Global data center construction market Size study, by IT Infrastructure (Networking, Equipment, Server, Storage), by Tier Type (Tier 1, Tier 2, Tier 3), by End use (IT & Telecom, BFSI, Government & Defense, Healthcare, Energy, Others) and Regional Forecasts 2021-2027
![](/report_cover/10760/global-data-center-construction-market-size-study-by-it-infrastructure-by-tier-type-by-end-use-n-regional-forecasts-2021-2027_en.gif)
Global data center construction market is valued at approximately USD 220.5 billion in 2020 and is anticipated to grow with a healthy growth rate of more than 6.40% over the forecast period 2021-2027. The activities involved in the designing, planning, and construction of a facility are referred to as the construction process. IT infrastructure, power distribution and cooling solutions, as well as a variety of other expenses, are all included in data centre costs. The market for data centre construction is expected to expand as data consumption continues to rise and enterprise demand for cloud computing grows. The gradual resumption of various data centre facility construction, which was temporarily halted as part of the global lockdowns imposed following the outbreak of the COVID-19 pandemic, and the start of new IT projects are expected to revive the data centre construction market in 2021. Meanwhile, continuous investments in the construction of hyperscale facilities, which house IT infrastructure, power equipment, and cooling equipment, are expected in the market. Public cloud providers such as Facebook, Google, Inc., and Amazon.com are expected to keep investing in their existing infrastructure, resulting in more jobs. Furthermore, various governmental and private data centre construction market initiatives are being undertaken to further accelerate the global Data Center construction market. Amazon, for example, plans to build a US$ 1.08 billion (Euro 1 billion) data centre in Dublin; IBM plans to open three data centres in the United Kingdom; and Facebook, after constructing two data centres in Ireland and Denmark, has announced plans to build a third data centre in Denmark. Interxion also intends to spend US$ 87.8 million (EUR 83 million) on new data centre facilities in London, Frankfurt, and Stockholm. However, high capex, opex & Tco for building data centers may impede market growth over the forecast period of 2021-2027.
The regional analysis of the Global data center construction market is considered for the key regions such as Asia Pacific, North America, Europe, Latin America, and Rest of the World (ROW). North America is the leading region across the world in terms of market share due to aggressive investments in hyperscale projects in the region. Whereas Asia Pacific is also anticipated to exhibit the highest growth rate over the forecast period 2021-2027 due to continuous investments by cloud service providers and hyperscale’s across the region.
Major market player included in this report are:
IBM
Hewlett Packard Enterprise
Dell EMC
Lenovo
Oracle
Fujitsu
Cisco
Equinix, Inc.
Beijing Xingpaiweiye Sports Goods Co. Ltd
Jones Engineering Group
The objective of the study is to define market sizes of different segments & countries in recent years and to forecast the values to the coming eight years. The report is designed to incorporate both qualitative and quantitative aspects of the industry within each of the regions and countries involved in the study. Furthermore, the report also caters the detailed information about the crucial aspects such as driving factors & challenges which will define the future growth of the market. Additionally, the report shall also incorporate available opportunities in micro markets for stakeholders to invest along with the detailed analysis of competitive landscape and product offerings of key players. The detailed segments and sub-segment of the market are explained below:
By IT Infrastructure:
Networking Equipment
Server
Storage
By Tier Type:
Tier 1
Tier 2
Tier 3
By End use:
IT & Telecom
BFSI
Government & Defense
Healthcare
Energy
Others
By Region:
North America
U.S.
Canada
Europe
UK
Germany
France
Spain
Italy
ROE
Asia Pacific
China
India
Japan
Australia
South Korea
RoAPAC
Latin America
Brazil
Mexico
Rest of the World
Furthermore, years considered for the study are as follows:
Historical year –2018,2019
Base year –2020
Forecast period – 2021 to 2027.
