Data Center Construction Market - Global Outlook and Forecast 2021-2026

February 2021 | 656 pages | ID: DC9F866B9B1EN
Arizton Advisory & Intelligence

US$ 4,500.00

E-mail Delivery (PDF)

Download PDF Leaflet

Accepted cards
Wire Transfer
Checkout Later
Need Help? Ask a Question
In-depth Analysis and Data-driven Insights on the Impact of COVID-19 Included in this Global Data Center Construction Market Report

The data center construction market is expected to grow at a CAGR of 4.8% during the period 2021–2026.

The global data center construction market continues to witness a slew of mergers and acquisitions, followed by joint ventures. The growing demand for data center services across industries has led service providers to collaborate, participate, and sign several mergers and acquisitions to expand their portfolios, expand their reach, and increase their penetration in the market. M&A activities have been followed up with joint ventures, which have acted as a catalyst for market growth. Although the market witnessed several mergers and acquisitions in 2020, the most remarkable ones are the acquisition of Digital Realty merger with Interxion in March 2020, Hypertec by Vantage Data Center in Nov 2020 in Canada. The APAC region witnessed a few high-profile mergers, however, the data center market in India observed two majors acquisitions in 2020 ¬– Equinix’s acquisition of GPX Global Systems in Aug 2020 and Carlyle Group’s merger with Airtel Nxtra Data Center (25%).

The following factors are likely to contribute to the growth of the data center construction market during the forecast period:
  • 5G to Grow Edge Data Center Investments
  • Growth in Procurement of Renewable Energy
  • Innovative UPS Battery Technology
  • Availability of Power Resources and Tax Incentives
The study considers the present scenario of the data center construction market and its market dynamics for the period 2020?2026. It covers a detailed overview of several market growth enablers, restraints, and trends. The report offers both the demand and supply aspects of the market. It profiles and examines leading companies and other prominent ones operating in the market.

Data Center Construction Market Segmentation

The global data center construction market research report includes a detailed segmentation by facility type, electrical infrastructure, mechanical infrastructure, cooling technique, general construction, tier standards, geography. Currently, the US, Germany, Sweden, Australia, Canada, India, and France are witnessing the highest development and expansion of small data center projects, which fall under the capacity of less than 5 MW. Europe witnessed the development of multiple small projects, accounting for over $2 billion in investments. In 2020, the US accounted for around 80% of data center projects with an estimated investment of around $700 million in the Americas data center market. Germany, France, and Switzerland are the major contributors with more than $700 million in investments. The APAC market witnessed the construction of several small projects, accounting for over $2 billion investments.

In terms of electrical infrastructure, several data center facilities in North America have adopted 2N redundant UPS systems. Hyperscale operators are deploying end-of-rack UPS solutions supporting up to six racks. Generators are still being deployed in N+1 redundant configuration. Most facilities have deployed over 1,000 kVA UPS systems and >2 MW generators. However, the increasing procurement of renewable energy is likely to decrease the need for generator systems. The UK, Germany, the Netherlands, France, and Ireland are witnessing high investments in power infrastructure. Several facilities have adopted flexible designs to facilitate the installation of dual power feed, 2N redundant UPS and PDU systems, and N+1 generator. The Western Europe market share of metered and monitored rack PDU solutions has observed a remarkable increase. Hyperscale service providers in the Nordic region are procuring 48V DC UPS systems. These systems prevent a 5–10% loss in AC to DC conversion. Most facilities in the region are powered by renewable energy with a grid stability of over 95%. This reduces the number of redundant generators in the market.

A majority of facilities in North America are cooled via free cooling solutions. Several facilities built-in 2020 adopted free cooling techniques to reduce the energy cost. Economizers, evaporative and adiabatic coolers, and free cooling chillers are adopted among data centers during summers and winters. Also, direct liquid cooling and liquid immersion cooling solutions are growing among data centers. Adiabatic coolers, evaporative coolers, and free cooling chiller systems are observing adoption in Western Europe. The use of water-based cooling includes water-treatment plants and systems that can aid the consumption of water by up to 20%. Several facilities in the Nordic region install free cooling techniques. Hence, the use of free cooling systems is expected to add significant revenues during the forecast period. Several data centers in Central and Eastern Europe have been equipped with in-direct evaporative/adiabatic coolers and support free cooling of over 6,000 hours per year. A few facilities have also adopted water/glycol-based cooling systems along with highly efficient DX-based CRAC systems. Several data centers in the APAC region have air- and water-based cooling systems. China, Japan, Australia, New Zealand, and South Korea benefit from cooling systems that support free cooling and reduce power consumption.

Greenfield data center construction of Tier III standards is more common in the APAC region. The region has a strong presence of local and global contractors. The average labor cost in many countries, including India, is economical than in the US and Europe. While the Middle East market is dominated by greenfield constructions, the UAE and Qatar are likely to witness high modular data center investments. Most greenfield projects covering an area of over 50,000 square feet, require strong expertise in construction, design, and engineering services. The labor cost is moderate in the Middle East due to the availability of a skilled workforce. Most major data center constructions in the region are managed by Europe-based construction service providers that include architects and engineering firms. However, the non-availability of skilled workforce to manage multiple hyperscale projects is a major challenge for several contractors in the region.

Over the last five years, the increasing awareness of redundant infrastructure has decreased the number of Tier I and Tier II data centers significantly across the globe. UPS and PDU systems of Tier II data centers are equipped with minimum N+N redundancy. Around 200 Tier III data centers were under construction in 2020, with 125 data centers opening in 2020. Most of these new facilities are designed to be Tier III standards with a minimum of N+1 redundancy. However, Tier IV facilities are expected to witness significant investments in the market, with focused investment on highly efficient cooling systems. Tier IV facilities equip 2N+1 cooling units. Data center build-out announcements from Apple, Facebook, and Google are likely to significant boost to the tier IV market.

By Facility Type
  • Small
  • Medium
  • Hyperscale
By Electrical Infrastructure
  • UPS Systems
  • Generators
  • Transfer Switches and Switchgears
  • PDUs
  • Other Electrical Infrastructures
By Mechanical Infrastructure
  • Cooling Systems
    • CRAC & CRAH Units
    • Chiller Units
    • Cooling Towers, Dry Coolers, & Condensers
    • Economizers & Evaporative Coolers
    • Other Cooling Units
  • Racks
  • Others Mechanical Infrastructure
By Cooling Technique
  • Air-based Cooling Technique
  • Liquid-based Cooling Technique
By General Construction
  • Core and Shell Development
  • Installation and Commissioning Services
  • Engineering and Building Designs
  • Physical Security
  • DCIM/BMS
By Tier Standards
  • Tier I &II
  • Tier III
  • Tier IV
INSIGHTS BY GEOGRAPHY

The US data center construction market has attained maturity. The growing popularity of the Internet of Things (IoT) is a major driver for the growth of the US data center construction market. The usage of cloud computing services and applications continues to grow rapidly in the US, thereby leading to the establishment of large hyperscale cloud-based data centers. The adoption of modular, scalable, and lithium-ion powered systems in facilities is likely to increase investments in UPS systems. Diesel generators will continue to grow, which are likely to be replaced by fuel cell generators by 2025. Switchgears are likely to grow because of increased construction of large and mega facilities that require medium and high-voltage switchgears. Moreover, the adoption of metered, monitored, switched, and metered-by-outlet PDUs is expected to grow in the market.

By Geography
  • North America
    • US
    • Canada
  • Latin America
    • Brazil
    • Other Latin American Countries
  • Western Europe
    • UK
    • Germany
    • France
    • Netherlands
    • Ireland
    • Other Western European Countries
  • Nordic
    • Denmark
    • Iceland & Finland
    • Norway
    • Sweden
  • Central & Eastern Europe
    • Russia & Czech Republic
    • Poland & Austria
    • Other Central and Eastern European Countries
  • Middle East
    • GCC
    • Other Middle Eastern Countries
  • Africa
    • South Africa
    • Kenya
    • Other African Countries
  • APAC
    • China & Hong Kong
    • Australia & New Zealand
    • India
    • Japan
    • Rest of APAC
    • Southeast Asia
      • Singapore
      • Malaysia
      • Thailand
      • Indonesia
      • Other South Eastern Countries
INSIGHTS BY VENDORS

The growth in mega and hyperscale data centers across the globe has increased revenue opportunities for vendors, which include electrical, mechanical, and general construction. The electrical infrastructure segment has become highly competitive owing to the heightened interest shown by operators in procuring energy-efficient infrastructure solutions. Similarly, mechanical infrastructure providers include both global and regional vendors.

The high consumption of electricity by data center cooling units has led to multiple innovations, which increase the efficiency of data center operations by 90% and reduced cooling OPEX by up to 50%. Owing to the growing construction of hyperscale facilities, revenue opportunities for construction contractors are high as several data centers are spread over thousands of square feet. Several colocation facilities are being built with multiple data halls, where infrastructure adoption, installation, and commissioning of infrastructure is carried out on an on-demand basis.

