Data Center Construction Market: Global Industry Trends, Share, Size, Growth, Opportunity and Forecast 2023-2028

February 2023 | 146 pages | ID: DC3FE2CB2688EN
IMARC Group

US$ 2,499.00

E-mail Delivery (PDF), Hard Copy Mail Delivery, CD-ROM Mail Delivery

Download PDF Leaflet

Accepted cards
Wire Transfer
Checkout Later
Need Help? Ask a Question
The global data center construction market size reached US$ 51.4 Billion in 2022. Looking forward, IMARC Group expects the market to reach US$ 80.7 Billion by 2028, exhibiting a growth rate (CAGR) of 8.7% during 2023-2028.

Data center construction refers to the collective process of physically constructing a data center facility. The primary focus is on designing and building a data center with the required capacity, disaster tolerance systems and efficient design to perform all the necessary functions. The infrastructure usually consists of backup power supplies, data communication connections, security devices and air conditioning and fire suppression systems. This ensures that all the resources are optimally utilized, and all the environmental factors are taken into consideration.

Significant growth in the IT industry is one of the key factors creating a positive outlook for the market. The rising penetration of connected devices and convenient access to the Internet have increased the demand for data storage systems across the globe. Furthermore, widespread utilization of big data analytics, cloud-based systems and the Internet of Things (IoT) for computing videos, audio and other formats of data is also driving the market growth. Large data centers are increasingly being constructed across various sectors for enhancing computing ability, memory, networking infrastructure and storage resources. Additionally, increasing emphasis on the construction of green data centers is acting as another growth-inducing factor. Green data centers use low-emission building materials that aid in creating sustainable ecosystems and ensure efficient waste recycling. Other factors, including the increasing adoption of liquid cooling technology and direct-to-chip cooling server racks to prevent overheating in data centers, along with extensive infrastructural developments, are expected to drive the market further.

Key Market Segmentation:
IMARC Group provides an analysis of the key trends in each sub-segment of the global data center construction market report, along with forecasts at the global, regional and country level from 2023-2028. Our report has categorized the market based on construction type, data center type, tier standards and vertical.

Breakup by Construction Type:

Electrical Construction
UPS
Rach Power Distribution Unit (PDU)
Generators
Transfer Switches and Switchgears
Others
Mechanical Construction
Cooling Systems
Racks
Others

Breakup by Data Center Type:

Mid-Size Data Centers
Enterprise Data Centers
Large Data Centers

Breakup by Tier Standards:

Tier I & II
Tier III
Tier IV

Breakup by Vertical:

Public Sector
Oil & Energy
Media & Entertainment
IT & Telecommunication
Banking, Financial Services and Insurance (BFSI)
Healthcare
Retail
Others

Breakup by Region:

North America
United States
Canada
Asia Pacific
China
Japan
India
South Korea
Australia
Indonesia
Others
Europe
Germany
France
United Kingdom
Italy
Spain
Russia
Others
Latin America
Brazil
Mexico
Others
Middle East and Africa
Turkey
Saudi Arabia
Others

Competitive Landscape:

The competitive landscape of the industry has also been examined with some of the key players being AECOM, DPR construction Inc., Eaton Corporation Inc., Fujitsu Limited, Holder Construction Company, Legrand SA, Rittal GmbH & Co. KG, Schneider Electric SE, Tripp Lite, Turner Construction and Vertiv Group Corporation.

Key Questions Answered in This Report

1. What was the size of the global data center construction market in 2022?
2. What is the expected growth rate of the global data center construction market during 2023-2028?
3. What are the key factors driving the global data center construction market?
4. What has been the impact of COVID-19 on the global data center construction market?
5. What is the breakup of the global data center construction market based on the construction type?
6. What is the breakup of the global data center construction market based on the data center type?
7. What is the breakup of the global data center construction market based on the tier standards?
8. What is the breakup of the global data center construction market based on the vertical?
9. What are the key regions in the global data center construction market?
10. Who are the key players/companies in the global data center construction market?
1 PREFACE

2 SCOPE AND METHODOLOGY

2.1 Objectives of the Study
2.2 Stakeholders
2.3 Data Sources
  2.3.1 Primary Sources
  2.3.2 Secondary Sources
2.4 Market Estimation
  2.4.1 Bottom-Up Approach
  2.4.2 Top-Down Approach
2.5 Forecasting Methodology