Target Audience of the Global data center construction market in Market Study:
Key Consulting Companies & Advisors
Large, medium-sized, and small enterprises
Venture capitalists
Value-Added Resellers (VARs)
Third-party knowledge providers
Investment bankers
Investors
The regional analysis of the Global data center construction market is considered for the key regions such as Asia Pacific, North America, Europe, Latin America, and Rest of the World (ROW). North America is the leading region across the world in terms of market share due to aggressive investments in hyperscale projects in the region. Whereas Asia Pacific is also anticipated to exhibit the highest growth rate over the forecast period 2021-2027 due to continuous investments by cloud service providers and hyperscale’s across the region.
Major market player included in this report are:
IBM
Hewlett Packard Enterprise
Dell EMC
Lenovo
Oracle
Fujitsu
Cisco
Equinix, Inc.
Beijing Xingpaiweiye Sports Goods Co. Ltd
Jones Engineering Group
The objective of the study is to define market sizes of different segments & countries in recent years and to forecast the values to the coming eight years. The report is designed to incorporate both qualitative and quantitative aspects of the industry within each of the regions and countries involved in the study. Furthermore, the report also caters the detailed information about the crucial aspects such as driving factors & challenges which will define the future growth of the market. Additionally, the report shall also incorporate available opportunities in micro markets for stakeholders to invest along with the detailed analysis of competitive landscape and product offerings of key players. The detailed segments and sub-segment of the market are explained below:
By IT Infrastructure:
Networking Equipment
Server
Storage
By Tier Type:
Tier 1
Tier 2
Tier 3
By End use:
IT & Telecom
BFSI
Government & Defense
Healthcare
Energy
Others
By Region:
North America
U.S.
Canada
Europe
UK
Germany
France
Spain
Italy
ROE
Asia Pacific
China
India
Japan
Australia
South Korea
RoAPAC
Latin America
Brazil
Mexico
Rest of the World
Furthermore, years considered for the study are as follows:
Historical year –2018,2019
Base year –2020
Forecast period – 2021 to 2027.
Target Audience of the Global data center construction market in Market Study:
Key Consulting Companies & Advisors
Large, medium-sized, and small enterprises
Venture capitalists
Value-Added Resellers (VARs)