Key Data Center Support Infrastructure Providers
  • ABB
  • Eaton
  • Rittal
  • Schneider Electric
  • STULZ
  • Vertiv
  • Caterpillar
  • Cummins
Key Data Center Construction Contractors
  • AECOM
  • Bouygues
  • DPR Construction
  • Holder Construction
  • Jacobs Engineering Groups
  • Mercury Engineering
  • M+W Group
Key Data Center Investors
  • Apple
  • Amazon Web Services (AWS)
  • CyrusOne
  • Digital Realty
  • Equinix
  • Facebook
  • GDS Holdings
  • Google
  • Microsoft
  • NTT Communications
Other Prominent Data Center Support Infrastructure Providers
  • Airedale Air Conditioning
  • Asetek
  • Alfa Laval
  • Altima Technologies
  • Assa Abloy
  • Bosch Security Systems (Robert Bosch)
  • Condair Group
  • Delta Group
  • Green Revolution Cooling (GRC)
  • Hitech Power Protection
  • KOHLER (SDMO)
  • Legrand
  • Nlyte Software
  • Rolls Royce Power Systems
  • Mitsubishi Electric Corporation
  • Socomec Group
  • Trane (Ingersoll Rand)
  • ZincFive
Other Prominent Construction Contractors
  • Arup Group
  • Cap Ingelec
  • Corgan
  • CSF Group
  • Faithful+Gould
  • Fluor Corporation
  • Fortis Construction
  • Gensler
  • Gilbane Building Co.
  • HDR Architecture
  • ISG
  • Jones Engineering
  • Kirby Group Engineering
  • KKR Investment Group (Aceco TI S.A.)
  • Larsen & Toubro (L&T)
  • Linesight
  • Mace Group
  • Morrison Hershfield
  • Mortenson Construction
  • Red-Engineering
  • Structure Tone
  • Syska Hennessy Group
  • Winthrop
Other Prominent Data Center Investors
  • 21Vianet (Century Internet Data Center)
  • Africa Data Centres
  • Cologix (Colo-D)
  • Colt Data Centre Services (COLT DCS)
  • Compass Data Centers (Root Data Center)
  • COPT Data Center Solutions
  • CoreSite Realty
  • Canberra Data Centres
  • Etisalat Group
  • Global Switch
  • Keppel DC
  • NEXTDC
  • QTS Realty Trust
  • ST Telemedia Global Data Centres (STT GDC)
  • Shanghai Athub
  • Scala Data Centers
  • Tenglong Holdings Group (Tamron)
  • Turkcell
  • Teraco Data Environments
  • Vantage Data Center
KEY QUESTIONS ANSWERED

1. What is the data center construction market size and growth rate in terms of area?
2. What are the innovative data center technologies adopted by data center operators?
3. Which region is the largest revenue contributor to the data center construction market?
4. Which is the targeted segment of growth in data center construction market share?
5. Who are the key players in the global data center construction market?
6. What are the key factors driving the data center construction market?
1 RESEARCH METHODOLOGY

2 RESEARCH OBJECTIVES

3 RESEARCH PROCESS

4 SCOPE & COVERAGE

4.1 Market Definition
4.2 Base Year
4.3 Scope of The Study
4.4 Market Segments
  4.4.1 Market Segmentation by Facility Type
  4.4.2 Market Segmentation by Infrastructure
  4.4.3 Market Segmentation by Electrical Infrastructure
  4.4.4 Market Segmentation by Mechanical Infrastructure
  4.4.5 Market Segmentation by Cooling Systems
  4.4.6 Market Segmentation by Cooling Techniques
  4.4.7 Market Segmentation by General Construction
  4.4.8 Market Segmentation by Tier Standards
  4.4.9 Market Segmentation by Geography

5 REPORT ASSUMPTIONS & CAVEATS

5.1 Key Caveats
5.2 Currency Conversion
5.3 Market Derivation

6 MARKET AT A GLANCE

7 INTRODUCTION

7.1 Internet & Data Growth
7.2 Data Center Site Selection Criteria
  7.2.1 Key
7.3 Electricity Pricing Across Major Data Center Locations
7.4 Submarine Cables

8 MARKET OPPORTUNITIES & TRENDS

8.1 5G To Grow Edge Data Center Investments
8.2 Growing Procurement Of Renewable Energy
8.3 Innovative Data Center Technologies
8.4 Innovative Ups Battery Technology
8.5 Software-Defined Power & Data Center Infrastructure Automation
8.6 Ai Promotes Liquid Immersion & Direct-To-Chip Cooling Adoption

9 MARKET ENABLERS

9.1 COVID-19 Boosts Data Center Demand
9.2 Cloud Adoption Drives The Data Center Market
9.3 Snowballing Demand For Big Data & IOT Investments
9.4 Colocation Investment Continue To Rise
9.5 M&As And Joint Venture To Fuel Data Center Growth
9.6 Increasing Construction Of Hyperscale Data Centers
9.7 Availability Of Power Resources & Tax Incentives

10 MARKET RESTRAINTS

10.1 Rising Carbon Emission From Data Centers
10.2 Increase In Power & Network Outages
10.3 Location Constraints For Data Center Construction
10.4 Lack Of Skilled Workforce

11 MARKET LANDSCAPE

11.1 Market Overview
11.2 Investment: Market Size & Forecast
11.3 Area: Market Size & Forecast
11.4 Power Capacity: Market Size & Forecast
11.5 Five Forces Analysis
  11.5.1 Threat of New Entrants
  11.5.2 Bargaining Power of Suppliers
  11.5.3 Bargaining Power of Buyers
  11.5.4 Threat of Substitutes
  11.5.5 Competitive Rivalry

12 FACILITY

12.1 Investment: Market Snapshot & Growth Engine
12.2 Power Capacity: Market Snapshot & Growth Engine
12.3 Small Data Centers
  12.3.1 Market Overview
  12.3.2 Investment: Market Size & Forecast
  12.3.3 Power Capacity: Market Size & Forecast
12.4 Medium Data Center
  12.4.1 Market Overview
  12.4.2 Investment: Market Size & Forecast
  12.4.3 Power Capacity: Market Size & Forecast
12.5 Hyperscale Data Center
  12.5.1 Market Overview
  12.5.2 Investment: Market Size & Forecast
  12.5.3 Power Capacity: Market Size & Forecast

13 INFRASTRUCTURE

13.1 Market Snapshot & Growth Engine
13.2 Market Overview
13.3 Electrical Infrastructure
  13.3.1 Market Overview
  13.3.2 Market Size & Forecast
13.4 Mechanical Infrastructure
  13.4.1 Market Overview
  13.4.2 Market Size & Forecast
13.5 General Construction
  13.5.1 Market Overview
  13.5.2 Market Size & Forecast

14 ELECTRICAL INFRASTRUCTURE

14.1 Market Snapshot & Growth Engine
14.2 UPS Systems
  14.2.1 Market Overview
  14.2.2 Market Size & Forecast
14.3 Generators
  14.3.1 Market Overview
  14.3.2 Market Size & Forecast
14.4 Transfer Switches & Switchgear
  14.4.1 Market Overview
  14.4.2 Market Size & Forecast
14.5 Power Distribution Units
  14.5.1 Market Overview
  14.5.2 Market Size & Forecast
14.6 Other Electrical Infrastructure
  14.6.1 Market Overview
  14.6.2 Market Size & Forecast

15 MECHANICAL INFRASTRUCTURE

15.1 Market Snapshot & Growth Engine
15.2 Cooling Systems
  15.2.1 Market Overview
  15.2.2 Market Size & Forecast
15.3 RACKS
  15.3.1 Market Overview
  15.3.2 Market Size & Forecast
15.4 Other Mechanical Infrastructure
  15.4.1 Market Overview
  15.4.2 Market Size & Forecast

16 COOLING SYSTEMS

16.1 Market Snapshot & Growth Engine
16.2 CRAC & CRAH Units
  16.2.1 Market Overview
  16.2.2 Market Size & Forecast
16.3 Chiller Units
  16.3.1 Market Overview
  16.3.2 Market Size & Forecast
16.4 Cooling Towers & Condensers & Dry Coolers
  16.4.1 Market Overview
  16.4.2 Market Size & Forecast
16.5 Economizers & Evaporative Coolers
  16.5.1 Market Overview
  16.5.2 Market Size & Forecast
16.6 Other Cooling Units
  16.6.1 Market Overview
  16.6.2 Market Size & Forecast

17 COOLING TECHNIQUE

17.1 Market Snapshot & Growth Engine
17.2 Air-Based Cooling Techniques
  17.2.1 Market Overview
  17.2.2 Market Size & Forecast
17.3 Liquid-Based Cooling Techniques
  17.3.1 Market Overview
  17.3.2 Market Size & Forecast

18 LIQUID COOLING TECHNIQUE

18.1 Market Snapshot & Growth Engine
18.2 Water-Based Cooling Technique
  18.2.1 Market Size & Forecast
18.3 Direct Liquid & Immersion Cooling Technique
  18.3.1 Market Size & Forecast

19 GENERAL CONSTRUCTION

19.1 Market Snapshot & Growth Engine
19.2 Core & Shell Development
  19.2.1 Market Overview
  19.2.2 Market Size & Forecast
19.3 Installation & Commissioning Services
  19.3.1 Market Overview
  19.3.2 Market Size & Forecast
19.4 Building & Engineering Design
  19.4.1 Market Overview
  19.4.2 Market Size & Forecast
19.5 Physical Security
  19.5.1 Market Overview
  19.5.2 Market Size & Forecast
19.6 DCIM/BMS
  19.6.1 Market Overview
  19.6.2 Market Size & Forecast

20 TIER STANDARDS

20.1 Market Snapshot & Growth Engine
20.2 Overview of Tier Standards
20.3 TIER I & II
  20.3.1 Market Overview
  20.3.2 Market Size & Forecast
20.4 TIER III
  20.4.1 Market Overview
  20.4.2 Market Size & Forecast
20.5 TIER IV
  20.5.1 Market Overview
  20.5.2 Market Size & Forecast

21 GEOGRAPHY

21.1 Market Snapshot & Growth Engine

22 NORTH AMERICA

22.1 Investment: Snapshot & Growth Engine
22.2 AREA: Snapshot & Growth Engine
22.3 Power Capacity: Snapshot & Growth Engine
22.4 Market Overview
22.5 Investment
  22.5.1 Market Size & Forecast
22.6 Area
  22.6.1 Markey Size & Forecast
22.7 Power Capacity
  22.7.1 Market Size & Forecast
22.8 Infrastructure
  22.8.1 Market Size & Forecast
22.9 US
  22.9.1 Market Overview
  22.9.2 Investment: Market Size & Forecast
  22.9.3 Area: Market Size & Forecast
  22.9.4 Power Capacity: Market Size & Forecast
  22.9.5 Infrastructure: Market Size & Forecast
22.10 Canada
  22.10.1 Market Overview
  22.10.2 Investment: Market Size & Forecast
  22.10.3 Area: Market Size & Forecast
  22.10.4 Power Capacity: Market Size & Forecast
  22.10.5 Infrastructure: Market Size & Forecast

23 LATIN AMERICA

23.1 Investment: Snapshot & Growth Engine
23.2 Area: Snapshot & Growth Engine
23.3 Power Capacity: Snapshot & Growth Engine
23.4 Market Overview
23.5 Investments
  23.5.1 Market Size & Forecast
23.6 Area
  23.6.1 Market Size & Forecast
23.7 Power Capacity
  23.7.1 Market Size & Forecast
23.8 Infrastructure
  23.8.1 Market Size & Forecast
23.9 Brazil
  23.9.1 Market Overview
  23.9.2 Investment: Market Size & Forecast
  23.9.3 Area: Market Size & Forecast
  23.9.4 Power Capacity: Market Size & Forecast
  23.9.5 Infrastructure: Market Size & Forecast
23.10 Other Latin America Countries
  23.10.1 Market Overview
  23.10.2 Investment: Market Size & Forecast
  23.10.3 Area: Market Size & Forecast
  23.10.4 Power Capacity: Market Size & Forecast
  23.10.5 Infrastructure: Market Size & Forecast