3 EXECUTIVE SUMMARY

4 INTRODUCTION

4.1 Overview
4.2 Key Industry Trends

5 GLOBAL DATA CENTER CONSTRUCTION MARKET

5.1 Market Overview
5.2 Market Performance
5.3 Impact of COVID-19
5.4 Market Forecast

6 MARKET BREAKUP BY CONSTRUCTION TYPE

6.1 Electrical Construction
  6.1.1 Market Trends
  6.1.2 Market Breakup by Component Type
  6.1.3 Market Forecast
6.2 Mechanical Construction
  6.2.1 Market Trends
  6.2.2 Market Breakup by Component Type
  6.2.3 Market Forecast

7 MARKET BREAKUP BY DATA CENTER TYPE

7.1 Mid-Size Data Centers
  7.1.1 Market Trends
  7.1.2 Market Forecast
7.2 Enterprise Data Centers
  7.2.1 Market Trends
  7.2.2 Market Forecast
7.3 Large Data Centers
  7.3.1 Market Trends
  7.3.2 Market Forecast

8 MARKET BREAKUP BY TIER STANDARDS

8.1 Tier I & II
  8.1.1 Market Trends
  8.1.2 Market Forecast
8.2 Tier III
  8.2.1 Market Trends
  8.2.2 Market Forecast
8.3 Tier IV
  8.3.1 Market Trends
  8.3.2 Market Forecast

9 MARKET BREAKUP BY VERTICAL

9.1 Public Sector
  9.1.1 Market Trends
  9.1.2 Market Forecast
9.2 Oil & Energy
  9.2.1 Market Trends
  9.2.2 Market Forecast
9.3 Media & Entertainment
  9.3.1 Market Trends
  9.3.2 Market Forecast
9.4 IT & Telecommunication
  9.4.1 Market Trends
  9.4.2 Market Forecast
9.5 Banking, Financial Services and Insurance (BFSI)
  9.5.1 Market Trends
  9.5.2 Market Forecast
9.6 Healthcare
  9.6.1 Market Trends
  9.6.2 Market Forecast
9.7 Retail
  9.7.1 Market Trends
  9.7.2 Market Forecast
9.8 Others
  9.8.1 Market Trends
  9.8.2 Market Forecast

10 MARKET BREAKUP BY REGION

10.1 North America
  10.1.1 United States
    10.1.1.1 Market Trends
    10.1.1.2 Market Forecast
  10.1.2 Canada
    10.1.2.1 Market Trends
    10.1.2.2 Market Forecast
10.2 Asia Pacific
  10.2.1 China
    10.2.1.1 Market Trends
    10.2.1.2 Market Forecast
  10.2.2 Japan
    10.2.2.1 Market Trends
    10.2.2.2 Market Forecast
  10.2.3 India
    10.2.3.1 Market Trends
    10.2.3.2 Market Forecast
  10.2.4 South Korea
    10.2.4.1 Market Trends
    10.2.4.2 Market Forecast
  10.2.5 Australia
    10.2.5.1 Market Trends
    10.2.5.2 Market Forecast
  10.2.6 Indonesia
    10.2.6.1 Market Trends
    10.2.6.2 Market Forecast
  10.2.7 Others
    10.2.7.1 Market Trends
    10.2.7.2 Market Forecast
10.3 Europe
  10.3.1 Germany
    10.3.1.1 Market Trends
    10.3.1.2 Market Forecast
  10.3.2 France
    10.3.2.1 Market Trends
    10.3.2.2 Market Forecast
  10.3.3 United Kingdom
    10.3.3.1 Market Trends
    10.3.3.2 Market Forecast
  10.3.4 Italy
    10.3.4.1 Market Trends
    10.3.4.2 Market Forecast
  10.3.5 Spain
    10.3.5.1 Market Trends
    10.3.5.2 Market Forecast
  10.3.6 Russia
    10.3.6.1 Market Trends
    10.3.6.2 Market Forecast
  10.3.7 Others
    10.3.7.1 Market Trends
    10.3.7.2 Market Forecast
10.4 Latin America
  10.4.1 Brazil
    10.4.1.1 Market Trends
    10.4.1.2 Market Forecast
  10.4.2 Mexico
    10.4.2.1 Market Trends
    10.4.2.2 Market Forecast
  10.4.3 Others
    10.4.3.1 Market Trends
    10.4.3.2 Market Forecast
10.5 Middle East and Africa
  10.5.1 Turkey
    10.5.1.1 Market Trends
    10.5.1.2 Market Forecast
  10.5.2 Saudi Arabia
    10.5.2.1 Market Trends
    10.5.2.2 Market Forecast
  10.5.3 Others
    10.5.3.1 Market Trends
    10.5.3.2 Market Forecast