Third-party knowledge providers
Investment bankers
Investors
CHAPTER 1. EXECUTIVE SUMMARY
1.1. Market Snapshot
1.2. Global & Segmental Market Estimates & Forecasts, 2019-2027 (USD Billion)
1.2.1. Data center construction market, by Region, 2019-2027 (USD Billion)
1.2.2. Data center construction market, by IT Infrastructure, 2019-2027 (USD Billion)
1.2.3. Data center construction market, by Tier Type, 2019-2027 (USD Billion)
1.2.4. Data center construction market, by End user, 2019-2027 (USD Billion)
1.3. Key Trends
1.4. Estimation Methodology
1.5. Research Assumption
CHAPTER 2. GLOBAL DATA CENTER CONSTRUCTION MARKET DEFINITION AND SCOPE
2.1. Objective of the Study
2.2. Market Definition & Scope
2.2.1. Scope of the Study
2.2.2. Industry Evolution
2.3. Years Considered for the Study
2.4. Currency Conversion Rates
CHAPTER 3. GLOBAL DATA CENTER CONSTRUCTION MARKET DYNAMICS
3.1. Data center construction market Impact Analysis (2019-2027)
3.1.1. Market Drivers
3.1.1.1. Rapidly increasing data traffic
3.1.1.2. High ebitda margins in the infrastructure sector
3.1.2. Market Restraint
3.1.2.1. High capex, opex & Tco for building data centers
3.1.3. Market Opportunities
3.1.3.1. Growth in adoption of hyperscale data centers to generate opportunity for the market
CHAPTER 4. GLOBAL DATA CENTER CONSTRUCTION MARKET INDUSTRY ANALYSIS
4.1. Porter’s 5 Force Model
4.1.1. Bargaining Power of Suppliers
4.1.2. Bargaining Power of Buyers
4.1.3. Threat of New Entrants
4.1.4. Threat of Substitutes
4.1.5. Competitive Rivalry
4.1.6. Futuristic Approach to Porter’s 5 Force Model (2018-2027)
4.2. PEST Analysis
4.2.1. Political
4.2.2. Economical
4.2.3. Social
4.2.4. Technological
4.3. Investment Adoption Model
4.4. Analyst Recommendation & Conclusion
CHAPTER 5. GLOBAL DATA CENTER CONSTRUCTION MARKET, BY IT INFRASTRUCTURE
5.1. Market Snapshot
5.2. Global Data center construction market by IT Infrastructure , Performance - Potential Analysis
5.3. Global Data center construction market Estimates & Forecasts by IT Infrastructure 2018-2027 (USD Billion)
5.4. Data center construction market, Sub Segment Analysis
5.4.1. Networking Equipment
5.4.2. Server
5.4.3. Storage
CHAPTER 6. GLOBAL DATA CENTER CONSTRUCTION MARKET, BY TIER TYPE
6.1. Market Snapshot
6.2. Global Data center construction market by Tier Type, Performance - Potential Analysis
6.3. Global Data center construction market Estimates & Forecasts by Tier Type 2018-2027 (USD Billion)
6.4. Data center construction market, Sub Segment Analysis
6.4.1. Tier
6.4.2. Tier
6.4.3. Tier
CHAPTER 7. GLOBAL DATA CENTER CONSTRUCTION MARKET, BY END USER
7.1. Market Snapshot
7.2. Global Data center construction market by End user, Performance - Potential Analysis
7.3. Global Data center construction market Estimates & Forecasts by End user 2018-2027 (USD Billion)
7.4. Data center construction market, Sub Segment Analysis
7.4.1. IT & Telecom
7.4.2. BFSI
7.4.3. Government & Defense
7.4.4. Healthcare
7.4.5. Energy
7.4.6. Others
CHAPTER 8. GLOBAL DATA CENTER CONSTRUCTION MARKET, REGIONAL ANALYSIS
8.1. Data center construction market, Regional Market Snapshot
8.2. North America Data center construction market
8.2.1. U.S. Data center construction market
8.2.1.1. IT Infrastructure breakdown estimates & forecasts, 2018-2027
8.2.1.2. Tier Type breakdown estimates & forecasts, 2018-2027
8.2.1.3. End user breakdown estimates & forecasts, 2018-2027
8.2.2. Canada Data center construction market
8.3. Europe Data center construction market Snapshot
8.3.1. U.K. Data center construction market
8.3.2. Germany Data center construction market
8.3.3. France Data center construction market
8.3.4. Spain Data center construction market
8.3.5. Italy Data center construction market
8.3.6. Rest of Europe Data center construction market
8.4. Asia-Pacific Data center construction market Snapshot
8.4.1. China Data center construction market
8.4.2. India Data center construction market
8.4.3. Japan Data center construction market
8.4.4. Australia Data center construction market
8.4.5. South Korea Data center construction market
8.4.6. Rest of Asia Pacific Data center construction market