24 WESTERN EUROPE

24.1 Investment: Snapshot & Growth Engine
24.2 Area: Snapshot & Growth Engine
24.3 Power Capacity: Snapshot & Growth Engine
24.4 Market Overview
24.5 Investment
  24.5.1 Market Size & Forecast
24.6 Area
  24.6.1 Market Size & Forecast
24.7 Power Capacity
  24.7.1 Market Size & Forecast
24.8 Infrastructure
  24.8.1 Market Size & Forecast
24.9 UK
  24.9.1 Market Overview
  24.9.2 Investment: Market Size & Forecast
  24.9.3 Area: Market Size & Forecast
  24.9.4 Power Capacity: Market Size & Forecast
  24.9.5 Infrastructure: Market Size & Forecast
24.10 Germany
  24.10.1 Market Overview
  24.10.2 Investment: Market Size & Forecast
  24.10.3 Area: Market Size & Forecast
  24.10.4 Power Capacity: Market Size & Forecast
  24.10.5 Infrastructure: Market Size & Forecast
24.11 Netherlands
  24.11.1 Market Overview
  24.11.2 Investment: Market Size & Forecast
  24.11.3 Area: Market Size & Forecast
  24.11.4 Power Capacity: Market Size & Forecast
  24.11.5 Infrastructure: Market Size & Forecast
24.12 France
  24.12.1 Market Overview
  24.12.2 Investment: Market Size & Forecast
  24.12.3 Area: Market Size & Forecast
  24.12.4 Power Capacity: Market Size & Forecast
  24.12.5 Infrastructure: Market Size & Forecast
24.13 Ireland
  24.13.1 Market Overview
  24.13.2 Investment: Market Size & Forecast
  24.13.3 Area: Market Size & Forecast
  24.13.4 Power Capacity: Market Size & Forecast
  24.13.5 Infrastructure: Market Size & Forecast
24.14 Other Western European Countries
  24.14.1 Market Overview
  24.14.2 Investment: Market Size & Forecast
  24.14.3 Area: Market Size & Forecast
  24.14.4 Power Capacity: Market Size & Forecast
  24.14.5 Infrastructure: Market Size & Forecast

25 NORDIC REGION

25.1 Investment: Snapshot & Growth Engine
25.2 Area: Snapshot & Growth Engine
25.3 Power Capacity: Snapshot & Growth Engine
25.4 Market Overview
25.5 Investment
  25.5.1 Market Size & Forecast
25.6 Area
  25.6.1 Market Size & Forecast
25.7 Power Capacity
  25.7.1 Market Size & Forecast
25.8 Infrastructure
  25.8.1 Market Size & Forecast
25.9 Denmark
  25.9.1 Market Overview
  25.9.2 Investment: Market Size & Forecast
  25.9.3 Area: Market Size & Forecast
  25.9.4 Power Capacity: Market Size & Forecast
  25.9.5 Infrastructure: Market Size & Forecast
25.10 Norway
  25.10.1 Market Overview
  25.10.2 Investment: Market Size & Forecast
  25.10.3 Area: Market Size & Forecast
  25.10.4 Power Capacity: Market Size & Forecast
  25.10.5 Infrastructure: Market Size & Forecast
25.11 Sweden
  25.11.1 Market Overview
  25.11.2 Investment: Market Size & Forecast
  25.11.3 Area: Market Size & Forecast
  25.11.4 Power Capacity: Market Size & Forecast
  25.11.5 Infrastructure: Market Size & Forecast
25.12 Finland & Iceland
  25.12.1 Market Overview
  25.12.2 Investment: Market Size & Forecast
  25.12.3 Area: Market Size & Forecast
  25.12.4 Power Capacity: Market Size & Forecast
  25.12.5 Infrastructure: Market Size & Forecast

26 CENTRAL & EASTERN EUROPE (CEE)

26.1 Investment: Snapshot & Growth Engine
26.2 Area: Snapshot & Growth Engine
26.3 Power Capacity: Snapshot & Growth Engine
26.4 Market Overview
26.5 Investment
  26.5.1 Market Size & Forecast
26.6 Area
  26.6.1 Market Size & Forecast
26.7 Power Capacity
  26.7.1 Market Size & Forecast
26.8 Infrastructure
  26.8.1 Market Size & Forecast
26.9 Russia & The Czech Republic (RCR)
  26.9.1 Market Overview
  26.9.2 Investment: Market Size & Forecast
  26.9.3 Area: Market Size & Forecast
  26.9.4 Power Capacity: Market Size & Forecast
  26.9.5 Infrastructure: Market Size & Forecast
26.10 Poland & Austria
  26.10.1 Market Overview
  26.10.2 Investment: Market Size & Forecast
  26.10.3 Area: Market Size & Forecast
  26.10.4 Power Capacity: Market Size & Forecast
  26.10.5 Infrastructure: Market Size & Forecast
26.11 Other Central & Eastern European Countries
  26.11.1 Market Overview
  26.11.2 Investment: Market Size & Forecast
  26.11.3 Area: Market Size & Forecast
  26.11.4 Power Capacity: Market Size & Forecast
  26.11.5 Infrastructure: Market Size & Forecast

27 MIDDLE EAST

27.1 Investment: Snapshot & Growth Engine
27.2 Area: Snapshot & Growth Engine
27.3 Power Capacity: Snapshot & Growth Engine
27.4 Market Overview
27.5 Investment
  27.5.1 Market Size & Forecast
27.6 Area
  27.6.1 Market Size & Forecast
27.7 Power Capacity
  27.7.1 Market Size & Forecast
27.8 Infrastructure
  27.8.1 Market Size & Forecast
27.9 GCC
  27.9.1 Market Overview
  27.9.2 Investment: Market Size & Forecast
  27.9.3 Area: Market Size & Forecast
  27.9.4 Power Capacity: Market Size & Forecast
  27.9.5 Infrastructure: Market Size & Forecast
27.10 Other Middle Eastern Countries
  27.10.1 Market Overview
  27.10.2 Investment: Market Size & Forecast
  27.10.3 Area: Market Size & Forecast
  27.10.4 Power Capacity: Market Size & Forecast
  27.10.5 Infrastructure: Market Size & Forecast

28 AFRICA

28.1 Investment: Snapshot & Growth Engine
28.2 Area: Snapshot & Growth Engine
28.3 Power Capacity: Snapshot & Growth Engine
28.4 Market Overview
28.5 Investment
  28.5.1 Market Size & Forecast
28.6 Area
  28.6.1 Market Size & Forecast
28.7 Power Capacity
  28.7.1 Market Size & Forecast
28.8 Infrastructure
  28.8.1 Market Size & Forecast
28.9 South Africa
  28.9.1 Market Overview
  28.9.2 Investment: Market Size & Forecast
  28.9.3 Area: Market Size & Forecast
  28.9.4 Power Capacity: Market Size & Forecast
  28.9.5 Infrastructure: Market Size & Forecast
28.10 Kenya
  28.10.1 Market Overview
  28.10.2 Investment: Market Size & Forecast
  28.10.3 Area: Market Size & Forecast
  28.10.4 Power Capacity: Market Size and Forecast
  28.10.5 Infrastructure: Market Size & Forecast
28.11 Other African Countries
  28.11.1 Market Overview
  28.11.2 Investment: Market Size & Forecast
  28.11.3 Area: Market Size & Forecast
  28.11.4 Power Capacity: Market Size & Forecast
  28.11.5 Infrastructure: Market Size & Forecast

29 APAC

29.1 Investment: Snapshot & Growth Engine
29.2 Area: Snapshot & Growth Engine
29.3 Power Capacity: Snapshot & Growth Engine
29.4 Market Overview
29.5 Investment
  29.5.1 Market Size & Forecast
29.6 Area
  29.6.1 Market Size & Forecast
29.7 Power Capacity
  29.7.1 Market Size & Forecast
29.8 Infrastructure
  29.8.1 Market Size & Forecast
29.9 China & Hong Kong
  29.9.1 Market Overview
  29.9.2 Investment: Market Size & Forecast
  29.9.3 Area: Market Size & Forecast
  29.9.4 Power Capacity: Market Size & Forecast
  29.9.5 Infrastructure: Market Size & Forecast
29.10 Australia & New Zealand
  29.10.1 Market Overview
  29.10.2 Investment: Market Size & Forecast
  29.10.3 Area: Market Size & Forecast
  29.10.4 Power Capacity: Market Size & Forecast
  29.10.5 Infrastructure: Market Size & Forecast
29.11 India
  29.11.1 Market Overview
  29.11.2 Investment: Market Size & Forecast
  29.11.3 Area: Market Size & Forecast
  29.11.4 Power Capacity: Market Size & Forecast
  29.11.5 Infrastructure: Market Size & Forecast
29.12 Japan
  29.12.1 Market Overview
  29.12.2 Investment: Market Size & Forecast
  29.12.3 Area: Market Size & Forecast
  29.12.4 Power Capacity: Market Size & Forecast
  29.12.5 Infrastructure: Market Size & Forecast
29.13 Rest Of APAC
  29.13.1 Market Overview
  29.13.2 Investment: Market Size & Forecast
  29.13.3 Area: Market Size & Forecast
  29.13.4 Power Capacity: Market Size & Forecast
  29.13.5 Infrastructure: Market Size & Forecast

30 SOUTHEAST ASIA

30.1 Investment: Snapshot & Growth Engine
30.2 Area: Snapshot & Growth Engine
30.3 Power Capacity: Snapshot & Growth Engine
30.4 Market Overview
30.5 Investment
  30.5.1 Market Size & Forecast
30.6 Area
  30.6.1 Market Size & Forecast
30.7 Power Capacity
  30.7.1 Market Size & Forecast
30.8 Infrastructure
  30.8.1 Market Size & Forecast
30.9 Singapore
  30.9.1 Market Overview
  30.9.2 Investment: Market Size & Forecast
  30.9.3 Area: Market Size & Forecast
  30.9.4 Power Capacity: Market Size & Forecast
  30.9.5 Infrastructure: Market Size & Forecast
30.10 Malaysia
  30.10.1 Market Overview
  30.10.2 Investment: Market Size & Forecast
  30.10.3 Area: Market Size & Forecast
  30.10.4 Power Capacity: Market Size & Forecast
  30.10.5 Infrastructure: Market Size & Forecast
30.11 Thailand
  30.11.1 Market Overview
  30.11.2 Investment: Market Size & Forecast
  30.11.3 Area: Market Size & Forecast
  30.11.4 Power Capacity: Market Size & Forecast
  30.11.5 Infrastructure: Market Size & Forecast
30.12 Indonesia
  30.12.1 Market Overview
  30.12.2 Investment: Market Size & Forecast
  30.12.3 Area: Market Size & Forecast
  30.12.4 Power Capacity: Market Size & Forecast
  30.12.5 Infrastructure: Market Size & Forecast
30.13 Other Southeast Asian Countries
  30.13.1 Market Overview
  30.13.2 Investment: Market Size & Forecast
  30.13.3 Area: Market Size & Forecast
  30.13.4 Power Capacity: Market Size & Forecast
  30.13.5 Infrastructure: Market Size & Forecast

