Data Center Construction Market in Southeast Asia - Industry Outlook and Forecast 2020-2026
![](/report_cover/11201/data-center-construction-market-in-southeast-asia-industry-outlook-n-forecast-2020-2026_en.gif)
A data center is a facility used to house computer systems and associated components, such as telecommunications and storage systems. It generally includes redundant or backup power supplies, redundant data communications connections, environmental controls (e.g., air conditioning, fire suppression) and various security devices. Large data centers are industrial scale operations using as much electricity as a small town.
Data center construction is the collective set of processes used to physically construct a data center facility. It combines construction standards data center operational environment requirements.
Data center construction primarily focuses on designing and building a data center using these key factors:
Capacity: The floorplan of the data center must have enough room to house all servers and equipment for current and perceived future use.
Disaster Tolerant: The data center facility must be able to resist natural disasters and calamities such as earthquakes, floods, snowstorms, tornados, etc. Moreover, the data center construction also looks for ways to prevent disasters, such as adequate water tanks and hoses within the facility for putting out a fire.
Efficient Design: The overall design should be straightforward and require minimal wiring. With the shift towards green data centers, efficient air flow, renewable energy resources and other environmental factors are also taken into consideration.
This report contains market size and forecasts of Data Center Construction in Southeast Asia, including the following market information:
Southeast Asia Data Center Construction Market Revenue, 2015-2020, 2021-2026, ($ millions)
Top Five Competitors in Southeast Asia Data Center Construction Market 2019 (%)
The global Data Center Construction market was valued at 23790 million in 2019 and is projected to reach US$ 31960 million by 2026, at a CAGR of 7.7% during the forecast period. While the Data Center Construction market size in Southeast Asia was US$ XX million in 2019, and it is expected to reach US$ XX million by the end of 2026, with a CAGR of XX% during 2020-2026.
COVID-19 pandemic has big impact on Data Center Construction businesses, with lots of challenges and uncertainty faced by many players of Data Center Construction in Southeast Asia. This report also analyses and evaluates the COVID-19 impact on Data Center Construction market size in 2020 and the next few years in Southeast Asia
Total Market by Segment:
Southeast Asia Data Center Construction Market, By Type, 2015-2020, 2021-2026 ($ millions)
Southeast Asia Data Center Construction Market Segment Percentages, By Type, 2019 (%)
Southeast Asia Data Center Construction Market Segment Percentages, By Application, 2019 (%)
The report also provides analysis of leading market participants including:
Total Data Center Construction Market Competitors Revenues in Southeast Asia, by Players 2015-2020 (Estimated), ($ millions)
Total Data Center Construction Market Competitors Revenues Share in Southeast Asia, by Players 2019 (%)
Further, the report presents profiles of competitors in the market, including the following:
Data center construction is the collective set of processes used to physically construct a data center facility. It combines construction standards data center operational environment requirements.
Data center construction primarily focuses on designing and building a data center using these key factors:
Capacity: The floorplan of the data center must have enough room to house all servers and equipment for current and perceived future use.
Disaster Tolerant: The data center facility must be able to resist natural disasters and calamities such as earthquakes, floods, snowstorms, tornados, etc. Moreover, the data center construction also looks for ways to prevent disasters, such as adequate water tanks and hoses within the facility for putting out a fire.
Efficient Design: The overall design should be straightforward and require minimal wiring. With the shift towards green data centers, efficient air flow, renewable energy resources and other environmental factors are also taken into consideration.
This report contains market size and forecasts of Data Center Construction in Southeast Asia, including the following market information:
Southeast Asia Data Center Construction Market Revenue, 2015-2020, 2021-2026, ($ millions)
Top Five Competitors in Southeast Asia Data Center Construction Market 2019 (%)
The global Data Center Construction market was valued at 23790 million in 2019 and is projected to reach US$ 31960 million by 2026, at a CAGR of 7.7% during the forecast period. While the Data Center Construction market size in Southeast Asia was US$ XX million in 2019, and it is expected to reach US$ XX million by the end of 2026, with a CAGR of XX% during 2020-2026.