8.5. Latin America Data center construction market Snapshot
8.5.1. Brazil Data center construction market
8.5.2. Mexico Data center construction market
8.6. Rest of The World Data center construction market
CHAPTER 9. COMPETITIVE INTELLIGENCE
9.1. Top Market Strategies
9.2. Company Profiles
9.2.1. IBM
9.2.1.1. Key Information
9.2.1.2. Overview
9.2.1.3. Financial (Subject to Data Availability)
9.2.1.4. Product Summary
9.2.1.5. Recent Developments
9.2.2. Hewlett Packard Enterprise
9.2.3. Dell EMC
9.2.4. Lenovo
9.2.5. Oracle
9.2.6. Fujitsu
9.2.7. Cisco
9.2.8. Equinix, Inc.
9.2.9. Beijing Xingpaiweiye Sports Goods Co. Ltd
9.2.10. Jones Engineering Group
CHAPTER 10. RESEARCH TIER TYPE
10.1. Research Tier Type
10.1.1. Data Mining
10.1.2. Analysis
10.1.3. Market Estimation
10.1.4. Validation
10.1.5. Publishing
10.2. Research Attributes
10.3. Research Assumption
1.1. Market Snapshot
1.2. Global & Segmental Market Estimates & Forecasts, 2019-2027 (USD Billion)
1.2.1. Data center construction market, by Region, 2019-2027 (USD Billion)
1.2.2. Data center construction market, by IT Infrastructure, 2019-2027 (USD Billion)
1.2.3. Data center construction market, by Tier Type, 2019-2027 (USD Billion)
1.2.4. Data center construction market, by End user, 2019-2027 (USD Billion)
1.3. Key Trends
1.4. Estimation Methodology
1.5. Research Assumption
CHAPTER 2. GLOBAL DATA CENTER CONSTRUCTION MARKET DEFINITION AND SCOPE
2.1. Objective of the Study
2.2. Market Definition & Scope
2.2.1. Scope of the Study
2.2.2. Industry Evolution
2.3. Years Considered for the Study
2.4. Currency Conversion Rates
CHAPTER 3. GLOBAL DATA CENTER CONSTRUCTION MARKET DYNAMICS
3.1. Data center construction market Impact Analysis (2019-2027)
3.1.1. Market Drivers
3.1.1.1. Rapidly increasing data traffic
3.1.1.2. High ebitda margins in the infrastructure sector
3.1.2. Market Restraint
3.1.2.1. High capex, opex & Tco for building data centers
3.1.3. Market Opportunities
3.1.3.1. Growth in adoption of hyperscale data centers to generate opportunity for the market
CHAPTER 4. GLOBAL DATA CENTER CONSTRUCTION MARKET INDUSTRY ANALYSIS
4.1. Porter’s 5 Force Model
4.1.1. Bargaining Power of Suppliers
4.1.2. Bargaining Power of Buyers
4.1.3. Threat of New Entrants
4.1.4. Threat of Substitutes
4.1.5. Competitive Rivalry
4.1.6. Futuristic Approach to Porter’s 5 Force Model (2018-2027)
4.2. PEST Analysis
4.2.1. Political
4.2.2. Economical
4.2.3. Social
4.2.4. Technological
4.3. Investment Adoption Model
4.4. Analyst Recommendation & Conclusion
CHAPTER 5. GLOBAL DATA CENTER CONSTRUCTION MARKET, BY IT INFRASTRUCTURE
5.1. Market Snapshot
5.2. Global Data center construction market by IT Infrastructure , Performance - Potential Analysis
5.3. Global Data center construction market Estimates & Forecasts by IT Infrastructure 2018-2027 (USD Billion)
5.4. Data center construction market, Sub Segment Analysis
5.4.1. Networking Equipment
5.4.2. Server
5.4.3. Storage
CHAPTER 6. GLOBAL DATA CENTER CONSTRUCTION MARKET, BY TIER TYPE
6.1. Market Snapshot
6.2. Global Data center construction market by Tier Type, Performance - Potential Analysis
6.3. Global Data center construction market Estimates & Forecasts by Tier Type 2018-2027 (USD Billion)
6.4. Data center construction market, Sub Segment Analysis
6.4.1. Tier
6.4.2. Tier
6.4.3. Tier
CHAPTER 7. GLOBAL DATA CENTER CONSTRUCTION MARKET, BY END USER
7.1. Market Snapshot
7.2. Global Data center construction market by End user, Performance - Potential Analysis
7.3. Global Data center construction market Estimates & Forecasts by End user 2018-2027 (USD Billion)
7.4. Data center construction market, Sub Segment Analysis
7.4.1. IT & Telecom
7.4.2. BFSI
7.4.3. Government & Defense
7.4.4. Healthcare
7.4.5. Energy
7.4.6. Others
CHAPTER 8. GLOBAL DATA CENTER CONSTRUCTION MARKET, REGIONAL ANALYSIS
8.1. Data center construction market, Regional Market Snapshot
8.2. North America Data center construction market
8.2.1. U.S. Data center construction market
8.2.1.1. IT Infrastructure breakdown estimates & forecasts, 2018-2027