31 COMPETITIVE LANDSCAPE

31.1 Electrical Infrastructure
31.2 Mechanical Infrastructure
31.3 General Construction

32 KEY DATA CENTER SUPPORT INFRASTRUCTURE PROVIDERS

32.1 ABB
  32.1.1 Business Overview
  32.1.2 Product Offerings
  32.1.3 Key News
32.2 Eaton
  32.2.1 Business Overview
  32.2.2 Product Offerings
  32.2.3 Key News
32.3 Rittal
  32.3.1 Business Overview
  32.3.2 Product Offerings
32.4 Schneider Electric
  32.4.1 Business Overview
  32.4.2 Product Offerings
  32.4.3 Key News
32.5 STULZ
  32.5.1 Business Overview
  32.5.2 Product Offerings
32.6 Vertiv
  32.6.1 Business Overview
  32.6.2 Product Offerings
32.7 Caterpillar
  32.7.1 Business Overview
  32.7.2 Product Offerings
32.8 Cummins
  32.8.1 Business Overview
  32.8.2 Product Offerings

33 KEY DATA CENTER CONTRACTORS

33.1 AECOM
  33.1.1 Business Overview
  33.1.2 Service Offerings
33.2 BOUYGUES
  33.2.1 Business Overview
  33.2.2 Service Offerings
33.3 DPR Construction
  33.3.1 Business Overview
  33.3.2 Service Offerings
33.4 Holder Construction
  33.4.1 Business Overview
  33.4.2 Service Offerings
33.5 Jacobs Engineering Group
  33.5.1 Business Overview
  33.5.2 Service Offerings
33.6 Mercury Engineering
  33.6.1 Business Overview
  33.6.2 Service Offerings
33.7 M+W Group
  33.7.1 Business Overview
  33.7.2 Service Offerings

34 KEY DATA CENTER INVESTORS

34.1 APPLE
  34.1.1 Business Overview
  34.1.2 Service Offerings
  34.1.3 KeyNews
34.2 AWS (Amazon Web Services)
  34.2.1 Business Overview
  34.2.2 Service Offerings
  34.2.3 Key News
34.3 Cyrusone
  34.3.1 Business Overview
  34.3.2 Service Offerings
  34.3.3 Key News
34.4 Digital Realty
  34.4.1 Business Overview
  34.4.2 Service Offerings
  34.4.3 Key News
34.5 Equinix
  34.5.1 Business Overview
  34.5.2 Service Offerings
  34.5.3 Key News
34.6 Facebook
  34.6.1 Business Overview
  34.6.2 Service Offerings
  34.6.3 Key News
34.7 GDS Holdings
  34.7.1 Business Overview
  34.7.2 Service Offerings
  34.7.3 Key News
34.8 Google
  34.8.1 Business Overview
  34.8.2 Service Offerings
34.9 Microsoft
  34.9.1 Business Overview
34.10 NTT Communications
  34.10.1 Business Overview
  34.10.2 Service Offerings
  34.10.3 Key News

35 OTHER PROMINENT SUPPORT INFRASTRUCTURE PROVIDERS

35.1 Airedale Air Conditioning
  35.1.1 Business Overview
  35.1.2 Product Offerings
  35.1.3 Key News
35.2 Asetek
  35.2.1 Business Overview
  35.2.2 Product Offerings
35.3 Alfa Laval
  35.3.1 Business Overview
  35.3.2 Product Offerings
35.4 Altima Technologies (NETZOOM)
  35.4.1 Business Overview
  35.4.2 Product Offerings
35.5 Assa Abloy
  35.5.1 Business Overview
  35.5.2 Product Offerings
35.6 Bosch Security Systems (Robert Bosch)
  35.6.1 Business Overview
  35.6.2 Product Offerings
35.7 Condair Group
  35.7.1 Business Overview
  35.7.2 Product Offerings
35.8 Delta Group
  35.8.1 Business Overview
  35.8.2 Product Offerings
35.9 Green Revolution Cooling
  35.9.1 Business Overview
  35.9.2 Product Offerings
35.10 Hitech Power Protection
  35.10.1 Business Overview
  35.10.2 Product Offerings
35.11 Kohler (SDMO)
  35.11.1 Business Overview
  35.11.2 Product Offerings
35.12 Legrand
  35.12.1 Business Overview
  35.12.2 Product Offerings
35.13 Nlyte Software
  35.13.1 Business Overview
  35.13.2 Product Offerings
35.14 (Rolls-Royce Power Systems AG)
  35.14.1 Business Overview
  35.14.2 Product Offerings
  35.14.3 Key News
35.15 Mitsubishi
  35.15.1 Business Overview
  35.15.2 Product Offerings
35.16 Socomec
  35.16.1 Business Overview
  35.16.2 Product Offerings
35.17 Trane (Ingersoll Rand)
  35.17.1 Business Overview
  35.17.2 Product Offerings
35.18 Zincfive
  35.18.1 Business Overview
  35.18.2 Product Offering

36 OTHER PROMINENT CONSTRUCTION CONTRACTORS

36.1 Arup Group
  36.1.1 Business Overview
  36.1.2 Service offerings
36.2 CAP Ingelec
  36.2.1 Business Overview
  36.2.2 Service offerings
36.3 Corgan
  36.3.1 Business Overview
  36.3.2 Service offerings
36.4 CSF Group
  36.4.1 Business Overview
  36.4.2 Service offerings
36.5 Faithful+Gould
  36.5.1 Business Overview
  36.5.2 Service Offerings
36.6 Fluor Corporation
  36.6.1 Business Overview
  36.6.2 Service offerings
36.7 Fortis Construction
  36.7.1 Business Overview
  36.7.2 Service offerings
36.8 Gensler
  36.8.1 Business Overview
  36.8.2 Service offerings
36.9 Gilbane Building CO.
  36.9.1 Business Overview
  36.9.2 Service offerings
36.10 HDR Architecture
  36.10.1 Business Overview
  36.10.2 Service offerings
36.11 ISG
  36.11.1 Business Overview
  36.11.2 Service Offerings
36.12 Jones Engineering
  36.12.1 Business Overview
  36.12.2 Service offerings
36.13 Kirby Group Engineering
  36.13.1 Business Overview
  36.13.2 Service offerings
36.14 KKR Investment Group (ACECO TI S.A.)
  36.14.1 Business Overview
  36.14.2 Service offerings
36.15 L&T (Larsen & Toubro)
  36.15.1 Business Overview
  36.15.2 Service Offerings
36.16 Linesight
  36.16.1 Business Overview
  36.16.2 Service Offerings
36.17 MACE Group
  36.17.1 Business Overview
  36.17.2 Service Offerings
36.18 Morrison Hershfield
  36.18.1 Business Overview
  36.18.2 Service offerings
36.19 Mortenson Construction
  36.19.1 Business Overview
  36.19.2 Service offerings
36.20 Red-Engineering
  36.20.1 Business Overview
  36.20.2 Service Offerings
36.21 Structure Tone
  36.21.1 Business Overview
  36.21.2 Service offerings
36.22 Syska Hennessy Group
  36.22.1 Business Overview
  36.22.2 Service offerings
36.23 WINTHROP
  36.23.1 Business Overview
  36.23.2 Service Offerings

37 OTHER PROMINENT DATA CENTER INVESTORS

37.1 21VIANET (Century Internet Data Center)
  37.1.1 Business Overview
  37.1.2 Service Offerings
37.2 Africa Data Centres
  37.2.1 Business Overview
  37.2.2 Service Offerings
  37.2.3 Key News
37.3 Cologix (COLO-D)
  37.3.1 Business Overview
  37.3.2 Service Offerings
  37.3.3 Key News
37.4 Colt Data Centre Services (COLT DCS)
  37.4.1 Business Overview
  37.4.2 Service Offerings
  37.4.3 Key News
37.5 Compass Data Centers (Root Data Center)
  37.5.1 Business Overview
  37.5.2 Service Offerings
37.6 Copt Data Center Solutions
  37.6.1 Business Overview
  37.6.2 Service Offerings
  37.6.3 Key News
37.7 Coresite Realty
  37.7.1 Business Overview
  37.7.2 Service Offerings
  37.7.3 Key News
37.8 Canberra Data Centers
  37.8.1 Business Overview
  37.8.2 Service Offerings
37.9 ETISALAT
  37.9.1 Business Overview
  37.9.2 Service Offerings
37.10 Global Switch
  37.10.1 Business Overview
  37.10.2 Service Offerings
  37.10.3 Key News
37.11 Kepple DC
  37.11.1 Business Overview
  37.11.2 Service Offerings
  37.11.3 Key News
37.12 NEXTDC
  37.12.1 Business Overview
  37.12.2 Service Offerings
  37.12.3 Key News
37.13 QTS Realty Trust
  37.13.1 Business Overview
  37.13.2 Service Offerings
  37.13.3 Key News
37.14 ST Telemedia Global Data Centres
  37.14.1 Business Overview
  37.14.2 Service Offerings
  37.14.3 Key News
37.15 Shanghai ATHUB
  37.15.1 Business Overview
  37.15.2 Service Offerings
37.16 Scala Data Centers
  37.16.1 Business Overview
  37.16.2 Service Offerings
37.17 Tenglong Holdings Group (TAMRON)
  37.17.1 Business Overview
  37.17.2 Service Offerings
37.18 Turkcell
  37.18.1 Business Overview
  37.18.2 Service Offerings
37.19 Teraco Data Environments
  37.19.1 Business Overview
  37.19.2 Service Offerings
37.20 Vantage Data Center
  37.20.1 Business Overview
  37.20.2 Service Offerings
  37.20.3 Key News

