Global Data Center Construction Solution Market Growth (Status and Outlook) 2026-2032

May 2026 | 168 pages | ID: GC50A403B798EN
LP Information

US$ 3,660.00

E-mail Delivery (PDF)

Download PDF Leaflet

Accepted cards
Wire Transfer
Checkout Later
Need Help? Ask a Question
The global Data Center Construction Solution market size is predicted to grow from US$ 35460 million in 2025 to US$ 66350 million in 2032; it is expected to grow at a CAGR of 9.5% from 2026 to 2032.

Nordic countries are deploying 5G rapidly, driving investments in data centers, especially edge data centers. Various countries are providing tax incentives for investors based locally or even globally, which will aid in constructing data centers.

LPI (LP Information)' newest research report, the ?Data Center Construction Solution Industry Forecast? looks at past sales and reviews total world Data Center Construction Solution sales in 2025, providing a comprehensive analysis by region and market sector of projected Data Center Construction Solution sales for 2026 through 2032. With Data Center Construction Solution sales broken down by region, market sector and sub-sector, this report provides a detailed analysis in US$ millions of the world Data Center Construction Solution industry.

This Insight Report provides a comprehensive analysis of the global Data Center Construction Solution landscape and highlights key trends related to product segmentation, company formation, revenue, and market share, latest development, and M&A activity. This report also analyses the strategies of leading global companies with a focus on Data Center Construction Solution portfolios and capabilities, market entry strategies, market positions, and geographic footprints, to better understand these firms? unique position in an accelerating global Data Center Construction Solution market.

This Insight Report evaluates the key market trends, drivers, and affecting factors shaping the global outlook for Data Center Construction Solution and breaks down the forecast by Type, by Application, geography, and market size to highlight emerging pockets of opportunity. With a transparent methodology based on hundreds of bottom-up qualitative and quantitative market inputs, this study forecast offers a highly nuanced view of the current state and future trajectory in the global Data Center Construction Solution.

This report presents a comprehensive overview, market shares, and growth opportunities of Data Center Construction Solution market by product type, application, key players and key regions and countries.

Segmentation by Type:
  • Electrical Infrastructure
  • Mechanical Infrastructure
  • General Construction
Segmentation by Application:
  • Hyperscale Data Centers
  • Enterprise Data Centers
  • Colocation Data Centers
This report also splits the market by region:
  • Americas
    • United States
    • Canada
    • Mexico
    • Brazil
  • APAC
    • China
    • Japan
    • Korea
    • Southeast Asia
    • India
    • Australia
  • Europe
    • Germany
    • France
    • UK
    • Italy
    • Russia
  • Middle East & Africa
    • Egypt
    • South Africa
    • Israel
    • Turkey
    • GCC Countries
The below companies that are profiled have been selected based on inputs gathered from primary experts and analyzing the company's coverage, product portfolio, its market penetration.
  • Whiting-Turner Contracting
  • Arup
  • Coromatic
  • Turner Construction
  • Caverion
  • COWI
  • Designer Group
  • RED
  • Dornan
  • Holder Construction
  • DPR Construction
  • Fortis Construction
  • Gottlieb Paludan Architects
  • Granlund Group
  • MT Hojgaard
  • Mace Group
  • ISG
  • HITT Contracting
  • STO Building Group (formerly Structure Tone)
  • JE Dunn Construction
  • Hensel Phelps
  • AECOM
  • Rogers-O'Brien Construction
  • Clune Construction
  • Gilbane
  • Balfour Beatty US
  • Mortenson Construction
  • Sweco
  • Mercury
  • Ramboll Group
1 SCOPE OF THE REPORT

1.1 Market Introduction
1.2 Years Considered
1.3 Research Objectives
1.4 Market Research Methodology
1.5 Research Process and Data Source
1.6 Economic Indicators
1.7 Currency Considered
1.8 Market Estimation Caveats

2 EXECUTIVE SUMMARY

2.1 World Market Overview
  2.1.1 Global Data Center Construction Solution Market Size (2021-2032)
  2.1.2 Data Center Construction Solution Market Size CAGR by Region (2021 VS 2025 VS 2032)
  2.1.3 World Current & Future Analysis for Data Center Construction Solution by Country/Region (2021, 2025 & 2032)
2.2 Data Center Construction Solution Segment by Type
  2.2.1 Electrical Infrastructure
  2.2.2 Mechanical Infrastructure
  2.2.3 General Construction
  2.2.4 Data Center Construction Solution Market Size by Type
    2.2.4.1 Data Center Construction Solution Market Size CAGR by Type (2021 VS 2025 VS 2032)
    2.2.4.2 Global Data Center Construction Solution Market Size Market Share by Type (2021-2026)
2.3 Data Center Construction Solution Segment by Application
  2.3.1 Hyperscale Data Centers
  2.3.2 Enterprise Data Centers
  2.3.3 Colocation Data Centers
  2.3.4 Data Center Construction Solution Market Size by Application
    2.3.4.1 Data Center Construction Solution Market Size CAGR by Application (2021 VS 2025 VS 2032)
    2.3.4.2 Global Data Center Construction Solution Market Size Market Share by Application (2021-2026)

3 DATA CENTER CONSTRUCTION SOLUTION MARKET SIZE BY PLAYER

3.1 Data Center Construction Solution Market Size Market Share by Player
  3.1.1 Global Data Center Construction Solution Revenue by Player (2021-2026)
  3.1.2 Global Data Center Construction Solution Revenue Market Share by Player (2021-2026)
3.2 Global Data Center Construction Solution Key Players Head office and Products Offered
3.3 Market Concentration Rate Analysis
  3.3.1 Competition Landscape Analysis
  3.3.2 Concentration Ratio (CR3, CR5 and CR10) & (2024-2026)
3.4 New Products and Potential Entrants
3.5 Mergers & Acquisitions, Expansion