COVID-19 pandemic has big impact on Data Center Construction businesses, with lots of challenges and uncertainty faced by many players of Data Center Construction in Southeast Asia. This report also analyses and evaluates the COVID-19 impact on Data Center Construction market size in 2020 and the next few years in Southeast Asia
Total Market by Segment:
Southeast Asia Data Center Construction Market, By Type, 2015-2020, 2021-2026 ($ millions)
Southeast Asia Data Center Construction Market Segment Percentages, By Type, 2019 (%)
- Electrical Construction
- Mechanical Construction
- General Construction
Southeast Asia Data Center Construction Market Segment Percentages, By Application, 2019 (%)
- Finance
- Internet
- Telecommunications
- Government
- Others
The report also provides analysis of leading market participants including:
Total Data Center Construction Market Competitors Revenues in Southeast Asia, by Players 2015-2020 (Estimated), ($ millions)
Total Data Center Construction Market Competitors Revenues Share in Southeast Asia, by Players 2019 (%)
Further, the report presents profiles of competitors in the market, including the following:
- Aceco TI
- AECOM
- Turner Construction
- Equinix
- Fluor
- DPR Construction
1 INTRODUCTION TO RESEARCH & ANALYSIS REPORTS
1.1 Data Center Construction Market Definition
1.2 Market Segments
1.2.1 Segment by Type
1.2.2 Segment by Application
1.3 COVID-19 Impact: Southeast Asia Data Center Construction Market Overview
1.4 Features & Benefits of This Report
1.5 Methodology & Sources of Information
1.5.1 Research Methodology
1.5.2 Research Process
1.5.3 Base Year
1.5.4 Report Assumptions & Caveats
2 SOUTHEAST ASIA DATA CENTER CONSTRUCTION OVERALL MARKET SIZE
2.1 Southeast Asia Data Center Construction Market Size: 2020 VS 2026
2.2 Southeast Asia Data Center Construction Revenue, Prospects & Forecasts: 2015-2026
3 COMPANY LANDSCAPE
3.1 Top Data Center Construction Players in Southeast Asia (including Foreign and Local Companies)
3.2 Top Southeast Asia Data Center Construction Companies Ranked by Revenue
3.3 Southeast Asia Data Center Construction Revenue by Companies (including Foreign and Local Companies)
3.4 Top 3 and Top 5 Data Center Construction Companies in Southeast Asia, by Revenue in 2019
3.5 Southeast Asia Manufacturers Data Center Construction Product Type
3.6 Tier 1, Tier 2 and Tier 3 Data Center Construction Players in Southeast Asia
3.6.1 List of Southeast Asia Tier 1 Data Center Construction Companies
3.6.2 List of Southeast Asia Tier 2 and Tier 3 Data Center Construction Companies
4 SIGHTS BY PRODUCT
4.1 Overview
4.1.1 By Type - Southeast Asia Data Center Construction Market Size Markets, 2020 & 2026
4.1.2 Electrical Construction
4.1.3 Mechanical Construction
4.1.4 General Construction
4.2 By Type - Southeast Asia Data Center Construction Revenue & Forecasts
4.2.1 By Type - Southeast Asia Data Center Construction Revenue, 2015-2020
4.2.2 By Type - Southeast Asia Data Center Construction Revenue, 2021-2026
4.2.3 By Type - Southeast Asia Data Center Construction Revenue Market Share, 2015-2026
5 SIGHTS BY APPLICATION
5.1 Overview
5.1.1 By Application - Southeast Asia Data Center Construction Market Size, 2020 & 2026
5.1.2 Finance
5.1.3 Internet
5.1.4 Telecommunications
5.1.5 Government
5.1.6 Others
5.2 By Application - Southeast Asia Data Center Construction Revenue & Forecasts