38 REPORT SUMMARY

38.1 Key Takeaways

39 QUANTITATIVE SUMMARY

39.1 Global Data Center Market
  39.1.1 Overall Market
  39.1.2 Facility Type Investment
  39.1.3 Facility Type Power Capacity
  39.1.4 Infrastructure: Market Size & Forecast
  39.1.5 Electrical Infrastructure: Market Size & Forecast
  39.1.6 Mechanical Infrastructure: Market Size & Forecast
  39.1.7 Cooling Systems: Market Size & Forecast
  39.1.8 Cooling Techniques : Market Size & Forecast
  39.1.9 Liquid-based Cooling Techniques : Market Size & Forecast
  39.1.10 General Construction : Market Size & Forecast
  39.1.11 Tier Standards : Market Size & Forecast
39.2 Geography
  39.2.1 Investment by Geography
  39.2.2 Area by Geography
  39.2.3 Power Capacity by Geography
39.3 North America
  39.3.1 Overall Market Size
  39.3.2 Market by Infrastructure
39.4 US
  39.4.1 Overall Market Size
  39.4.2 Market by Infrastructure
39.5 Canada
  39.5.1 Overall Market Size
  39.5.2 Market by Infrastructure
39.6 Latin America
  39.6.1 Overall Market Size
  39.6.2 Market by Infrastructure
39.7 Brazil
  39.7.1 Overall Market Size
  39.7.2 Market by Infrastructure
39.8 Other Latin American Countries
  39.8.1 Overall Market Size
  39.8.2 Market by Infrastructure
39.9 Western Europe
  39.9.1 Overall Market Size
  39.9.2 Market by Infrastructure
39.10 UK
  39.10.1 Overall Market Size
  39.10.2 Market by Infrastructure
39.11 Germany
  39.11.1 Overall Market Size
  39.11.2 Market by Infrastructure
39.12 Netherlands
  39.12.1 Overall Market Size
  39.12.2 Market By Infrastructure
39.13 France
  39.13.1 Overall Market Size
  39.13.2 Market By Infrastructure
39.14 Ireland
  39.14.1 Overall Market Size
  39.14.2 Market by Infrastructure
39.15 Other Western European Countries
  39.15.1 Overall Market Size
  39.15.2 Market by Infrastructure
39.16 Nordic
  39.16.1 Overall Market Size
  39.16.2 Market By Infrastructure
39.17 Denmark
  39.17.1 Overall Market Size
  39.17.2 Market by Infrastructure
39.18 Norway
  39.18.1 Overall Market Size
  39.18.2 Market by Infrastructure
39.19 Sweden
  39.19.1 Overall Market Size
  39.19.2 Market by Infrastructure
39.20 Finland & Iceland
  39.20.1 Overall Market Size
  39.20.2 Market by Infrastructure
39.21 Central & Eastern Europe
  39.21.1 Overall Market Size
  39.21.2 Market by Infrastructure
39.22 Russia & Czech Republic
  39.22.1 Overall Market Size
  39.22.2 Market by Infrastructure
39.23 Poland & Austria
  39.23.1 Overall Market Size
  39.23.2 Market by Infrastructure
39.24 Other Central & Eastern European Countries
  39.24.1 Overall Market Size
  39.24.2 Market by Infrastructure
39.25 Middle East
  39.25.1 Overall Market Size
  39.25.2 Market by Infrastructure
39.26 GCC
  39.26.1 Overall Market Size
  39.26.2 Market by Infrastructure
39.27 Other Middle Eastern Countries
  39.27.1 Overall Market Size
  39.27.2 Market by Infrastructure
39.28 Africa
  39.28.1 Overall Market Size
  39.28.2 Market by Infrastructure
39.29 South Africa
  39.29.1 Overall Market Size
  39.29.2 Market by Infrastructure
39.30 Kenya
  39.30.1 Overall Market Size
  39.30.2 Market by Infrastructure
39.31 Other African Countries
  39.31.1 Overall Market Size
  39.31.2 Market by Infrastructure
39.32 APAC
  39.32.1 Overall Market Size
  39.32.2 Market by Infrastructure
39.33 China & Hong Kong
  39.33.1 Overall Market Size
  39.33.2 Market by Infrastructure
39.34 Australia & New Zealand
  39.34.1 Overall Market Size
  39.34.2 Market by Infrastructure
39.35 India
  39.35.1 Overall Market Size
  39.35.2 Market by Infrastructure
39.36 Japan
  39.36.1 Overall Market Size
  39.36.2 Market by Infrastructure
39.37 Rest Of APAC
  39.37.1 Overall Market Size
  39.37.2 Market by Infrastructure
39.38 Southeast Asia
  39.38.1 Overall Market Size
  39.38.2 Market by Infrastructure
39.39 Singapore
  39.39.1 Overall Market Size
  39.39.2 Market by Infrastructure
39.40 Indonesia
  39.40.1 Overall Market Size
  39.40.2 Market by Infrastructure
39.41 Malaysia
  39.41.1 Overall Market Size
  39.41.2 Market by Infrastructure
39.42 Thailand
  39.42.1 Overall Market Size
  39.42.2 Market by Infrastructure
39.43 Other Southeast Asian Countries
  39.43.1 Overall Market Size
  39.43.2 Market by Infrastructure