4 DATA CENTER CONSTRUCTION SOLUTION BY REGION

4.1 Data Center Construction Solution Market Size by Region (2021-2026)
4.2 Global Data Center Construction Solution Annual Revenue by Country/Region (2021-2026)
4.3 Americas Data Center Construction Solution Market Size Growth (2021-2026)
4.4 APAC Data Center Construction Solution Market Size Growth (2021-2026)
4.5 Europe Data Center Construction Solution Market Size Growth (2021-2026)
4.6 Middle East & Africa Data Center Construction Solution Market Size Growth (2021-2026)

5 AMERICAS

5.1 Americas Data Center Construction Solution Market Size by Country (2021-2026)
5.2 Americas Data Center Construction Solution Market Size by Type (2021-2026)
5.3 Americas Data Center Construction Solution Market Size by Application (2021-2026)
5.4 United States
5.5 Canada
5.6 Mexico
5.7 Brazil

6 APAC

6.1 APAC Data Center Construction Solution Market Size by Region (2021-2026)
6.2 APAC Data Center Construction Solution Market Size by Type (2021-2026)
6.3 APAC Data Center Construction Solution Market Size by Application (2021-2026)
6.4 China
6.5 Japan
6.6 South Korea
6.7 Southeast Asia
6.8 India
6.9 Australia

7 EUROPE

7.1 Europe Data Center Construction Solution Market Size by Country (2021-2026)
7.2 Europe Data Center Construction Solution Market Size by Type (2021-2026)
7.3 Europe Data Center Construction Solution Market Size by Application (2021-2026)
7.4 Germany
7.5 France
7.6 UK
7.7 Italy
7.8 Russia

8 MIDDLE EAST & AFRICA

8.1 Middle East & Africa Data Center Construction Solution by Region (2021-2026)
8.2 Middle East & Africa Data Center Construction Solution Market Size by Type (2021-2026)
8.3 Middle East & Africa Data Center Construction Solution Market Size by Application (2021-2026)
8.4 Egypt
8.5 South Africa
8.6 Israel
8.7 Turkey
8.8 GCC Countries

9 MARKET DRIVERS, CHALLENGES AND TRENDS

9.1 Market Drivers & Growth Opportunities
9.2 Market Challenges & Risks
9.3 Industry Trends

10 GLOBAL DATA CENTER CONSTRUCTION SOLUTION MARKET FORECAST

10.1 Global Data Center Construction Solution Forecast by Region (2027-2032)
  10.1.1 Global Data Center Construction Solution Forecast by Region (2027-2032)
  10.1.2 Americas Data Center Construction Solution Forecast
  10.1.3 APAC Data Center Construction Solution Forecast
  10.1.4 Europe Data Center Construction Solution Forecast
  10.1.5 Middle East & Africa Data Center Construction Solution Forecast
10.2 Americas Data Center Construction Solution Forecast by Country (2027-2032)
  10.2.1 United States Market Data Center Construction Solution Forecast
  10.2.2 Canada Market Data Center Construction Solution Forecast
  10.2.3 Mexico Market Data Center Construction Solution Forecast
  10.2.4 Brazil Market Data Center Construction Solution Forecast
10.3 APAC Data Center Construction Solution Forecast by Region (2027-2032)
  10.3.1 China Data Center Construction Solution Market Forecast
  10.3.2 Japan Market Data Center Construction Solution Forecast
  10.3.3 Korea Market Data Center Construction Solution Forecast
  10.3.4 Southeast Asia Market Data Center Construction Solution Forecast
  10.3.5 India Market Data Center Construction Solution Forecast
  10.3.6 Australia Market Data Center Construction Solution Forecast
10.4 Europe Data Center Construction Solution Forecast by Country (2027-2032)
  10.4.1 Germany Market Data Center Construction Solution Forecast
  10.4.2 France Market Data Center Construction Solution Forecast
  10.4.3 UK Market Data Center Construction Solution Forecast
  10.4.4 Italy Market Data Center Construction Solution Forecast
  10.4.5 Russia Market Data Center Construction Solution Forecast
10.5 Middle East & Africa Data Center Construction Solution Forecast by Region (2027-2032)
  10.5.1 Egypt Market Data Center Construction Solution Forecast
  10.5.2 South Africa Market Data Center Construction Solution Forecast
  10.5.3 Israel Market Data Center Construction Solution Forecast
  10.5.4 Turkey Market Data Center Construction Solution Forecast
10.6 Global Data Center Construction Solution Forecast by Type (2027-2032)
10.7 Global Data Center Construction Solution Forecast by Application (2027-2032)
  10.7.1 GCC Countries Market Data Center Construction Solution Forecast