8.2.1.2. Tier Type breakdown estimates & forecasts, 2018-2027
8.2.1.3. End user breakdown estimates & forecasts, 2018-2027
8.2.2. Canada Data center construction market
8.3. Europe Data center construction market Snapshot
8.3.1. U.K. Data center construction market
8.3.2. Germany Data center construction market
8.3.3. France Data center construction market
8.3.4. Spain Data center construction market
8.3.5. Italy Data center construction market
8.3.6. Rest of Europe Data center construction market
8.4. Asia-Pacific Data center construction market Snapshot
8.4.1. China Data center construction market
8.4.2. India Data center construction market
8.4.3. Japan Data center construction market
8.4.4. Australia Data center construction market
8.4.5. South Korea Data center construction market
8.4.6. Rest of Asia Pacific Data center construction market
8.5. Latin America Data center construction market Snapshot
8.5.1. Brazil Data center construction market
8.5.2. Mexico Data center construction market
8.6. Rest of The World Data center construction market
CHAPTER 9. COMPETITIVE INTELLIGENCE
9.1. Top Market Strategies
9.2. Company Profiles
9.2.1. IBM
9.2.1.1. Key Information
9.2.1.2. Overview
9.2.1.3. Financial (Subject to Data Availability)
9.2.1.4. Product Summary
9.2.1.5. Recent Developments
9.2.2. Hewlett Packard Enterprise
9.2.3. Dell EMC
9.2.4. Lenovo
9.2.5. Oracle
9.2.6. Fujitsu
9.2.7. Cisco
9.2.8. Equinix, Inc.
9.2.9. Beijing Xingpaiweiye Sports Goods Co. Ltd
9.2.10. Jones Engineering Group
CHAPTER 10. RESEARCH TIER TYPE
10.1. Research Tier Type
10.1.1. Data Mining
10.1.2. Analysis
10.1.3. Market Estimation
10.1.4. Validation
10.1.5. Publishing
10.2. Research Attributes
10.3. Research Assumption
LIST OF TABLES
List of Tables
TABLE 1. Global Data center construction market, report scope
TABLE 2. Global Data center construction market estimates & forecasts by region 2018-2027 (USD Billion)
TABLE 3. Global Data center construction market estimates & forecasts by IT Infrastructure 2018-2027 (USD Billion)
TABLE 4. Global Data center construction market estimates & forecasts by Tier Type 2018-2027 (USD Billion)
TABLE 5. Global Data center construction market estimates & forecasts by End user 2018-2027 (USD Billion)
TABLE 6. Global Data center construction market by segment, estimates & forecasts, 2018-2027 (USD Billion)
TABLE 7. Global Data center construction market by region, estimates & forecasts, 2018-2027 (USD Billion)
TABLE 8. Global Data center construction market by segment, estimates & forecasts, 2018-2027 (USD Billion)
TABLE 9. Global Data center construction market by region, estimates & forecasts, 2018-2027 (USD Billion)
TABLE 10. Global Data center construction market by segment, estimates & forecasts, 2018-2027 (USD Billion)
TABLE 11. Global Data center construction market by region, estimates & forecasts, 2018-2027 (USD Billion)
TABLE 12. Global Data center construction market by segment, estimates & forecasts, 2018-2027 (USD Billion)
TABLE 13. Global Data center construction market by region, estimates & forecasts, 2018-2027 (USD Billion)
TABLE 14. Global Data center construction market by segment, estimates & forecasts, 2018-2027 (USD Billion)
TABLE 15. Global Data center construction market by region, estimates & forecasts, 2018-2027 (USD Billion)
TABLE 16. Global Data center construction market by segment, estimates & forecasts, 2018-2027 (USD Billion)
TABLE 17. Global Data center construction market by region, estimates & forecasts, 2018-2027 (USD Billion)
TABLE 18. Global Data center construction market by segment, estimates & forecasts, 2018-2027 (USD Billion)
TABLE 19. Global Data center construction market by region, estimates & forecasts, 2018-2027 (USD Billion)
TABLE 20. Global Data center construction market by segment, estimates & forecasts, 2018-2027 (USD Billion)
TABLE 21. Global Data center construction market by region, estimates & forecasts, 2018-2027 (USD Billion)
TABLE 22. U.S. Data center construction market estimates & forecasts, 2018-2027 (USD Billion)