40 APPENDIX

40.1 Abbreviations

LIST OF EXHIBITS

Exhibit 1 Segmentation of Global Data Center Construction Market
Exhibit 2 Market Size Calculation Approach 2020
Exhibit 3 Internet Penetration Across Regions in 2020
Exhibit 4 Average Electricity Pricing 2020 (per kW)
Exhibit 5 Impact of 5G to Grow Edge Data Center Investments
Exhibit 6 Impact of Growing Procurement of Renewable Energy
Exhibit 7 Renewable Energy Purchases by Data Center Providers 2020
Exhibit 8 Impact of Innovative Data Center Technologies
Exhibit 9 Impact of Innovative UPS Battery Technology
Exhibit 10 Impact of Software-Defined Power & Data Center Infrastructure Automation
Exhibit 11 Impact of AI Promotes Liquid Immersion & Direct-to-Chip Cooling Adoption
Exhibit 12 Impact of COVID-19 Boosts the Data Centers Investments
Exhibit 13 Impact of Cloud Adoption Drives the Data Center Market
Exhibit 14 Leading Cloud Availability Regions in 2020
Exhibit 15 Impact of Snowballing Demand for Big Data & IoT Investments
Exhibit 16 Impact of Rising Colocation Investment
Exhibit 17 Number of Colocation Projects by Geographic Regions (2020)
Exhibit 18 Impact of M&As and Joint Venture in Data Center Growth
Exhibit 19 Impact of Increasing Construction of Hyperscale Data Centers
Exhibit 20 Number of Hyperscale Projects by Geographic Regions (2020)
Exhibit 21 Impact of Availability of Power Resources & Tax Incentives
Exhibit 22 Impact of Rising Carbon Emission from Data Centers
Exhibit 23 Impact of Increase in Power & Network Outages
Exhibit 24 Impact of Location Constraints for Data Center Construction
Exhibit 25 Impact of Lack of Skilled Workforce
Exhibit 26 Global Data Center Construction Market 2020?2026 ($ billion)
Exhibit 27 Snapshot: Global Data Center Construction Market Investment by Support Infrastructure & Geography 2020
Exhibit 28 Global Data Center Construction Market by Area 2020?2026 (million square feet)
Exhibit 29 Snapshot: Global Data Center Construction Market Area Developed by Geography 2020
Exhibit 30 Global Data Center Construction Market by Power Capacity 2020?2026 (MW)
Exhibit 31 Snapshot: Global Data Center Construction Market Power Capacity by Geography 2020
Exhibit 32 Five Forces Analysis 2020
Exhibit 33 Incremental Growth of Investment by Facility 2020 & 2026
Exhibit 34 Incremental Growth of Power Capacity by Facility 2020 & 2026
Exhibit 35 Small Data Center Investments by Region in 2020
Exhibit 36 Global Data Center Construction Market by Small Data Center 2020?2026 ($ billion)
Exhibit 37 Global Small Data Center Construction Market by Power Capacity 2020?2026 (MW)
Exhibit 38 Medium Size Data Center Investments by Region in 2020
Exhibit 39 Global Data Center Construction Market by Medium Data Center 2020?2026 ($ billion)
Exhibit 40 Global Medium Data Center Construction Market by Power Capacity 2020?2026 (MW)
Exhibit 41 Hyperscale Data Center investments by Region in 2020
Exhibit 42 Global Data Center Construction Market by Hyperscale Data Center 2020?2026 ($ billion)
Exhibit 43 Global Hyperscale Data Center Construction Market by Power Capacity 2020?2026 (MW)
Exhibit 44 Incremental Growth by Infrastructure 2020 & 2026
Exhibit 45 Global Data Center Construction Market by Infrastructure
Exhibit 46 Global Data Center Construction Market by Electrical Infrastructure 2020?2026 ($ billion)
Exhibit 47 Historical Market Growth Data Center Electrical Infrastructure 2019 vs 2020
Exhibit 48 Global Data Center Construction Market by Mechanical Infrastructure 2020?2026 ($ billion)
Exhibit 49 Historical Market Growth Data Center Mechanical Infrastructure 2019 vs 2020
Exhibit 50 Global Data Center Construction Market by General Construction 2020?2026 ($ billion)
Exhibit 51 Historical Market Growth Data Center by General Construction 2019 vs 2020
Exhibit 52 Incremental Growth by Electrical Infrastructure 2020 & 2026
Exhibit 53 Global Data Center Construction Market by UPS Systems 2020?2026 ($ billion)
Exhibit 54 Historical Market Growth Data Center by UPS Systems 2019 vs 2020
Exhibit 55 Global Data Center Construction Market by Generators 2020?2026 ($ billion)
Exhibit 56 Historical Market Growth Data Center by Generators 2019 vs 2020
Exhibit 57 Global Data Center Construction Market by Transfer Switches & Switchgears 2020?2026 ($ billion)
Exhibit 58 Historical Market Growth Data Center by Transfer Switches & Switchgear 2019 vs 2020
Exhibit 59 Global Data Center Construction Market by PDUs 2020?2026 ($ billion)
Exhibit 60 Historical Market Growth Data Center by Power Distribution Units 2019 vs 2020
Exhibit 61 Global Data Center Construction Market by Other Electrical Infrastructure 2020?2026 ($ billion)
Exhibit 62 Historical Market Growth Data Center by Other Electrical Infrastructure 2019 vs 2020
Exhibit 63 Incremental Growth by Mechanical Infrastructure 2020 & 2026
Exhibit 64 Global Data Center Construction Market by Cooling Systems 2020-2026 ($ billion)
Exhibit 65 Historical Market Growth Data Center by Cooling Systems 2019 vs 2020
Exhibit 66 Global Data Center Construction Market by Racks 2020–2026 ($ billion)
Exhibit 67 Historical Market Growth Data Center by Rack Cabinets & Accessories 2019 vs 2020
Exhibit 68 Global Data Center Construction Market by Other Cooling Infrastructure 2020-2026 ($ billion)
Exhibit 69 Historical Market Growth Data Center by Other Mechanical Infrastructure 2019 vs 2020
Exhibit 70 Incremental Growth by Cooling Systems 2020 & 2026
Exhibit 71 Global Data Center Construction Market by CRAC & CRAH Units 2020-2026 ($ billion)
Exhibit 72 Global Data Center Construction Market by Chiller Units 2020-2026 ($ billion)
Exhibit 73 Global Data Center Construction Market by Cooling Towers & Condensers & Dry Coolers 2020-2026 ($ billion)
Exhibit 74 Global Data Center Construction Market by Economizers & Evaporative Coolers 2020-2026 ($ billion)
Exhibit 75 Global Data Center Construction Market by Other Cooling Units 2020-2026 ($ billion)
Exhibit 76 Incremental Growth by Cooling Technique 2020 & 2026
Exhibit 77 Global Data Center Construction Market by Air-based Cooling Techniques 2020-2026 ($ billion)
Exhibit 78 Global Data Center Construction Market by Liquid-based Cooling Techniques 2020-2026 ($ billion)
Exhibit 79 Incremental Growth by Liquid Cooling Technique 2020 & 2026
Exhibit 80 Global Data Center Construction Market by Water-based Cooling Technique 2020-2026 ($ billion)
Exhibit 81 Global Data Center Construction Market by Direct Liquid & Immersion Cooling Techniques 2020-2026 ($ billion)
Exhibit 82 Incremental Growth by General Construction 2020 & 2026
Exhibit 83 Global Data Center Construction Market by Core & Shell Development 2020–2026 ($ billion)
Exhibit 84 Historical Market Growth Data Center by Core & Shell Development 2019 vs 2020
Exhibit 85 Global Data Center Construction Market by Installation & Commissioning 2020–2026 ($ billion)
Exhibit 86 Historical Market Growth Data Center by Installation & Commissioning Services 2019 vs 2020
Exhibit 87 Global Data Center Construction Market by Engineering & Building Design 2020–2026 ($ billion)
Exhibit 88 Historical Market Growth Data Center by Building & Engineering Design 2019 vs 2020
Exhibit 89 Global Data Center Construction Market by Physical Security 2020–2026 ($ billion)
Exhibit 90 Historical Market Growth Data Center by Physical Security 2019 vs 2020
Exhibit 91 Global Data Center Construction Market by DCIM/BMS 2020–2026 ($ billion)
Exhibit 92 Historical Market Growth Data Center by DCIM/BMS 2019 vs 2020
Exhibit 93 Incremental Growth by Tier Standards 2020 & 2026
Exhibit 94 Overview of Tier Standards
Exhibit 95 Global Data Center Construction Market by Tier I & Tier II 2020–2026 ($ billion)
Exhibit 96 Global Data Center Construction Market by Tier III 2020–2026 ($ billion)
Exhibit 97 Global Data Center Construction Market by Tier IV 2020?2026 ($ billion)
Exhibit 98 Incremental Growth by Geography 2020 & 2026
Exhibit 99 Incremental Growth in North America by Investment 2020 & 2026
Exhibit 100 Incremental Growth in North America by Area 2020 & 2026
Exhibit 101 Incremental Growth in North America by Power Capacity 2020 & 2026
Exhibit 102 Data Center Construction Market in North America 2020?2026 ($ billion)
Exhibit 103 Data Center Construction Market in North America by Area 2020–2026 (Million Square Feet)
Exhibit 104 Data Center Construction Market in North America by Power Capacity 2020–2026 (MW)
Exhibit 105 Data Center Construction Market in North America by Infrastructure 2020-2026 ($ billion)
Exhibit 106 Data Center Construction Market in US 2020?2026 ($ billion)
Exhibit 107 Data Center Construction Market in US by Area 2020?2026 (Million Square Feet)
Exhibit 108 Data Center Construction Market in US by Power Capacity 2020?2026 (MW)
Exhibit 109 Data Center Construction Market in US by Infrastructure 2020?2026 ($ billion)
Exhibit 110 Data Center Construction Market in Canada 2020?2026 ($ billion)
Exhibit 111 Data Center Construction Market in Canada by Area 2020?2026 (Million Square Feet)
Exhibit 112 Data Center Construction Market in Canada by Power Capacity 2020?2026 (MW)
Exhibit 113 Data Center Construction Market in Canada by Infrastructure 2020?2026 ($ billion)
Exhibit 114 Incremental Growth in Latin America by Investment 2020 & 2026
Exhibit 115 Incremental Growth in Latin America by Area 2020 & 2026
Exhibit 116 Incremental Growth in Latin America by Power Capacity 2020 & 2026
Exhibit 117 Data Center Construction Market in Latin America 2020?2026 ($ billion)
Exhibit 118 Data Center Construction Market in Latin America by Area 2020?2026 (Million Square Feet)
Exhibit 119 Data Center Construction Market in Latin America by Power Capacity 2020?2026 (MW)
Exhibit 120 Data Center Construction Market in Latin America by Infrastructure 2020?2026 ($ billion)
Exhibit 121 Data Center Construction Market in Brazil 2020?2026 ($ million)
Exhibit 122 Data Center Construction Market in Brazil by Area 2020?2026 (Million Square Feet)
Exhibit 123 Data Center Construction Market in Brazil by Power Capacity 2020?2026 (MW)
Exhibit 124 Data Center Construction Market in Brazil by Infrastructure 2020?2026 ($ million)
Exhibit 125 Data Center Construction Market in Other Latin American Countries 2020?2026 ($ million)
Exhibit 126 Data Center Construction Market in Other Latin American Countries by Area 2020?2026 (Million Square Feet)
Exhibit 127 Data Center Construction Market in Other Latin American Countries by Power Capacity 2020?2026 (MW)
Exhibit 128 Data Center Construction Market in Other Latin American Countries by Infrastructure 2020?2026 ($ million)
Exhibit 129 Incremental Growth in Western Europe by Investment 2020 & 2026
Exhibit 130 Incremental Growth in Western Europe by Area 2020 & 2026
Exhibit 131 Incremental Growth in Western Europe by Power Capacity 2020 & 2026
Exhibit 132 Data Center Construction Market in Western Europe 2020?2026 ($ billion)
Exhibit 133 Data Center Construction Market in Western Europe by Area 2020?2026 (Million Square Feet)
Exhibit 134 Data Center Construction Market in Western Europe by Power Capacity 2020?2026 (MW)
Exhibit 135 Data Center Construction Market in Western Europe by Infrastructure 2020?2026 ($ billion)
Exhibit 136 Data Center Construction Market in UK 2020?2026 ($ million)
Exhibit 137 Data Center Construction Market in UK by Area 2020?2026 (Million Square Feet)
Exhibit 138 Data Center Construction Market in UK by Power Capacity 2020?2026 (MW)
Exhibit 139 Data Center Construction Market in UK by Infrastructure 2020?2026 ($ million)
Exhibit 140 Data Center Construction Market in Germany 2020?2026 ($ million)
Exhibit 141 Data Center Construction Market in Germany by Area 2020?2026 (Million Square Feet)
Exhibit 142 Data Center Construction Market in Germany by Power Capacity 2020?2026 (MW)
Exhibit 143 Data Center Construction Market in Germany by Infrastructure 2020?2026 ($ million)
Exhibit 144 Data Center Construction Market in Netherlands 2020?2026 ($ million)
Exhibit 145 Data Center Construction Market in Netherlands by Area 2020?2026 (Million Square Feet)
Exhibit 146 Data Center Construction Market in the Netherlands by Power Capacity 2020?2026 (MW)
Exhibit 147 Data Center Construction Market in Netherlands by Infrastructure 2020?2026 ($ million)
Exhibit 148 Data Center Construction Market in France 2020?2026 ($ million)
Exhibit 149 Data Center Construction Market in France by Area 2020?2026 (million square feet)
Exhibit 150 Data Center Construction Market in France by Power Capacity 2020?2026 (MW)
Exhibit 151 Data Center Construction Market in France by Infrastructure 2020?2026 ($ million)
Exhibit 152 Data Center Construction Market in Ireland 2020?2026 ($ million)
Exhibit 153 Data Center Construction Market in Ireland by Area 2020?2026 (Million Square Feet)