11 KEY PLAYERS ANALYSIS

11.1 Whiting-Turner Contracting
  11.1.1 Whiting-Turner Contracting Company Information
  11.1.2 Whiting-Turner Contracting Data Center Construction Solution Product Offered
  11.1.3 Whiting-Turner Contracting Data Center Construction Solution Revenue, Gross Margin and Market Share (2021-2026)
  11.1.4 Whiting-Turner Contracting Main Business Overview
  11.1.5 Whiting-Turner Contracting Latest Developments
11.2 Arup
  11.2.1 Arup Company Information
  11.2.2 Arup Data Center Construction Solution Product Offered
  11.2.3 Arup Data Center Construction Solution Revenue, Gross Margin and Market Share (2021-2026)
  11.2.4 Arup Main Business Overview
  11.2.5 Arup Latest Developments
11.3 Coromatic
  11.3.1 Coromatic Company Information
  11.3.2 Coromatic Data Center Construction Solution Product Offered
  11.3.3 Coromatic Data Center Construction Solution Revenue, Gross Margin and Market Share (2021-2026)
  11.3.4 Coromatic Main Business Overview
  11.3.5 Coromatic Latest Developments
11.4 Turner Construction
  11.4.1 Turner Construction Company Information
  11.4.2 Turner Construction Data Center Construction Solution Product Offered
  11.4.3 Turner Construction Data Center Construction Solution Revenue, Gross Margin and Market Share (2021-2026)
  11.4.4 Turner Construction Main Business Overview
  11.4.5 Turner Construction Latest Developments
11.5 Caverion
  11.5.1 Caverion Company Information
  11.5.2 Caverion Data Center Construction Solution Product Offered
  11.5.3 Caverion Data Center Construction Solution Revenue, Gross Margin and Market Share (2021-2026)
  11.5.4 Caverion Main Business Overview
  11.5.5 Caverion Latest Developments
11.6 COWI
  11.6.1 COWI Company Information
  11.6.2 COWI Data Center Construction Solution Product Offered
  11.6.3 COWI Data Center Construction Solution Revenue, Gross Margin and Market Share (2021-2026)
  11.6.4 COWI Main Business Overview
  11.6.5 COWI Latest Developments
11.7 Designer Group
  11.7.1 Designer Group Company Information
  11.7.2 Designer Group Data Center Construction Solution Product Offered
  11.7.3 Designer Group Data Center Construction Solution Revenue, Gross Margin and Market Share (2021-2026)
  11.7.4 Designer Group Main Business Overview
  11.7.5 Designer Group Latest Developments
11.8 RED
  11.8.1 RED Company Information
  11.8.2 RED Data Center Construction Solution Product Offered
  11.8.3 RED Data Center Construction Solution Revenue, Gross Margin and Market Share (2021-2026)
  11.8.4 RED Main Business Overview
  11.8.5 RED Latest Developments
11.9 Dornan
  11.9.1 Dornan Company Information
  11.9.2 Dornan Data Center Construction Solution Product Offered
  11.9.3 Dornan Data Center Construction Solution Revenue, Gross Margin and Market Share (2021-2026)
  11.9.4 Dornan Main Business Overview
  11.9.5 Dornan Latest Developments
11.10 Holder Construction
  11.10.1 Holder Construction Company Information
  11.10.2 Holder Construction Data Center Construction Solution Product Offered
  11.10.3 Holder Construction Data Center Construction Solution Revenue, Gross Margin and Market Share (2021-2026)
  11.10.4 Holder Construction Main Business Overview
  11.10.5 Holder Construction Latest Developments
11.11 DPR Construction
  11.11.1 DPR Construction Company Information
  11.11.2 DPR Construction Data Center Construction Solution Product Offered
  11.11.3 DPR Construction Data Center Construction Solution Revenue, Gross Margin and Market Share (2021-2026)
  11.11.4 DPR Construction Main Business Overview
  11.11.5 DPR Construction Latest Developments
11.12 Fortis Construction
  11.12.1 Fortis Construction Company Information
  11.12.2 Fortis Construction Data Center Construction Solution Product Offered
  11.12.3 Fortis Construction Data Center Construction Solution Revenue, Gross Margin and Market Share (2021-2026)
  11.12.4 Fortis Construction Main Business Overview
  11.12.5 Fortis Construction Latest Developments
11.13 Gottlieb Paludan Architects
  11.13.1 Gottlieb Paludan Architects Company Information
  11.13.2 Gottlieb Paludan Architects Data Center Construction Solution Product Offered
  11.13.3 Gottlieb Paludan Architects Data Center Construction Solution Revenue, Gross Margin and Market Share (2021-2026)
  11.13.4 Gottlieb Paludan Architects Main Business Overview
  11.13.5 Gottlieb Paludan Architects Latest Developments
11.14 Granlund Group
  11.14.1 Granlund Group Company Information
  11.14.2 Granlund Group Data Center Construction Solution Product Offered
  11.14.3 Granlund Group Data Center Construction Solution Revenue, Gross Margin and Market Share (2021-2026)
  11.14.4 Granlund Group Main Business Overview
  11.14.5 Granlund Group Latest Developments
11.15 MT Hojgaard
  11.15.1 MT Hojgaard Company Information
  11.15.2 MT Hojgaard Data Center Construction Solution Product Offered
  11.15.3 MT Hojgaard Data Center Construction Solution Revenue, Gross Margin and Market Share (2021-2026)
  11.15.4 MT Hojgaard Main Business Overview
  11.15.5 MT Hojgaard Latest Developments
11.16 Mace Group
  11.16.1 Mace Group Company Information
  11.16.2 Mace Group Data Center Construction Solution Product Offered