TABLE 23. U.S. Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 24. U.S. Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 25. Canada Data center construction market estimates & forecasts, 2018-2027 (USD Billion)
TABLE 26. Canada Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 27. Canada Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 28. UK Data center construction market estimates & forecasts, 2018-2027 (USD Billion)
TABLE 29. UK Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 30. UK Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 31. Germany Data center construction market estimates & forecasts, 2018-2027 (USD Billion)
TABLE 32. Germany Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 33. Germany Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 34. France Data center construction market estimates & forecasts, 2018-2027 (USD Billion)
TABLE 35. France Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 36. France Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 37. Spain Data center construction market estimates & forecasts, 2018-2027 (USD Billion)
TABLE 38. Spain Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 39. Spain Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 40. Italy Data center construction market estimates & forecasts, 2018-2027 (USD Billion)
TABLE 41. Italy Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 42. Italy Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 43. ROE Data center construction market estimates & forecasts, 2018-2027 (USD Billion)
TABLE 44. ROE Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 45. ROE Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 46. China Data center construction market estimates & forecasts, 2018-2027 (USD Billion)
TABLE 47. China Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 48. China Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 49. India Data center construction market estimates & forecasts, 2018-2027 (USD Billion)
TABLE 50. India Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 51. India Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 52. Japan Data center construction market estimates & forecasts, 2018-2027 (USD Billion)
TABLE 53. Japan Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 54. Japan Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 55. Australia Data center construction market estimates & forecasts, 2018-2027 (USD Billion)
TABLE 56. Australia Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 57. Australia Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 58. South Korea Data center construction market estimates & forecasts, 2018-2027 (USD Billion)
TABLE 59. South Korea Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 60. South Korea Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 61. ROPAC Data center construction market estimates & forecasts, 2018-2027 (USD Billion)
TABLE 62. ROPAC Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 63. ROPAC Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 64. Brazil Data center construction market estimates & forecasts, 2018-2027 (USD Billion)
TABLE 65. Brazil Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 66. Brazil Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 67. Mexico Data center construction market estimates & forecasts, 2018-2027 (USD Billion)
TABLE 68. Mexico Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 69. Mexico Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 70. ROLA Data center construction market estimates & forecasts, 2018-2027 (USD Billion)
TABLE 71. ROLA Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 72. ROLA Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 73. ROW Data center construction market estimates & forecasts, 2018-2027 (USD Billion)
TABLE 74. ROW Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 75. ROW Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 76. List of secondary IT Infrastructures used in the study of global Data center construction market.
TABLE 77. List of primary IT Infrastructures used in the study of global Data center construction market.
TABLE 78. Years considered for the study.
TABLE 79. Exchange rates considered.