Exhibit 154 Data Center Construction Market in Ireland by Power Capacity 2020?2026 (MW)
Exhibit 155 Data Center Construction Market in Ireland by Infrastructure 2020?2026 ($ million)
Exhibit 156 Data Center Construction Market in Other Western European Countries 2020?2026 ($ million)
Exhibit 157 Data Center Construction Market in Other Western European Countries by Area 2020?2026 (million square feet)
Exhibit 158 Data Center Construction Market in Other Western European Countries by Power Capacity 2020?2026 (MW)
Exhibit 159 Data Center Construction Market in Other Western European Countries by Infrastructure 2020?2026 ($ million)
Exhibit 160 Incremental Growth in Nordics by Investment 2020 & 2026
Exhibit 161 Incremental Growth in Nordics by Area 2020 & 2026
Exhibit 162 Incremental Growth in Nordics by Power Capacity 2020 & 2026
Exhibit 163 Data Center Construction Market in Nordics 2020–2026 ($ billion)
Exhibit 164 Data Center Construction Market in Nordics by Area 2020–2026 (Million Square Feet)
Exhibit 165 Data Center Construction Market in Nordics by Power Capacity 2020–2026 (MW)
Exhibit 166 Data Center Construction Market in the Nordics by Infrastructure 2020?2026 ($ billion)
Exhibit 167 Data Center Construction Market in Denmark 2020?2026 ($ million)
Exhibit 168 Data Center Construction Market in Denmark by Area 2020?2026 (Million Square Feet)
Exhibit 169 Data Center Construction Market in Denmark by Power Capacity 2020?2026 (MW)
Exhibit 170 Data Center Construction Market in Denmark by Infrastructure 2020?2026 ($ million)
Exhibit 171 Data Center Construction Market in Norway 2020?2026 ($ million)
Exhibit 172 Data Center Construction Market in Norway by Area 2020?2026 (Million Square Feet)
Exhibit 173 Data Center Construction Market in Norway by Power Capacity 2020?2026 (MW)
Exhibit 174 Data Center Construction Market in Norway by Infrastructure 2020?2026 ($ million)
Exhibit 175 Data Center Construction Market in Sweden 2020?2026 ($ million)
Exhibit 176 Data Center Construction Market in Sweden by Area 2020?2026 (Million Square Feet)
Exhibit 177 Data Center Construction Market in Sweden by Power Capacity 2020?2026 (MW)
Exhibit 178 Data Center Construction Market in Sweden by Infrastructure 2020?2026 ($ million)
Exhibit 179 Data Center Construction Market in Finland & Iceland 2020?2026 ($ million)
Exhibit 180 Data Center Construction Market in Finland & Iceland by Area 2020?2026 (Million Square Feet)
Exhibit 181 Data Center Construction Market in Finland & Iceland by Power Capacity 2020?2026 (MW)
Exhibit 182 Data Center Construction Market in Finland & Iceland by Infrastructure 2020?2026 ($ million)
Exhibit 183 Incremental Growth in Central & Eastern Europe (CEE) by Investment 2020 & 2026
Exhibit 184 Incremental Growth in Central & Eastern Europe (CEE) by Area 2020 & 2026
Exhibit 185 Incremental Growth in Central & Eastern Europe (CEE) by Power Capacity 2020 & 2026
Exhibit 186 Data Center Construction Market in Central & Eastern Europe 2020–2026 ($ billion)
Exhibit 187 Data Center Construction Market in Central & Eastern Europe by Area 2020–2026 (Million Square Feet)
Exhibit 188 Data Center Construction Market in Central & Eastern Europe by Power Capacity 2020–2026 (MW)
Exhibit 189 Data Center Construction Market in Central & Eastern Europe by Infrastructure 2020?2026 ($ million)
Exhibit 190 Data Center Construction Market in Russia & the Czech Republic 2020?2026 ($ million)
Exhibit 191 Data Center Construction Market in Russia & the Czech Republic by Area 2020?2026 (Million Square Feet)
Exhibit 192 Data Center Construction Market in Russia & the Czech Republic by Power Capacity 2020?2026 (MW)
Exhibit 193 Data Center Construction Market in Russia & the Czech Republic by Infrastructure 2020?2026 ($ million)
Exhibit 194 Data Center Construction Market in Poland & Austria 2020?2026 ($ million)
Exhibit 195 Data Center Construction Market in Poland & Austria by Area 2020?2026 (Million Square Feet)
Exhibit 196 Data Center Construction Market in Poland & Austria by Power Capacity 2020?2026 (MW)
Exhibit 197 Data Center Construction Market in Poland & Austria by Infrastructure 2020?2026 ($ million)
Exhibit 198 Data Center Construction Market in Other Central & Eastern European countries 2020?2026 ($ million)
Exhibit 199 Data Center Construction Market in Other Central & Eastern European countries by Area 2020?2026 (Million Square Feet)
Exhibit 200 Data Center Construction Market in Other Central & Eastern European Countries by Power Capacity 2020?2026 (MW)
Exhibit 201 Data Center Construction Market in Other Central & Eastern European Countries by Infrastructure 2020?2026 ($ million)
Exhibit 202 Incremental Growth in the Middle East by Investment 2020 & 2026
Exhibit 203 Incremental Growth in the Middle East by Area 2020 & 2026
Exhibit 204 Incremental Growth in the Middle East by Power Capacity 2020 & 2026
Exhibit 205 Data Center Construction Market in the Middle East 2020–2026 ($ billion)
Exhibit 206 Data Center Construction Market in the Middle East by Area 2020–2026 (Million Square Feet)
Exhibit 207 Data Center Construction Market in the Middle East by Power Capacity 2020–2026 (MW)
Exhibit 208 Data Center Construction Market in the Middle East by Infrastructure 2020?2026 ($ billion)
Exhibit 209 Data Center Construction Market in GCC 2020?2026 ($ million)
Exhibit 210 Data Center Construction Market in GCC by Area 2020?2026 (Million Square Feet)
Exhibit 211 Data Center Construction Market in GCC by Power Capacity 2020?2026 (MW)
Exhibit 212 Data Center Construction Market in GCC by Infrastructure 2020?2026 ($ million)
Exhibit 213 Data Center Construction Market in Other Middle Eastern Countries 2020?2026 ($ million)
Exhibit 214 Data Center Construction Market in Other Middle Eastern Countries by Area 2020?2026 (Million Square Feet)
Exhibit 215 Data Center Construction Market in Other Middle Eastern Countries by Power Capacity 2020?2026 (MW)
Exhibit 216 Data Center Construction Market in Other Middle Eastern Countries by Infrastructure 2020?2026 ($ million)
Exhibit 217 Incremental Growth in Africa by Investment 2020 & 2026
Exhibit 218 Incremental Growth in Africa by Area 2020 & 2026
Exhibit 219 Incremental Growth in Africa by Power Capacity 2020 & 2026
Exhibit 220 Data Center Construction Market in Africa 2020–2026 ($ billion)
Exhibit 221 Data Center Construction Market in Africa by Area 2020–2026 (Million Square Feet)
Exhibit 222 Data Center Construction Market in Africa by Power Capacity 2020–2026 (MW)
Exhibit 223 Data Center Construction Market in Africa by Infrastructure 2020?2026 ($ billion)
Exhibit 224 Data Center Construction Market in South Africa 2020?2026 ($ million)
Exhibit 225 Data Center Construction Market in South Africa by Area 2020?2026 (Million Square Feet)
Exhibit 226 Data Center Construction Market in South Africa by Power Capacity 2020?2026 (MW)
Exhibit 227 Data Center Construction Market in South Africa by Infrastructure 2020?2026 ($ million)
Exhibit 228 Data Center Construction Market in Kenya 2020-2026 ($ million)
Exhibit 229 Data Center Construction Market in Kenya by Area 2020-2026 (Million Square Feet)
Exhibit 230 Data Center Construction Market in Kenya by Power Capacity 2020-2026 (MW)
Exhibit 231 Data Center Construction Market in Kenya by Infrastructure 2020–2026 ($ million)
Exhibit 232 Data Center Construction Market in Other African Countries 2020?2026 ($ million)
Exhibit 233 Data Center Construction Market in Other African Countries by Area 2020?2026 (Million Square Feet)
Exhibit 234 Data Center Construction Market in Other African Countries by Power Capacity 2020?2026 (MW)
Exhibit 235 Data Center Construction Market in Other African Countries by Infrastructure 2020?2026 ($ million)
Exhibit 236 Incremental Growth in APAC by Investment 2020 & 2026
Exhibit 237 Incremental Growth in APAC by Area 2020 & 2026
Exhibit 238 Incremental Growth in APAC by Power Capacity 2020 & 2026
Exhibit 239 Data Center Construction Market in APAC 2020?2026 ($ billion)
Exhibit 240 Data Center Construction Market in APAC by Area 2020?2026 (Million Square Feet)
Exhibit 241 Data Center Construction Market in APAC by Power Capacity 2020?2026 (MW)
Exhibit 242 Data Center Construction Market in APAC by Infrastructure 2020?2026 ($ billion)
Exhibit 243 Data Center Construction Market in China & Hong Kong 2020?2026 ($ billion)
Exhibit 244 Data Center Construction Market in China & Hong Kong by Area 2020?2026 (Million Square Feet)
Exhibit 245 Data Center Construction Market in China & Hong Kong by Power Capacity 2020?2026 (MW)
Exhibit 246 Data Center Construction Market in China & Hong Kong by Infrastructure 2020?2026 ($ billion)
Exhibit 247 Data Center Construction Market in Australia & New Zealand 2020?2026 ($ billion)
Exhibit 248 Data Center Construction Market in Australia & New Zealand by Area 2020?2026 (Million Square Feet)
Exhibit 249 Data Center Construction Market in Australia & New Zealand by Power Capacity 2020?2026 (MW)
Exhibit 250 Data Center Construction Market in Australia & New Zealand by Infrastructure 2020?2026 ($ million)
Exhibit 251 Data Center Construction Market in India 2020?2026 ($ billion)
Exhibit 252 Data Center Construction Market in India by Area 2020?2026 (Million Square Feet)
Exhibit 253 Data Center Construction Market in India by Power Capacity 2020?2026 (MW)
Exhibit 254 Data Center Construction Market in India by Infrastructure 2020?2026 ($ billion)
Exhibit 255 Data Center Construction Market in Japan 2020?2026 ($ billion)
Exhibit 256 Data Center Construction Market in Japan by Area 2020?2026 (Million Square Feet)
Exhibit 257 Data Center Construction Market in Japan by Power Capacity 2020?2026 (MW)
Exhibit 258 Data Center Construction Market in Japan by Infrastructure 2020?2026 ($ billion)
Exhibit 259 Data Center Construction Market in the rest of APAC 2020?2026 ($ billion)
Exhibit 260 Data Center Construction Market in the rest of APAC by Area 2020?2026 (Million Square Feet)
Exhibit 261 Data Center Construction Market in the rest of APAC by Power Capacity 2020?2026 (MW)
Exhibit 262 Data Center Construction Market in the rest of APAC by Infrastructure 2020?2026 ($ million)
Exhibit 263 Incremental Growth in Southeast Asia by Investment 2020 & 2026
Exhibit 264 Incremental Growth in Southeast Asia by Area 2020 & 2026
Exhibit 265 Incremental Growth in Southeast Asia by Power Capacity 2020 & 2026
Exhibit 266 Data Center Construction Market in Southeast Asia 2020?2026 ($ billion)
Exhibit 267 Data Center Construction Market in Southeast Asia by Area 2020?2026 (Million Square Feet)
Exhibit 268 Data Center Construction Market in Southeast Asia by Power Capacity 2020?2026 (MW)
Exhibit 269 Data Center Construction Market in Southeast Asia by Infrastructure 2020?2026 ($ billion)
Exhibit 270 Data Center Construction Market in Singapore 2020?2026 ($ million)
Exhibit 271 Data Center Construction Market in Singapore by Area 2020?2026 (million square feet)
Exhibit 272 Data Center Construction Market in Singapore by Power Capacity 2020?2026 (MW)
Exhibit 273 Data Center Construction Market in Singapore by Infrastructure 2020?2026 ($ million)
Exhibit 274 Data Center Construction Market in Malaysia 2020?2026 ($ million)
Exhibit 275 Data Center Construction Market in Malaysia by Area 2020?2026 (Million Square Feet)
Exhibit 276 Data Center Construction Market in Malaysia by Power Capacity 2020?2026 (MW)
Exhibit 277 Data Center Construction Market in Malaysia by Infrastructure 2020?2026 ($ million)
Exhibit 278 Data Center Construction Market in Thailand 2020?2026 ($ million)
Exhibit 279 Data Center Construction Market in Thailand by Area 2020?2026 (million square feet)
Exhibit 280 Data Center Construction Market in Thailand by Power Capacity 2020?2026 (MW)
Exhibit 281 Data Center Construction Market in Thailand by Infrastructure 2020?2026 ($ million)
Exhibit 282 Data Center Construction Market in Indonesia 2020?2026 ($ million)
Exhibit 283 Data Center Construction Market in Indonesia by Area 2020?2026 (Million Square Feet)
Exhibit 284 Data Center Construction Market in Indonesia by Power Capacity 2020?2026 (MW)
Exhibit 285 Data Center Construction Market in Indonesia by Infrastructure 2020?2026 ($ million)
Exhibit 286 Data Center Construction Market in Other Southeast Asian Countries 2020?2026 ($ million)
Exhibit 287 Data Center Construction Market in Other Southeast Asian Countries by Area 2020?2026 (Million Square Feet)
Exhibit 288 Data Center Construction Market in Other Southeast Asian Countries by Power Capacity 2020?2026 (MW)
Exhibit 289 Data Center Construction Market in Other Southeast Asian Countries by Infrastructure 2020?2026 ($ million)
Exhibit 290 Schneider Electric: Product Offerings