11 SWOT ANALYSIS

11.1 Overview
11.2 Strengths
11.3 Weaknesses
11.4 Opportunities
11.5 Threats

12 VALUE CHAIN ANALYSIS

13 PORTERS FIVE FORCES ANALYSIS

13.1 Overview
13.2 Bargaining Power of Buyers
13.3 Bargaining Power of Suppliers
13.4 Degree of Competition
13.5 Threat of New Entrants
13.6 Threat of Substitutes

14 PRICE ANALYSIS

15 COMPETITIVE LANDSCAPE

15.1 Market Structure
15.2 Key Players
15.3 Profiles of Key Players
  15.3.1 AECOM
    15.3.1.1 Company Overview
    15.3.1.2 Product Portfolio
    15.3.1.3 Financials
    15.3.1.4 SWOT Analysis
  15.3.2 DPR construction Inc.
    15.3.2.1 Company Overview
    15.3.2.2 Product Portfolio
    15.3.2.3 SWOT Analysis
  15.3.3 Eaton Corporation Inc.
    15.3.3.1 Company Overview
    15.3.3.2 Product Portfolio
  15.3.4 Fujitsu Limited
    15.3.4.1 Company Overview
    15.3.4.2 Product Portfolio
  15.3.5 Holder Construction Company
    15.3.5.1 Company Overview
    15.3.5.2 Product Portfolio
  15.3.6 Legrand SA
    15.3.6.1 Company Overview
    15.3.6.2 Product Portfolio
  15.3.7 Rittal GmbH & Co. KG
    15.3.7.1 Company Overview
    15.3.7.2 Product Portfolio
  15.3.8 Schneider Electric SE
    15.3.8.1 Company Overview
    15.3.8.2 Product Portfolio
    15.3.8.3 Financials
  15.3.9 Tripp Lite
    15.3.9.1 Company Overview
    15.3.9.2 Product Portfolio
  15.3.10 Turner Construction
    15.3.10.1 Company Overview
    15.3.10.2 Product Portfolio
  15.3.11 Vertiv Group Corporation
    15.3.11.1 Company Overview
    15.3.11.2 Product Portfolio

LIST OF TABLES

Table 1: Global: Data Center Construction Market: Key Industry Highlights, 2022 and 2028
Table 2: Global: Data Center Construction Market Forecast: Breakup by Construction Type (in Million US$), 2023-2028
Table 3: Global: Data Center Construction Market Forecast: Breakup by Data Center Type (in Million US$), 2023-2028
Table 4: Global: Data Center Construction Market Forecast: Breakup by Tier Standards (in Million US$), 2023-2028
Table 5: Global: Data Center Construction Market Forecast: Breakup by Vertical (in Million US$), 2023-2028
Table 6: Global: Data Center Construction Market Forecast: Breakup by Region (in Million US$), 2023-2028
Table 7: Global: Data Center Construction Market: Competitive Structure
Table 8: Global: Data Center Construction Market: Key Players