List of Tables
TABLE 1. Global Data center construction market, report scope
TABLE 2. Global Data center construction market estimates & forecasts by region 2018-2027 (USD Billion)
TABLE 3. Global Data center construction market estimates & forecasts by IT Infrastructure 2018-2027 (USD Billion)
TABLE 4. Global Data center construction market estimates & forecasts by Tier Type 2018-2027 (USD Billion)
TABLE 5. Global Data center construction market estimates & forecasts by End user 2018-2027 (USD Billion)
TABLE 6. Global Data center construction market by segment, estimates & forecasts, 2018-2027 (USD Billion)
TABLE 7. Global Data center construction market by region, estimates & forecasts, 2018-2027 (USD Billion)
TABLE 8. Global Data center construction market by segment, estimates & forecasts, 2018-2027 (USD Billion)
TABLE 9. Global Data center construction market by region, estimates & forecasts, 2018-2027 (USD Billion)
TABLE 10. Global Data center construction market by segment, estimates & forecasts, 2018-2027 (USD Billion)
TABLE 11. Global Data center construction market by region, estimates & forecasts, 2018-2027 (USD Billion)
TABLE 12. Global Data center construction market by segment, estimates & forecasts, 2018-2027 (USD Billion)
TABLE 13. Global Data center construction market by region, estimates & forecasts, 2018-2027 (USD Billion)
TABLE 14. Global Data center construction market by segment, estimates & forecasts, 2018-2027 (USD Billion)
TABLE 15. Global Data center construction market by region, estimates & forecasts, 2018-2027 (USD Billion)
TABLE 16. Global Data center construction market by segment, estimates & forecasts, 2018-2027 (USD Billion)
TABLE 17. Global Data center construction market by region, estimates & forecasts, 2018-2027 (USD Billion)
TABLE 18. Global Data center construction market by segment, estimates & forecasts, 2018-2027 (USD Billion)
TABLE 19. Global Data center construction market by region, estimates & forecasts, 2018-2027 (USD Billion)
TABLE 20. Global Data center construction market by segment, estimates & forecasts, 2018-2027 (USD Billion)
TABLE 21. Global Data center construction market by region, estimates & forecasts, 2018-2027 (USD Billion)
TABLE 22. U.S. Data center construction market estimates & forecasts, 2018-2027 (USD Billion)
TABLE 23. U.S. Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 24. U.S. Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 25. Canada Data center construction market estimates & forecasts, 2018-2027 (USD Billion)
TABLE 26. Canada Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 27. Canada Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 28. UK Data center construction market estimates & forecasts, 2018-2027 (USD Billion)
TABLE 29. UK Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 30. UK Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 31. Germany Data center construction market estimates & forecasts, 2018-2027 (USD Billion)
TABLE 32. Germany Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 33. Germany Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 34. France Data center construction market estimates & forecasts, 2018-2027 (USD Billion)
TABLE 35. France Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 36. France Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 37. Spain Data center construction market estimates & forecasts, 2018-2027 (USD Billion)
TABLE 38. Spain Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 39. Spain Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 40. Italy Data center construction market estimates & forecasts, 2018-2027 (USD Billion)
TABLE 41. Italy Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 42. Italy Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 43. ROE Data center construction market estimates & forecasts, 2018-2027 (USD Billion)
TABLE 44. ROE Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 45. ROE Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 46. China Data center construction market estimates & forecasts, 2018-2027 (USD Billion)
TABLE 47. China Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 48. China Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 49. India Data center construction market estimates & forecasts, 2018-2027 (USD Billion)
TABLE 50. India Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 51. India Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 52. Japan Data center construction market estimates & forecasts, 2018-2027 (USD Billion)
TABLE 53. Japan Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 54. Japan Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 55. Australia Data center construction market estimates & forecasts, 2018-2027 (USD Billion)
TABLE 56. Australia Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 57. Australia Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 58. South Korea Data center construction market estimates & forecasts, 2018-2027 (USD Billion)
TABLE 59. South Korea Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 60. South Korea Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 61. ROPAC Data center construction market estimates & forecasts, 2018-2027 (USD Billion)
TABLE 62. ROPAC Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 63. ROPAC Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 64. Brazil Data center construction market estimates & forecasts, 2018-2027 (USD Billion)
TABLE 65. Brazil Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 66. Brazil Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 67. Mexico Data center construction market estimates & forecasts, 2018-2027 (USD Billion)
TABLE 68. Mexico Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 69. Mexico Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 70. ROLA Data center construction market estimates & forecasts, 2018-2027 (USD Billion)
TABLE 71. ROLA Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 72. ROLA Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 73. ROW Data center construction market estimates & forecasts, 2018-2027 (USD Billion)
TABLE 74. ROW Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 75. ROW Data center construction market estimates & forecasts by segment 2018-2027 (USD Billion)
TABLE 76. List of secondary IT Infrastructures used in the study of global Data center construction market.