LIST OF TABLES

Table 1 Key Caveats
Table 2 Currency Conversion 2013?2020
Table 3 Data Center Site Selection Criteria
Table 4 List of Submarine Fiber Cable Projects
Table 5 Impact of COVID-19 in the Data Center Construction Market in 2020
Table 6 M&A Activities in 2020
Table 7 ABB: Product Offerings
Table 8 Eaton: Product Offerings
Table 9 Rittal: Product Offerings
Table 10 Stulz: Product Offerings
Table 11 Vertiv: Product Offerings
Table 12 Caterpillar: Product Offerings
Table 13 Cummins: Product Offerings
Table 14 Global Data Center Construction Market 2020?2026
Table 15 Global Data Center Construction Market Investment by Facility Type 2020?2026
Table 16 Global Data Center Construction Market Power Capacity by Facility Type 2020?2026
Table 17 Global Data Center Construction Market by Infrastructure 2020?2026 ($ billion)
Table 18 Global Data Center Construction Market by Electrical Infrastructure 2020?2026 ($ billion)
Table 19 Global Data Center Construction Market by Mechanical Infrastructure 2020?2026 ($ billion)
Table 20 Global Data Center Construction Market by Cooling Systems 2020?2026 ($ billion)
Table 21 Global Data Center Construction Market by Cooling Techniques 2020?2026 ($ billion)
Table 22 Global Data Center Construction Market by Liquid-based Cooling Techniques 2020?2026 ($ billion)
Table 23 Global Data Center Construction Market by General Construction 2020?2026 ($ billion)
Table 24 Global Data Center Construction Market by Tier Standards 2020?2026 ($ billion)
Table 25 Global Data Center Construction Market Investment by Geography 2020-2026 ($ billion)
Table 26 Global Data Center Construction Market Area by Geography 2020-2026 (Million Square Feet)
Table 27 Global Data Center Construction Market Power Capacity by Geography 2020-2026 (MW)
Table 28 Data Center Construction Market in North America 2020-2026
Table 29 Data Center Construction Market in North America by Infrastructure 2020-2026 ($ billion)
Table 30 Data Center Construction Market in US 2020-2026
Table 31 Data Center Construction Market in US by Infrastructure 2020-2026 ($ billion)
Table 32 Data Center Construction Market in Canada 2020-2026
Table 33 Data Center Construction Market in Canada by Infrastructure 2020-2026 ($ billion)
Table 34 Data Center Construction Market in Latin America 2020-2026
Table 35 Data Center Construction Market in Latin America by Infrastructure 2020-2026 ($ billion)
Table 36 Data Center Construction Market in Brazil 2020-2026
Table 37 Data Center Construction Market in Brazil by Infrastructure 2020-2026 ($ million)
Table 38 Data Center Construction Market in Other Latin American Countries 2020-2026
Table 39 Data Center Construction Market in Other Latin American Countries by Infrastructure 2020-2026 ($ million)
Table 40 Data Center Construction Market in Western Europe 2020-2026
Table 41 Data Center Construction Market in Western Europe by Infrastructure 2020-2026 ($ billion)
Table 42 Data Center Construction Market in UK 2020-2026
Table 43 Data Center Construction Market in UK by Infrastructure 2020-2026 ($ million)
Table 44 Data Center Construction Market in Germany 2020-2026
Table 45 Data Center Construction Market in Germany by Infrastructure 2020-2026 ($ million)
Table 46 Data Center Construction Market in Netherlands 2020-2026
Table 47 Data Center Construction Market in Netherlands by Infrastructure 2020-2026 ($ million)
Table 48 Data Center Construction Market in France 2020-2026
Table 49 Data Center Construction Market in France by Infrastructure 2020-2026 ($ million)
Table 50 Data Center Construction Market in Ireland 2020-2026
Table 51 Data Center Construction Market in Ireland by Infrastructure 2020-2026 ($ million)
Table 52 Data Center Construction Market in Other Western European Countries 2020-2026
Table 53 Data Center Construction Market in Other Western European Countries by Infrastructure 2020-2026 ($ million)
Table 54 Data Center Construction Market in Nordic 2020-2026
Table 55 Data Center Construction Market in Nordic by Infrastructure 2020-2026 ($ billion)
Table 56 Data Center Construction Market in Denmark 2020-2026
Table 57 Data Center Construction Market in Denmark by Infrastructure 2020-2026 ($ million)
Table 58 Data Center Construction Market in Norway 2020-2026
Table 59 Data Center Construction Market in Norway by Infrastructure 2020-2026 ($ million)
Table 60 Data Center Construction Market in Sweden 2020-2026
Table 61 Data Center Construction Market in Sweden by Infrastructure 2020-2026 ($ million)
Table 62 Data Center Construction Market in Finland & Iceland 2020-2026
Table 63 Data Center Construction Market in Finland & Iceland by Infrastructure 2020-2026 ($ million)
Table 64 Data Center Construction Market in Central & Eastern Europe 2020-2026
Table 65 Data Center Construction Market in Central & Eastern Europe by Infrastructure 2020-2026 ($ billion)
Table 66 Data Center Construction Market in Russia & the Czech Republic 2020-2026
Table 67 Data Center Construction Market in Russia & the Czech Republic by Infrastructure 2020-2026 ($ million)
Table 68 Data Center Construction Market in Poland & Austria 2020-2026
Table 69 Data Center Construction Market in Poland & Austria by Infrastructure 2020-2026 ($ million)
Table 70 Data Center Construction Market in Other Central & Eastern European Countries 2020-2026
Table 71 Data Center Construction Market in Other Central & Eastern European Countries by Infrastructure 2020-2026 ($ million)
Table 72 Data Center Construction Market in the middle east 2020-2026
Table 73 Data Center Construction Market in the middle east by Infrastructure 2020-2026 ($ billion)
Table 74 Data Center Construction Market in GCC 2020-2026
Table 75 Data Center Construction Market in GCC by Infrastructure 2020-2026 ($ million)
Table 76 Data Center Construction Market in Other Middle Eastern Countries 2020-2026
Table 77 Data Center Construction Market in Other Middle Eastern Countries by Infrastructure 2020-2026 ($ million)
Table 78 Data Center Construction Market in Africa 2020-2026
Table 79 Data Center Construction Market in Africa by Infrastructure 2020-2026 ($ billion)
Table 80 Data Center Construction Market in South Africa 2020-2026
Table 81 Data Center Construction Market in South Africa by Infrastructure 2020-2026 ($ million)
Table 82 Data Center Construction Market in Kenya 2020-2026
Table 83 Data Center Construction Market in Kenya by Infrastructure 2020-2026 ($ million)
Table 84 Data Center Construction Market in Other African Countries 2020-2026
Table 85 Data Center Construction Market in Other African Countries by Infrastructure 2020-2026 ($ million)
Table 86 Data Center Construction Market in APAC 2020-2026
Table 87 Data Center Construction Market in APAC by Infrastructure 2020-2026 ($ billion)
Table 88 Data Center Construction Market in China & Hong Kong 2020-2026
Table 89 Data Center Construction Market in China & Hong Kong by Infrastructure 2020-2026 ($ billion)
Table 90 Data Center Construction Market in Australia & New Zealand 2020-2026
Table 91 Data Center Construction Market in Australia & New Zealand by Infrastructure 2020-2026 ($ billion)
Table 92 Data Center Construction Market in India 2020-2026
Table 93 Data Center Construction Market in India by Infrastructure 2020-2026 ($ billion)
Table 94 Data Center Construction Market in Japan 2020-2026
Table 95 Data Center Construction Market in Japan by Infrastructure 2020-2026 ($ billion)
Table 96 Data Center Construction Market in the rest of APAC 2020-2026
Table 97 Data Center Construction Market in the rest of APAC by Infrastructure 2020-2026 ($ billion)
Table 98 Data Center Construction Market in Southeast Asia 2020-2026
Table 99 Data Center Construction Market in Southeast Asia by Infrastructure 2020-2026 ($ billion)
Table 100 Data Center Construction Market in Singapore 2020-2026
Table 101 Data Center Construction Market in Singapore by Infrastructure 2020-2026 ($ million)
Table 102 Data Center Construction Market in Indonesia 2020-2026
Table 103 Data Center Construction Market in Indonesia by Infrastructure 2020-2026 ($ million)
Table 104 Data Center Construction Market in Malaysia 2020-2026
Table 105 Data Center Construction Market in Malaysia by Infrastructure 2020-2026 ($ million)
Table 106 Data Center Construction Market in Thailand 2020-2026
Table 107 Data Center Construction Market in Thailand by Infrastructure 2020-2026 ($ million)
Table 108 Data Center Construction Market in Other Southeast Asian Countries 2020-2026
Table 109 Data Center Construction Market in Other Southeast Asian Countries by Infrastructure 2020-2026 ($ million)