  11.16.3 Mace Group Data Center Construction Solution Revenue, Gross Margin and Market Share (2021-2026)
  11.16.4 Mace Group Main Business Overview
  11.16.5 Mace Group Latest Developments
11.17 ISG
  11.17.1 ISG Company Information
  11.17.2 ISG Data Center Construction Solution Product Offered
  11.17.3 ISG Data Center Construction Solution Revenue, Gross Margin and Market Share (2021-2026)
  11.17.4 ISG Main Business Overview
  11.17.5 ISG Latest Developments
11.18 HITT Contracting
  11.18.1 HITT Contracting Company Information
  11.18.2 HITT Contracting Data Center Construction Solution Product Offered
  11.18.3 HITT Contracting Data Center Construction Solution Revenue, Gross Margin and Market Share (2021-2026)
  11.18.4 HITT Contracting Main Business Overview
  11.18.5 HITT Contracting Latest Developments
11.19 STO Building Group (formerly Structure Tone)
  11.19.1 STO Building Group (formerly Structure Tone) Company Information
  11.19.2 STO Building Group (formerly Structure Tone) Data Center Construction Solution Product Offered
  11.19.3 STO Building Group (formerly Structure Tone) Data Center Construction Solution Revenue, Gross Margin and Market Share (2021-2026)
  11.19.4 STO Building Group (formerly Structure Tone) Main Business Overview
  11.19.5 STO Building Group (formerly Structure Tone) Latest Developments
11.20 JE Dunn Construction
  11.20.1 JE Dunn Construction Company Information
  11.20.2 JE Dunn Construction Data Center Construction Solution Product Offered
  11.20.3 JE Dunn Construction Data Center Construction Solution Revenue, Gross Margin and Market Share (2021-2026)
  11.20.4 JE Dunn Construction Main Business Overview
  11.20.5 JE Dunn Construction Latest Developments
11.21 Hensel Phelps
  11.21.1 Hensel Phelps Company Information
  11.21.2 Hensel Phelps Data Center Construction Solution Product Offered
  11.21.3 Hensel Phelps Data Center Construction Solution Revenue, Gross Margin and Market Share (2021-2026)
  11.21.4 Hensel Phelps Main Business Overview
  11.21.5 Hensel Phelps Latest Developments
11.22 AECOM
  11.22.1 AECOM Company Information
  11.22.2 AECOM Data Center Construction Solution Product Offered
  11.22.3 AECOM Data Center Construction Solution Revenue, Gross Margin and Market Share (2021-2026)
  11.22.4 AECOM Main Business Overview
  11.22.5 AECOM Latest Developments
11.23 Rogers-O'Brien Construction
  11.23.1 Rogers-O'Brien Construction Company Information
  11.23.2 Rogers-O'Brien Construction Data Center Construction Solution Product Offered
  11.23.3 Rogers-O'Brien Construction Data Center Construction Solution Revenue, Gross Margin and Market Share (2021-2026)
  11.23.4 Rogers-O'Brien Construction Main Business Overview
  11.23.5 Rogers-O'Brien Construction Latest Developments
11.24 Clune Construction
  11.24.1 Clune Construction Company Information
  11.24.2 Clune Construction Data Center Construction Solution Product Offered
  11.24.3 Clune Construction Data Center Construction Solution Revenue, Gross Margin and Market Share (2021-2026)
  11.24.4 Clune Construction Main Business Overview
  11.24.5 Clune Construction Latest Developments
11.25 Gilbane
  11.25.1 Gilbane Company Information
  11.25.2 Gilbane Data Center Construction Solution Product Offered
  11.25.3 Gilbane Data Center Construction Solution Revenue, Gross Margin and Market Share (2021-2026)
  11.25.4 Gilbane Main Business Overview
  11.25.5 Gilbane Latest Developments
11.26 Balfour Beatty US
  11.26.1 Balfour Beatty US Company Information
  11.26.2 Balfour Beatty US Data Center Construction Solution Product Offered
  11.26.3 Balfour Beatty US Data Center Construction Solution Revenue, Gross Margin and Market Share (2021-2026)
  11.26.4 Balfour Beatty US Main Business Overview
  11.26.5 Balfour Beatty US Latest Developments
11.27 Mortenson Construction
  11.27.1 Mortenson Construction Company Information
  11.27.2 Mortenson Construction Data Center Construction Solution Product Offered
  11.27.3 Mortenson Construction Data Center Construction Solution Revenue, Gross Margin and Market Share (2021-2026)
  11.27.4 Mortenson Construction Main Business Overview
  11.27.5 Mortenson Construction Latest Developments
11.28 Sweco
  11.28.1 Sweco Company Information
  11.28.2 Sweco Data Center Construction Solution Product Offered
  11.28.3 Sweco Data Center Construction Solution Revenue, Gross Margin and Market Share (2021-2026)
  11.28.4 Sweco Main Business Overview
  11.28.5 Sweco Latest Developments
11.29 Mercury
  11.29.1 Mercury Company Information
  11.29.2 Mercury Data Center Construction Solution Product Offered
  11.29.3 Mercury Data Center Construction Solution Revenue, Gross Margin and Market Share (2021-2026)
  11.29.4 Mercury Main Business Overview
  11.29.5 Mercury Latest Developments
11.30 Ramboll Group
  11.30.1 Ramboll Group Company Information
  11.30.2 Ramboll Group Data Center Construction Solution Product Offered
  11.30.3 Ramboll Group Data Center Construction Solution Revenue, Gross Margin and Market Share (2021-2026)
  11.30.4 Ramboll Group Main Business Overview
  11.30.5 Ramboll Group Latest Developments