TABLE 77. List of primary IT Infrastructures used in the study of global Data center construction market.
TABLE 78. Years considered for the study.
TABLE 79. Exchange rates considered.
LIST OF FIGURES
FIG 1. Global Data center construction market, research methodology
FIG 2. Global Data center construction market, market estimation techniques
FIG 3. Global market size estimates & forecast methods
FIG 4. Global Data center construction market, key trends 2019
FIG 5. Global Data center construction market, growth prospects 2020-2027
FIG 6. Global Data center construction market, porters 5 force model
FIG 7. Global Data center construction market, pest analysis
FIG 8. Global Data center construction market, value chain analysis
FIG 9. Global Data center construction market by segment, 2018 & 2027 (USD Billion)
FIG 10. Global Data center construction market by segment, 2018 & 2027 (USD Billion)
FIG 11. Global Data center construction market by segment, 2018 & 2027 (USD Billion)
FIG 12. Global Data center construction market by segment, 2018 & 2027 (USD Billion)
FIG 13. Global Data center construction market by segment, 2018 & 2027 (USD Billion)
FIG 14. Global Data center construction market by segment, 2018 & 2027 (USD Billion)
FIG 15. Global Data center construction market by segment, 2018 & 2027 (USD Billion)
FIG 16. Global Data center construction market by segment, 2018 & 2027 (USD Billion)
FIG 17. Global Data center construction market, regional snapshot 2018 & 2027
FIG 18. North America Data center construction market 2018 & 2027 (USD Billion)
FIG 19. Europe Data center construction market 2018 & 2027 (USD Billion)
FIG 20. Asia-Pacific Data center construction market 2018 & 2027 (USD Billion)
FIG 21. Latin America Data center construction market 2018 & 2027 (USD Billion)
FIG 22. Global Data center construction market, company market share analysis (2019)
FIG 1. Global Data center construction market, research methodology
FIG 2. Global Data center construction market, market estimation techniques
FIG 3. Global market size estimates & forecast methods
FIG 4. Global Data center construction market, key trends 2019
FIG 5. Global Data center construction market, growth prospects 2020-2027
FIG 6. Global Data center construction market, porters 5 force model
FIG 7. Global Data center construction market, pest analysis
FIG 8. Global Data center construction market, value chain analysis
FIG 9. Global Data center construction market by segment, 2018 & 2027 (USD Billion)
FIG 10. Global Data center construction market by segment, 2018 & 2027 (USD Billion)
FIG 11. Global Data center construction market by segment, 2018 & 2027 (USD Billion)
FIG 12. Global Data center construction market by segment, 2018 & 2027 (USD Billion)
FIG 13. Global Data center construction market by segment, 2018 & 2027 (USD Billion)
FIG 14. Global Data center construction market by segment, 2018 & 2027 (USD Billion)
FIG 15. Global Data center construction market by segment, 2018 & 2027 (USD Billion)
FIG 16. Global Data center construction market by segment, 2018 & 2027 (USD Billion)
FIG 17. Global Data center construction market, regional snapshot 2018 & 2027
FIG 18. North America Data center construction market 2018 & 2027 (USD Billion)
FIG 19. Europe Data center construction market 2018 & 2027 (USD Billion)
FIG 20. Asia-Pacific Data center construction market 2018 & 2027 (USD Billion)
FIG 21. Latin America Data center construction market 2018 & 2027 (USD Billion)
FIG 22. Global Data center construction market, company market share analysis (2019)