billion)
Exhibit 64 Data Center Construction Market in UK by Area 2018–2024 (Million Square Feet)
Exhibit 65 Data Center Construction Market in UK by Power Capacity 2018–2024 (MW)
Exhibit 66 Data Center Infrastructure Market in UK 2018–2024 ($ million)
Exhibit 67 Data Center Construction Market in Netherlands 2018–2024 ($ billion)
Exhibit 68 Data Center Construction Market in Netherlands by Area 2018–2024 (Million Square Feet)
Exhibit 69 Data Center Construction Market in Netherlands by Power Capacity 2018–2024 (MW)
Exhibit 70 Data Center Infrastructure Market in Netherlands 2018–2024 ($ million)
Exhibit 71 Data Center Construction Market in Germany 2018–2024 ($ billion)
Exhibit 72 Data Center Construction Market in Germany by Area 2018–2024 (Million Square Feet)
Exhibit 73 Data Center Construction Market in Germany by Power Capacity 2018–2024 (MW)
Exhibit 74 Data Center Infrastructure Market in Germany 2018–2024 ($ million)
Exhibit 75 Data Center Construction Market in France 2018–2024 ($ billion)
Exhibit 76 Data Center Construction Market in France by Area 2018–2024 (Million Square Feet)
Exhibit 77 Data Center Construction Market in France by Power Capacity 2018–2024 (MW)
Exhibit 78 Data Center Infrastructure Market in France 2018–2024 ($ million)
Exhibit 79 Data Center Construction Market in Other Western European Countries 2018–2024 ($ billion)
Exhibit 80 Data Center Construction Market in Other Western European Countries by Area 2018–2024 (Million Square Feet)
Exhibit 81 Data Center Construction Market Other Western European Countries by Power Capacity 2018–2024 (MW)
Exhibit 82 Data Center Infrastructure Market Other Western European Countries 2018–2024 ($ million)
Exhibit 83 Incremental Growth in Nordics by Investment 2018–2024 ($ billion)
Exhibit 84 Incremental Growth in Nordics by Area 2018–2024 (Million Square Feet)
Exhibit 85 Incremental Growth in Nordics by Power Capacity 2018–2024 (MW)
Exhibit 86 Data Center Construction Market in Denmark 2018–2024 ($ billion)
Exhibit 87 Data Center Construction Market in Denmark by Area 2018–2024 (Million Square Feet)
Exhibit 88 Data Center Construction Market in Denmark by Power Capacity 2018–2024 (MW)
Exhibit 89 Data Center Infrastructure Market in Denmark 2018–2024 ($ million)
Exhibit 90 Data Center Construction Market in Norway 2018–2024 ($ billion)
Exhibit 91 Data Center Construction Market in Norway by Area 2018–2024 (Million Square Feet)
Exhibit 92 Data Center Construction Market in Norway by Power Capacity 2018–2024 (MW)
Exhibit 93 Data Center Infrastructure Market in Norway 2018–2024 ($ million)
Exhibit 94 Data Center Construction Market in Sweden 2018–2024 ($ billion)
Exhibit 95 Data Center Construction Market in Sweden by Area 2018–2024 (Million Square Feet)
Exhibit 96 Data Center Construction Market in Sweden by Power Capacity 2018–2024 (MW)
Exhibit 97 Data Center Infrastructure Market in Sweden 2018–2024 ($ million)
Exhibit 98 Data Center Construction Market in Finland & Iceland 2018–2024 ($ billion)
Exhibit 99 Data Center Construction Market in Finland & Iceland by Area 2018–2024 (Million Square Feet)
Exhibit 100 Data Center Construction Market in Finland & Iceland by Power Capacity 2018–2024 (MW)
Exhibit 101 Data Center Infrastructure Market in Finland & Iceland 2018–2024 ($ million)
Exhibit 102 Incremental Growth in Central & Eastern Europe by Investment 2018–2024 ($ billion)
Exhibit 103 Incremental Growth in Central & Eastern Europe by Area 2018–2024 (Million Square Feet)
Exhibit 104 Incremental Growth in Central & Eastern Europe by Power Capacity 2018–2024 (MW)
Exhibit 105 Data Center Construction Market in Russia & Czech by Investment 2018–2024 ($ billion)
Exhibit 106 Data Center Construction Market in Russia & Czech by Area 2018–2024 (Million Square Feet)
Exhibit 107 Data Center Construction Market in Russia & Czech by Power Capacity 2018–2024 (MW)
Exhibit 108 Data Center Infrastructure Market in Russia & Czech 2018–2024 ($ million)
Exhibit 109 Data Center Construction Market in Poland & Austria 2018–2024 ($ billion)
Exhibit 110 Data Center Construction Market in Poland & Austria by Area 2018–2024 (Million Square Feet)
Exhibit 111 Data Center Construction Market in Poland & Austria by Power Capacity 2018–2024 (MW)
Exhibit 112 Data Center Infrastructure Market in Poland & Austria 2018–2024 ($ million)
Exhibit 113 Data Center Construction Market in Other Eastern European Countries 2018–2024 ($ billion)
Exhibit 114 Data Center Construction Market in Other Eastern European Countries by Area 2018–2024 (Million Square Feet)
Exhibit 115 Data Center Construction Market in Other Eastern European Countries by Power Capacity 2018–2024 (MW)
Exhibit 116 Data Center Infrastructure Market in Other Eastern European Countries 2018–2024 ($ million)