12 RESEARCH FINDINGS AND CONCLUSION



LIST OF TABLES

Table 1. Data Center Construction Solution Market Size CAGR by Region (2021 VS 2025 VS 2032) & ($ millions)
Table 2. Data Center Construction Solution Annual Sales CAGR by Country/Region (2021, 2025 & 2032) & ($ millions)
Table 3. Major Players of Electrical Infrastructure
Table 4. Major Players of Mechanical Infrastructure
Table 5. Major Players of General Construction
Table 6. Data Center Construction Solution Market Size CAGR by Type (2021 VS 2025 VS 2032) & ($ millions)
Table 7. Global Data Center Construction Solution Market Size by Type (2021-2026) & ($ millions)
Table 8. Global Data Center Construction Solution Market Size Market Share by Type (2021-2026)
Table 9. Data Center Construction Solution Market Size CAGR by Application (2021 VS 2025 VS 2032) & ($ millions)
Table 10. Global Data Center Construction Solution Market Size by Application (2021-2026) & ($ millions)
Table 11. Global Data Center Construction Solution Market Size Market Share by Application (2021-2026)
Table 12. Global Data Center Construction Solution Revenue by Player (2021-2026) & ($ millions)
Table 13. Global Data Center Construction Solution Revenue Market Share by Player (2021-2026)
Table 14. Data Center Construction Solution Key Players Head office and Products Offered
Table 15. Data Center Construction Solution Concentration Ratio (CR3, CR5 and CR10) & (2024-2026)
Table 16. New Products and Potential Entrants
Table 17. Mergers & Acquisitions, Expansion
Table 18. Global Data Center Construction Solution Market Size by Region (2021-2026) & ($ millions)
Table 19. Global Data Center Construction Solution Market Size Market Share by Region (2021-2026)
Table 20. Global Data Center Construction Solution Revenue by Country/Region (2021-2026) & ($ millions)
Table 21. Global Data Center Construction Solution Revenue Market Share by Country/Region (2021-2026)
Table 22. Americas Data Center Construction Solution Market Size by Country (2021-2026) & ($ millions)
Table 23. Americas Data Center Construction Solution Market Size Market Share by Country (2021-2026)
Table 24. Americas Data Center Construction Solution Market Size by Type (2021-2026) & ($ millions)
Table 25. Americas Data Center Construction Solution Market Size Market Share by Type (2021-2026)
Table 26. Americas Data Center Construction Solution Market Size by Application (2021-2026) & ($ millions)
Table 27. Americas Data Center Construction Solution Market Size Market Share by Application (2021-2026)
Table 28. APAC Data Center Construction Solution Market Size by Region (2021-2026) & ($ millions)
Table 29. APAC Data Center Construction Solution Market Size Market Share by Region (2021-2026)
Table 30. APAC Data Center Construction Solution Market Size by Type (2021-2026) & ($ millions)
Table 31. APAC Data Center Construction Solution Market Size by Application (2021-2026) & ($ millions)
Table 32. Europe Data Center Construction Solution Market Size by Country (2021-2026) & ($ millions)
Table 33. Europe Data Center Construction Solution Market Size Market Share by Country (2021-2026)
Table 34. Europe Data Center Construction Solution Market Size by Type (2021-2026) & ($ millions)
Table 35. Europe Data Center Construction Solution Market Size by Application (2021-2026) & ($ millions)
Table 36. Middle East & Africa Data Center Construction Solution Market Size by Region (2021-2026) & ($ millions)
Table 37. Middle East & Africa Data Center Construction Solution Market Size by Type (2021-2026) & ($ millions)
Table 38. Middle East & Africa Data Center Construction Solution Market Size by Application (2021-2026) & ($ millions)
Table 39. Key Market Drivers & Growth Opportunities of Data Center Construction Solution
Table 40. Key Market Challenges & Risks of Data Center Construction Solution
Table 41. Key Industry Trends of Data Center Construction Solution
Table 42. Global Data Center Construction Solution Market Size Forecast by Region (2027-2032) & ($ millions)
Table 43. Global Data Center Construction Solution Market Size Market Share Forecast by Region (2027-2032)
Table 44. Global Data Center Construction Solution Market Size Forecast by Type (2027-2032) & ($ millions)
Table 45. Global Data Center Construction Solution Market Size Forecast by Application (2027-2032) & ($ millions)
Table 46. Whiting-Turner Contracting Details, Company Type, Data Center Construction Solution Area Served and Its Competitors
Table 47. Whiting-Turner Contracting Data Center Construction Solution Product Offered
Table 48. Whiting-Turner Contracting Data Center Construction Solution Revenue ($ million), Gross Margin and Market Share (2021-2026)
Table 49. Whiting-Turner Contracting Main Business
Table 50. Whiting-Turner Contracting Latest Developments
Table 51. Arup Details, Company Type, Data Center Construction Solution Area Served and Its Competitors
Table 52. Arup Data Center Construction Solution Product Offered
Table 53. Arup Data Center Construction Solution Revenue ($ million), Gross Margin and Market Share (2021-2026)
Table 54. Arup Main Business
Table 55. Arup Latest Developments
Table 56. Coromatic Details, Company Type, Data Center Construction Solution Area Served and Its Competitors
Table 57. Coromatic Data Center Construction Solution Product Offered
Table 58. Coromatic Data Center Construction Solution Revenue ($ million), Gross Margin and Market Share (2021-2026)