LIST OF FIGURES

Figure 1: Global: Data Center Construction Market: Major Drivers and Challenges
Figure 2: Global: Data Center Construction Market: Sales Value (in Billion US$), 2017-2022
Figure 3: Global: Data Center Construction Market Forecast: Sales Value (in Billion US$), 2023-2028
Figure 4: Global: Data Center Construction Market: Breakup by Construction Type (in %), 2022
Figure 5: Global: Data Center Construction Market: Breakup by Data Center Type (in %), 2022
Figure 6: Global: Data Center Construction Market: Breakup by Tier Standards (in %), 2022
Figure 7: Global: Data Center Construction Market: Breakup by Vertical (in %), 2022
Figure 8: Global: Data Center Construction Market: Breakup by Region (in %), 2022
Figure 9: Global: Data Center Construction (Electrical Construction) Market: Sales Value (in Million US$), 2017 & 2022
Figure 10: Global: Data Center Construction Market (Electrical Construction): Breakup by Component Type (in %), 2022
Figure 11: Global: Data Center Construction (Electrical Construction) Market Forecast: Sales Value (in Million US$), 2023-2028
Figure 12: Global: Data Center Construction (Mechanical Construction) Market: Sales Value (in Million US$), 2017 & 2022
Figure 13: Global: Data Center Construction Market (Mechanical Construction): Breakup by Component Type (in %), 2022
Figure 14: Global: Data Center Construction (Mechanical Construction) Market Forecast: Sales Value (in Million US$), 2023-2028
Figure 15: Global: Data Center Construction (Mid-Size Data Centers) Market: Sales Value (in Million US$), 2017 & 2022
Figure 16: Global: Data Center Construction (Mid-Size Data Centers) Market Forecast: Sales Value (in Million US$), 2023-2028
Figure 17: Global: Data Center Construction (Enterprise Data Centers) Market: Sales Value (in Million US$), 2017 & 2022
Figure 18: Global: Data Center Construction (Enterprise Data Centers) Market Forecast: Sales Value (in Million US$), 2023-2028
Figure 19: Global: Data Center Construction (Large Data Centers) Market: Sales Value (in Million US$), 2017 & 2022
Figure 20: Global: Data Center Construction (Large Data Centers) Market Forecast: Sales Value (in Million US$), 2023-2028
Figure 21: Global: Data Center Construction (Tier I & II) Market: Sales Value (in Million US$), 2017 & 2022
Figure 22: Global: Data Center Construction (Tier I & II) Market Forecast: Sales Value (in Million US$), 2023-2028
Figure 23: Global: Data Center Construction (Tier III) Market: Sales Value (in Million US$), 2017 & 2022
Figure 24: Global: Data Center Construction (Tier III) Market Forecast: Sales Value (in Million US$), 2023-2028
Figure 25: Global: Data Center Construction (Tier IV) Market: Sales Value (in Million US$), 2017 & 2022
Figure 26: Global: Data Center Construction (Tier IV) Market Forecast: Sales Value (in Million US$), 2023-2028
Figure 27: Global: Data Center Construction (Public Sector) Market: Sales Value (in Million US$), 2017 & 2022
Figure 28: Global: Data Center Construction (Public Sector) Market Forecast: Sales Value (in Million US$), 2023-2028
Figure 29: Global: Data Center Construction (Oil & Energy) Market: Sales Value (in Million US$), 2017 & 2022
Figure 30: Global: Data Center Construction (Oil & Energy) Market Forecast: Sales Value (in Million US$), 2023-2028
Figure 31: Global: Data Center Construction (Media & Entertainment) Market: Sales Value (in Million US$), 2017 & 2022
Figure 32: Global: Data Center Construction (Media & Entertainment) Market Forecast: Sales Value (in Million US$), 2023-2028
Figure 33: Global: Data Center Construction (IT & Telecommunication) Market: Sales Value (in Million US$), 2017 & 2022
Figure 34: Global: Data Center Construction (IT & Telecommunication) Market Forecast: Sales Value (in Million US$), 2023-2028
Figure 35: Global: Data Center Construction (BFSI) Market: Sales Value (in Million US$), 2017 & 2022
Figure 36: Global: Data Center Construction (BFSI) Market Forecast: Sales Value (in Million US$), 2023-2028
Figure 37: Global: Data Center Construction (Healthcare) Market: Sales Value (in Million US$), 2017 & 2022
Figure 38: Global: Data Center Construction (Healthcare) Market Forecast: Sales Value (in Million US$), 2023-2028
Figure 39: Global: Data Center Construction (Retail) Market: Sales Value (in Million US$), 2017 & 2022
Figure 40: Global: Data Center Construction (Retail) Market Forecast: Sales Value (in Million US$), 2023-2028
Figure 41: Global: Data Center Construction (Other Verticals) Market: Sales Value (in Million US$), 2017 & 2022
Figure 42: Global: Data Center Construction (Other Verticals) Market Forecast: Sales Value (in Million US$), 2023-2028
Figure 43: North America: Data Center Construction Market: Sales Value (in Million US$), 2017 & 2022
Figure 44: North America: Data Center Construction Market Forecast: Sales Value (in Million US$), 2023-2028
Figure 45: United States: Data Center Construction Market: Sales Value (in Million US$), 2017 & 2022
Figure 46: United States: Data Center Construction Market Forecast: Sales Value (in Million US$), 2023-2028
Figure 47: Canada: Data Center Construction Market: Sales Value (in Million US$), 2017 & 2022