LIST OF TABLES

Table 1 Key Caveats
Table 2 Currency Conversion 2013−2018
Table 3 Site Selection Criteria
Table 4 Submarine Cable Projects in Europe 2018-2020
Table 5 Recent M&A Activity in Data Center Europe
Table 6 Data Center Construction Market in Europe Overview by Type
Table 7 Data Center Construction Market in Europe 2018–2024
Table 8 Data Center Infrastructure Market in Europe 2018–2024 ($ billion)
Table 9 Data Center Electrical Infrastructure Market in Europe 2018–2024 ($ billion)
Table 10 Data Center Mechanical Infrastructure Market in Europe 2018–2024 ($ billion)
Table 11 Data Center Cooling Systems Market in Europe 2018–2024 ($ billion)
Table 12 Data Center General Construction Market in Europe 2018–2024 ($ billion)
Table 13 Data Center Construction Market in Europe by Tier Standards 2018–2024 ($ billion)
Table 14 Data Center Construction Market in Europe by Geography 2018–2024 ($ billion)
Table 15 Data Center Construction Market in Europe by Area 2018–2024 (Million Square Feet)
Table 16 Data Center Construction Market in Europe by Power Capacity 2018–2024 (MW)
Table 17 Data Center Construction Market in Western Europe 2018–2024
Table 18 Data Center Construction Market in UK 2018–2024
Table 19 Data Center Construction Market in UK by Infrastructure 2018–2024 ($ million)
Table 20 Data Center Construction Market in Netherlands 2018–2024
Table 21 Data Center Construction Market in Netherlands by Infrastructure 2018–2024 ($ million)
Table 22 Data Center Construction Market in Germany 2018–2024
Table 23 Data Center Infrastructure Market in Germany 2018–2024 ($ million)
Table 24 Data Center Construction Market in France 2018–2024
Table 25 Data Center Infrastructure Market in France 2018–2024 ($ million)
Table 26 Data Center Construction Market in Other Western European Countries 2018–2024
Table 27 Data Center Infrastructure Market in Other Western European Countries 2018–2024 ($ million)
Table 28 Data Center Construction Market in Nordics 2018–2024
Table 29 Data Center Construction Market in Denmark 2018–2024
Table 30 Data Center Infrastructure Market in Denmark 2018–2024 ($ million)
Table 31 Data Center Construction Market in Norway 2018–2024
Table 32 Data Center Infrastructure Market in Norway 2018–2024 ($ million)
Table 33 Data Center Construction Market in Sweden 2018–2024
Table 34 Data Center Infrastructure Market in Sweden 2018–2024 ($ million)
Table 35 Data Center Construction Market in Finland & Iceland 2018–2024
Table 36 Data Center Infrastructure Market in Finland & Iceland 2018–2024 ($ million)
Table 37 Data Center Construction Market in Central & Eastern Europe 2018–2024
Table 38 Data Center Construction Market in Russia & Czech Republic 2018–2024
Table 39 Data Center Infrastructure Market in Russia & Czech Republic 2018–2024 ($ million)
Table 40 Data Center Construction Market in Poland & Austria 2018–2024
Table 41 Data Center Infrastructure Market in Poland & Austria 2018–2024 ($ million)
Table 42 Data Center Construction Market in Other Central & Eastern European Countries 2018–2024
Table 43 Data Center Construction Market in Other Central & Eastern European Countries 2018–2024 ($ million)


More Publications

Global Data Center Construction Market Report 2021 US$ 2,350.00 April 2021 117 pages