Table 59. Coromatic Main Business
Table 60. Coromatic Latest Developments
Table 61. Turner Construction Details, Company Type, Data Center Construction Solution Area Served and Its Competitors
Table 62. Turner Construction Data Center Construction Solution Product Offered
Table 63. Turner Construction Data Center Construction Solution Revenue ($ million), Gross Margin and Market Share (2021-2026)
Table 64. Turner Construction Main Business
Table 65. Turner Construction Latest Developments
Table 66. Caverion Details, Company Type, Data Center Construction Solution Area Served and Its Competitors
Table 67. Caverion Data Center Construction Solution Product Offered
Table 68. Caverion Data Center Construction Solution Revenue ($ million), Gross Margin and Market Share (2021-2026)
Table 69. Caverion Main Business
Table 70. Caverion Latest Developments
Table 71. COWI Details, Company Type, Data Center Construction Solution Area Served and Its Competitors
Table 72. COWI Data Center Construction Solution Product Offered
Table 73. COWI Data Center Construction Solution Revenue ($ million), Gross Margin and Market Share (2021-2026)
Table 74. COWI Main Business
Table 75. COWI Latest Developments
Table 76. Designer Group Details, Company Type, Data Center Construction Solution Area Served and Its Competitors
Table 77. Designer Group Data Center Construction Solution Product Offered
Table 78. Designer Group Data Center Construction Solution Revenue ($ million), Gross Margin and Market Share (2021-2026)
Table 79. Designer Group Main Business
Table 80. Designer Group Latest Developments
Table 81. RED Details, Company Type, Data Center Construction Solution Area Served and Its Competitors
Table 82. RED Data Center Construction Solution Product Offered
Table 83. RED Data Center Construction Solution Revenue ($ million), Gross Margin and Market Share (2021-2026)
Table 84. RED Main Business
Table 85. RED Latest Developments
Table 86. Dornan Details, Company Type, Data Center Construction Solution Area Served and Its Competitors
Table 87. Dornan Data Center Construction Solution Product Offered
Table 88. Dornan Data Center Construction Solution Revenue ($ million), Gross Margin and Market Share (2021-2026)
Table 89. Dornan Main Business
Table 90. Dornan Latest Developments
Table 91. Holder Construction Details, Company Type, Data Center Construction Solution Area Served and Its Competitors
Table 92. Holder Construction Data Center Construction Solution Product Offered
Table 93. Holder Construction Data Center Construction Solution Revenue ($ million), Gross Margin and Market Share (2021-2026)
Table 94. Holder Construction Main Business
Table 95. Holder Construction Latest Developments
Table 96. DPR Construction Details, Company Type, Data Center Construction Solution Area Served and Its Competitors
Table 97. DPR Construction Data Center Construction Solution Product Offered
Table 98. DPR Construction Data Center Construction Solution Revenue ($ million), Gross Margin and Market Share (2021-2026)
Table 99. DPR Construction Main Business
Table 100. DPR Construction Latest Developments
Table 101. Fortis Construction Details, Company Type, Data Center Construction Solution Area Served and Its Competitors
Table 102. Fortis Construction Data Center Construction Solution Product Offered
Table 103. Fortis Construction Data Center Construction Solution Revenue ($ million), Gross Margin and Market Share (2021-2026)
Table 104. Fortis Construction Main Business
Table 105. Fortis Construction Latest Developments
Table 106. Gottlieb Paludan Architects Details, Company Type, Data Center Construction Solution Area Served and Its Competitors
Table 107. Gottlieb Paludan Architects Data Center Construction Solution Product Offered
Table 108. Gottlieb Paludan Architects Data Center Construction Solution Revenue ($ million), Gross Margin and Market Share (2021-2026)
Table 109. Gottlieb Paludan Architects Main Business
Table 110. Gottlieb Paludan Architects Latest Developments
Table 111. Granlund Group Details, Company Type, Data Center Construction Solution Area Served and Its Competitors
Table 112. Granlund Group Data Center Construction Solution Product Offered
Table 113. Granlund Group Data Center Construction Solution Revenue ($ million), Gross Margin and Market Share (2021-2026)
Table 114. Granlund Group Main Business
Table 115. Granlund Group Latest Developments
Table 116. MT Hojgaard Details, Company Type, Data Center Construction Solution Area Served and Its Competitors
Table 117. MT Hojgaard Data Center Construction Solution Product Offered
Table 118. MT Hojgaard Data Center Construction Solution Revenue ($ million), Gross Margin and Market Share (2021-2026)
Table 119. MT Hojgaard Main Business
Table 120. MT Hojgaard Latest Developments
Table 121. Mace Group Details, Company Type, Data Center Construction Solution Area Served and Its Competitors
Table 122. Mace Group Data Center Construction Solution Product Offered
Table 123. Mace Group Data Center Construction Solution Revenue ($ million), Gross Margin and Market Share (2021-2026)
Table 124. Mace Group Main Business
Table 125. Mace Group Latest Developments
Table 126. ISG Details, Company Type, Data Center Construction Solution Area Served and Its Competitors
Table 127. ISG Data Center Construction Solution Product Offered
Table 128. ISG Data Center Construction Solution Revenue ($ million), Gross Margin and Market Share (2021-2026)