Figure 48: Canada: Data Center Construction Market Forecast: Sales Value (in Million US$), 2023-2028
Figure 49: Asia Pacific: Data Center Construction Market: Sales Value (in Million US$), 2017 & 2022
Figure 50: Asia Pacific: Data Center Construction Market Forecast: Sales Value (in Million US$), 2023-2028
Figure 51: China: Data Center Construction Market: Sales Value (in Million US$), 2017 & 2022
Figure 52: China: Data Center Construction Market Forecast: Sales Value (in Million US$), 2023-2028
Figure 53: Japan: Data Center Construction Market: Sales Value (in Million US$), 2017 & 2022
Figure 54: Japan: Data Center Construction Market Forecast: Sales Value (in Million US$), 2023-2028
Figure 55: India: Data Center Construction Market: Sales Value (in Million US$), 2017 & 2022
Figure 56: India: Data Center Construction Market Forecast: Sales Value (in Million US$), 2023-2028
Figure 57: South Korea: Data Center Construction Market: Sales Value (in Million US$), 2017 & 2022
Figure 58: South Korea: Data Center Construction Market Forecast: Sales Value (in Million US$), 2023-2028
Figure 59: Australia: Data Center Construction Market: Sales Value (in Million US$), 2017 & 2022
Figure 60: Australia: Data Center Construction Market Forecast: Sales Value (in Million US$), 2023-2028
Figure 61: Indonesia: Data Center Construction Market: Sales Value (in Million US$), 2017 & 2022
Figure 62: Indonesia: Data Center Construction Market Forecast: Sales Value (in Million US$), 2023-2028
Figure 63: Others: Data Center Construction Market: Sales Value (in Million US$), 2017 & 2022
Figure 64: Others: Data Center Construction Market Forecast: Sales Value (in Million US$), 2023-2028
Figure 65: Europe: Data Center Construction Market: Sales Value (in Million US$), 2017 & 2022
Figure 66: Europe: Data Center Construction Market Forecast: Sales Value (in Million US$), 2023-2028
Figure 67: Germany: Data Center Construction Market: Sales Value (in Million US$), 2017 & 2022
Figure 68: Germany: Data Center Construction Market Forecast: Sales Value (in Million US$), 2023-2028
Figure 69: France: Data Center Construction Market: Sales Value (in Million US$), 2017 & 2022
Figure 70: France: Data Center Construction Market Forecast: Sales Value (in Million US$), 2023-2028
Figure 71: United Kingdom: Data Center Construction Market: Sales Value (in Million US$), 2017 & 2022
Figure 72: United Kingdom: Data Center Construction Market Forecast: Sales Value (in Million US$), 2023-2028
Figure 73: Italy: Data Center Construction Market: Sales Value (in Million US$), 2017 & 2022
Figure 74: Italy: Data Center Construction Market Forecast: Sales Value (in Million US$), 2023-2028
Figure 75: Spain: Data Center Construction Market: Sales Value (in Million US$), 2017 & 2022
Figure 76: Spain: Data Center Construction Market Forecast: Sales Value (in Million US$), 2023-2028
Figure 77: Russia: Data Center Construction Market: Sales Value (in Million US$), 2017 & 2022
Figure 78: Russia: Data Center Construction Market Forecast: Sales Value (in Million US$), 2023-2028
Figure 79: Others: Data Center Construction Market: Sales Value (in Million US$), 2017 & 2022
Figure 80: Others: Data Center Construction Market Forecast: Sales Value (in Million US$), 2023-2028
Figure 81: Latin America: Data Center Construction Market: Sales Value (in Million US$), 2017 & 2022
Figure 82: Latin America: Data Center Construction Market Forecast: Sales Value (in Million US$), 2023-2028
Figure 83: Brazil: Data Center Construction Market: Sales Value (in Million US$), 2017 & 2022
Figure 84: Brazil: Data Center Construction Market Forecast: Sales Value (in Million US$), 2023-2028
Figure 85: Mexico: Data Center Construction Market: Sales Value (in Million US$), 2017 & 2022
Figure 86: Mexico: Data Center Construction Market Forecast: Sales Value (in Million US$), 2023-2028
Figure 87: Others: Data Center Construction Market: Sales Value (in Million US$), 2017 & 2022
Figure 88: Others: Data Center Construction Market Forecast: Sales Value (in Million US$), 2023-2028
Figure 89: Middle East and Africa: Data Center Construction Market: Sales Value (in Million US$), 2017 & 2022
Figure 90: Middle East and Africa: Data Center Construction Market Forecast: Sales Value (in Million US$), 2023-2028
Figure 91: Turkey: Data Center Construction Market: Sales Value (in Million US$), 2017 & 2022
Figure 92: Turkey: Data Center Construction Market Forecast: Sales Value (in Million US$), 2023-2028
Figure 93: Saudi Arabia: Data Center Construction Market: Sales Value (in Million US$), 2017 & 2022
Figure 94: Saudi Arabia: Data Center Construction Market Forecast: Sales Value (in Million US$), 2023-2028
Figure 95: Others: Data Center Construction Market: Sales Value (in Million US$), 2017 & 2022
Figure 96: Others: Data Center Construction Market Forecast: Sales Value (in Million US$), 2023-2028
Figure 97: Global: Data Center Construction Industry: SWOT Analysis
Figure 98: Global: Data Center Construction Industry: Value Chain Analysis
Figure 99: Global: Data Center Construction Industry: Porter’s Five Forces Analysis