Table 129. ISG Main Business
Table 130. ISG Latest Developments
Table 131. HITT Contracting Details, Company Type, Data Center Construction Solution Area Served and Its Competitors
Table 132. HITT Contracting Data Center Construction Solution Product Offered
Table 133. HITT Contracting Data Center Construction Solution Revenue ($ million), Gross Margin and Market Share (2021-2026)
Table 134. HITT Contracting Main Business
Table 135. HITT Contracting Latest Developments
Table 136. STO Building Group (formerly Structure Tone) Details, Company Type, Data Center Construction Solution Area Served and Its Competitors
Table 137. STO Building Group (formerly Structure Tone) Data Center Construction Solution Product Offered
Table 138. STO Building Group (formerly Structure Tone) Data Center Construction Solution Revenue ($ million), Gross Margin and Market Share (2021-2026)
Table 139. STO Building Group (formerly Structure Tone) Main Business
Table 140. STO Building Group (formerly Structure Tone) Latest Developments
Table 141. JE Dunn Construction Details, Company Type, Data Center Construction Solution Area Served and Its Competitors
Table 142. JE Dunn Construction Data Center Construction Solution Product Offered
Table 143. JE Dunn Construction Data Center Construction Solution Revenue ($ million), Gross Margin and Market Share (2021-2026)
Table 144. JE Dunn Construction Main Business
Table 145. JE Dunn Construction Latest Developments
Table 146. Hensel Phelps Details, Company Type, Data Center Construction Solution Area Served and Its Competitors
Table 147. Hensel Phelps Data Center Construction Solution Product Offered
Table 148. Hensel Phelps Data Center Construction Solution Revenue ($ million), Gross Margin and Market Share (2021-2026)
Table 149. Hensel Phelps Main Business
Table 150. Hensel Phelps Latest Developments
Table 151. AECOM Details, Company Type, Data Center Construction Solution Area Served and Its Competitors
Table 152. AECOM Data Center Construction Solution Product Offered
Table 153. AECOM Data Center Construction Solution Revenue ($ million), Gross Margin and Market Share (2021-2026)
Table 154. AECOM Main Business
Table 155. AECOM Latest Developments
Table 156. Rogers-O'Brien Construction Details, Company Type, Data Center Construction Solution Area Served and Its Competitors
Table 157. Rogers-O'Brien Construction Data Center Construction Solution Product Offered
Table 158. Rogers-O'Brien Construction Data Center Construction Solution Revenue ($ million), Gross Margin and Market Share (2021-2026)
Table 159. Rogers-O'Brien Construction Main Business
Table 160. Rogers-O'Brien Construction Latest Developments
Table 161. Clune Construction Details, Company Type, Data Center Construction Solution Area Served and Its Competitors
Table 162. Clune Construction Data Center Construction Solution Product Offered
Table 163. Clune Construction Data Center Construction Solution Revenue ($ million), Gross Margin and Market Share (2021-2026)
Table 164. Clune Construction Main Business
Table 165. Clune Construction Latest Developments
Table 166. Gilbane Details, Company Type, Data Center Construction Solution Area Served and Its Competitors
Table 167. Gilbane Data Center Construction Solution Product Offered
Table 168. Gilbane Data Center Construction Solution Revenue ($ million), Gross Margin and Market Share (2021-2026)
Table 169. Gilbane Main Business
Table 170. Gilbane Latest Developments
Table 171. Balfour Beatty US Details, Company Type, Data Center Construction Solution Area Served and Its Competitors
Table 172. Balfour Beatty US Data Center Construction Solution Product Offered
Table 173. Balfour Beatty US Data Center Construction Solution Revenue ($ million), Gross Margin and Market Share (2021-2026)
Table 174. Balfour Beatty US Main Business
Table 175. Balfour Beatty US Latest Developments
Table 176. Mortenson Construction Details, Company Type, Data Center Construction Solution Area Served and Its Competitors
Table 177. Mortenson Construction Data Center Construction Solution Product Offered
Table 178. Mortenson Construction Data Center Construction Solution Revenue ($ million), Gross Margin and Market Share (2021-2026)
Table 179. Mortenson Construction Main Business
Table 180. Mortenson Construction Latest Developments
Table 181. Sweco Details, Company Type, Data Center Construction Solution Area Served and Its Competitors
Table 182. Sweco Data Center Construction Solution Product Offered
Table 183. Sweco Data Center Construction Solution Revenue ($ million), Gross Margin and Market Share (2021-2026)
Table 184. Sweco Main Business
Table 185. Sweco Latest Developments
Table 186. Mercury Details, Company Type, Data Center Construction Solution Area Served and Its Competitors
Table 187. Mercury Data Center Construction Solution Product Offered
Table 188. Mercury Data Center Construction Solution Revenue ($ million), Gross Margin and Market Share (2021-2026)
Table 189. Mercury Main Business
Table 190. Mercury Latest Developments
Table 191. Ramboll Group Details, Company Type, Data Center Construction Solution Area Served and Its Competitors
Table 192. Ramboll Group Data Center Construction Solution Product Offered
Table 193. Ramboll Group Data Center Construction Solution Revenue ($ million), Gross Margin and Market Share (2021-2026)
Table 194. Ramboll Group Main Business
Table 195. Ramboll Group Latest Developments

LIST OF FIGURES

Figure 1. Data Center Construction Solution Report Years Considered
Figure 2. Research Objectives
Figure 3. Research Methodology
Figure 4. Research Process and Data Source
Figure 5. Global Data Center Construction Solution Market Size Growth Rate (2021-2032) ($ millions)
Figure 6. Data Center Construction Solution Sales by Geographic Region (2021, 2025 & 2032) & ($ millions)
Figure 7. Data Center Construction Solution Sales Market Share by Country/Region (2025)
Figure 8. Data Center Construction Solution Sales Market Share by Country/Region (2021, 2025 & 2032)
Figure 9. Global Data Center Construction Solution Market Size Market Share by Type in 2025
Figure 10. Data Center Construction Solution in Hyperscale Data Centers
Figure 11. Global Data Center Construction Solution Market: Hyperscale Data Centers (2021-2026) & ($ millions)
Figure 12. Data Center Construction Solution in Enterprise Data Centers
Figure 13. Global Data Center Construction Solution Market: Enterprise Data Centers (2021-2026) & ($ millions)
Figure 14. Data Center Construction Solution in Colocation Data Centers
Figure 15. Global Data Center Construction Solution Market: Colocation Data Centers (2021-2026) & ($ millions)
Figure 16. Global Data Center Construction Solution Market Size Market Share by Application in 2025
Figure 17. Global Data Center Construction Solution Revenue Market Share by Player in 2025
Figure 18. Global Data Center Construction Solution Market Size Market Share by Region (2021-2026)
Figure 19. Americas Data Center Construction Solution Market Size 2021-2026 ($ millions)
Figure 20. APAC Data Center Construction Solution Market Size 2021-2026 ($ millions)
Figure 21. Europe Data Center Construction Solution Market Size 2021-2026 ($ millions)
Figure 22. Middle East & Africa Data Center Construction Solution Market Size 2021-2026 ($ millions)
Figure 23. Americas Data Center Construction Solution Value Market Share by Country in 2025
Figure 24. United States Data Center Construction Solution Market Size Growth 2021-2026 ($ millions)
Figure 25. Canada Data Center Construction Solution Market Size Growth 2021-2026 ($ millions)
Figure 26. Mexico Data Center Construction Solution Market Size Growth 2021-2026 ($ millions)
Figure 27. Brazil Data Center Construction Solution Market Size Growth 2021-2026 ($ millions)
Figure 28. APAC Data Center Construction Solution Market Size Market Share by Region in 2025
Figure 29. APAC Data Center Construction Solution Market Size Market Share by Type (2021-2026)
Figure 30. APAC Data Center Construction Solution Market Size Market Share by Application (2021-2026)
Figure 31. China Data Center Construction Solution Market Size Growth 2021-2026 ($ millions)
Figure 32. Japan Data Center Construction Solution Market Size Growth 2021-2026 ($ millions)
Figure 33. South Korea Data Center Construction Solution Market Size Growth 2021-2026 ($ millions)
Figure 34. Southeast Asia Data Center Construction Solution Market Size Growth 2021-2026 ($ millions)
Figure 35. India Data Center Construction Solution Market Size Growth 2021-2026 ($ millions)
Figure 36. Australia Data Center Construction Solution Market Size Growth 2021-2026 ($ millions)
Figure 37. Europe Data Center Construction Solution Market Size Market Share by Country in 2025
Figure 38. Europe Data Center Construction Solution Market Size Market Share by Type (2021-2026)
Figure 39. Europe Data Center Construction Solution Market Size Market Share by Application (2021-2026)
Figure 40. Germany Data Center Construction Solution Market Size Growth 2021-2026 ($ millions)
Figure 41. France Data Center Construction Solution Market Size Growth 2021-2026 ($ millions)
Figure 42. UK Data Center Construction Solution Market Size Growth 2021-2026 ($ millions)
Figure 43. Italy Data Center Construction Solution Market Size Growth 2021-2026 ($ millions)
Figure 44. Russia Data Center Construction Solution Market Size Growth 2021-2026 ($ millions)
Figure 45. Middle East & Africa Data Center Construction Solution Market Size Market Share by Region (2021-2026)
Figure 46. Middle East & Africa Data Center Construction Solution Market Size Market Share by Type (2021-2026)
Figure 47. Middle East & Africa Data Center Construction Solution Market Size Market Share by Application (2021-2026)
Figure 48. Egypt Data Center Construction Solution Market Size Growth 2021-2026 ($ millions)
Figure 49. South Africa Data Center Construction Solution Market Size Growth 2021-2026 ($ millions)
Figure 50. Israel Data Center Construction Solution Market Size Growth 2021-2026 ($ millions)
Figure 51. Turkey Data Center Construction Solution Market Size Growth 2021-2026 ($ millions)
Figure 52. GCC Countries Data Center Construction Solution Market Size Growth 2021-2026 ($ millions)
Figure 53. Americas Data Center Construction Solution Market Size 2027-2032 ($ millions)
Figure 54. APAC Data Center Construction Solution Market Size 2027-2032 ($ millions)
Figure 55. Europe Data Center Construction Solution Market Size 2027-2032 ($ millions)
Figure 56. Middle East & Africa Data Center Construction Solution Market Size 2027-2032 ($ millions)
Figure 57. United States Data Center Construction Solution Market Size 2027-2032 ($ millions)
Figure 58. Canada Data Center Construction Solution Market Size 2027-2032 ($ millions)
Figure 59. Mexico Data Center Construction Solution Market Size 2027-2032 ($ millions)
Figure 60. Brazil Data Center Construction Solution Market Size 2027-2032 ($ millions)
Figure 61. China Data Center Construction Solution Market Size 2027-2032 ($ millions)
Figure 62. Japan Data Center Construction Solution Market Size 2027-2032 ($ millions)
Figure 63. Korea Data Center Construction Solution Market Size 2027-2032 ($ millions)
Figure 64. Southeast Asia Data Center Construction Solution Market Size 2027-2032 ($ millions)
Figure 65. India Data Center Construction Solution Market Size 2027-2032 ($ millions)
Figure 66. Australia Data Center Construction Solution Market Size 2027-2032 ($ millions)
Figure 67. Germany Data Center Construction Solution Market Size 2027-2032 ($ millions)
Figure 68. France Data Center Construction Solution Market Size 2027-2032 ($ millions)
Figure 69. UK Data Center Construction Solution Market Size 2027-2032 ($ millions)
Figure 70. Italy Data Center Construction Solution Market Size 2027-2032 ($ millions)
Figure 71. Russia Data Center Construction Solution Market Size 2027-2032 ($ millions)
Figure 72. Egypt Data Center Construction Solution Market Size 2027-2032 ($ millions)
Figure 73. South Africa Data Center Construction Solution Market Size 2027-2032 ($ millions)
Figure 74. Israel Data Center Construction Solution Market Size 2027-2032 ($ millions)
Figure 75. Turkey Data Center Construction Solution Market Size 2027-2032 ($ millions)
Figure 76. Global Data Center Construction Solution Market Size Market Share Forecast by Type (2027-2032)
Figure 77. Global Data Center Construction Solution Market Size Market Share Forecast by Application (2027-2032)
Figure 78. GCC Countries Data Center Construction Solution Market Size 2027-2032 ($ millions)