5.2.1 By Application - Southeast Asia Data Center Construction Revenue, 2015-2020
5.2.2 By Application - Southeast Asia Data Center Construction Revenue, 2021-2026
5.2.3 By Application - Southeast Asia Data Center Construction Revenue Market Share, 2015-2026
6 PLAYERS PROFILES
6.1 Aceco TI
6.1.1 Aceco TI Corporate Summary
6.1.2 Aceco TI Business Overview
6.1.3 Aceco TI Data Center Construction Major Product Offerings
6.1.4 Aceco TI Revenue in Southeast Asia (2015-2020)
6.1.5 Aceco TI Key News
6.2 AECOM
6.2.1 AECOM Corporate Summary
6.2.2 AECOM Business Overview
6.2.3 AECOM Data Center Construction Major Product Offerings
6.2.4 AECOM Revenue in Southeast Asia (2015-2020)
6.2.5 AECOM Key News
6.3 Turner Construction
6.3.1 Turner Construction Corporate Summary
6.3.2 Turner Construction Business Overview
6.3.3 Turner Construction Data Center Construction Major Product Offerings
6.3.4 Turner Construction Revenue in Southeast Asia (2015-2020)
6.3.5 Turner Construction Key News
6.4 Equinix
6.4.1 Equinix Corporate Summary
6.4.2 Equinix Business Overview
6.4.3 Equinix Data Center Construction Major Product Offerings
6.4.4 Equinix Revenue in Southeast Asia (2015-2020)
6.4.5 Equinix Key News
6.5 Fluor
6.5.1 Fluor Corporate Summary
6.5.2 Fluor Business Overview
6.5.3 Fluor Data Center Construction Major Product Offerings
6.5.4 Fluor Revenue in Southeast Asia (2015-2020)
6.5.5 Fluor Key News
6.6 DPR Construction
6.6.1 DPR Construction Corporate Summary
6.6.2 DPR Construction Business Overview
6.6.3 DPR Construction Data Center Construction Major Product Offerings
6.6.4 DPR Construction Revenue in Southeast Asia (2015-2020)
6.6.5 DPR Construction Key News
6.7 Constructora Sudamericana S.A.
6.6.1 Constructora Sudamericana S.A. Corporate Summary
6.6.2 Constructora Sudamericana S.A. Business Overview
6.6.3 Constructora Sudamericana S.A. Data Center Construction Major Product Offerings
6.4.4 Constructora Sudamericana S.A. Revenue in Southeast Asia (2015-2020)
6.7.5 Constructora Sudamericana S.A. Key News
7 KEY MARKET TRENDS & INFLUENCES 2021-2026
7.1 PESTLE Analysis for Southeast Asia Data Center Construction Market
7.2 Market Opportunities & Trends
7.3 Market Drivers
7.4 Market Restraints
8 CONCLUSION
9 APPENDIX
9.1 Note
9.2 Examples of Clients
9.3 Disclaimer
1.1 Data Center Construction Market Definition
1.2 Market Segments
1.2.1 Segment by Type
1.2.2 Segment by Application
1.3 COVID-19 Impact: Southeast Asia Data Center Construction Market Overview
1.4 Features & Benefits of This Report
1.5 Methodology & Sources of Information
1.5.1 Research Methodology
1.5.2 Research Process
1.5.3 Base Year
1.5.4 Report Assumptions & Caveats
2 SOUTHEAST ASIA DATA CENTER CONSTRUCTION OVERALL MARKET SIZE
2.1 Southeast Asia Data Center Construction Market Size: 2020 VS 2026
2.2 Southeast Asia Data Center Construction Revenue, Prospects & Forecasts: 2015-2026
3 COMPANY LANDSCAPE
3.1 Top Data Center Construction Players in Southeast Asia (including Foreign and Local Companies)
3.2 Top Southeast Asia Data Center Construction Companies Ranked by Revenue
3.3 Southeast Asia Data Center Construction Revenue by Companies (including Foreign and Local Companies)
3.4 Top 3 and Top 5 Data Center Construction Companies in Southeast Asia, by Revenue in 2019
3.5 Southeast Asia Manufacturers Data Center Construction Product Type
3.6 Tier 1, Tier 2 and Tier 3 Data Center Construction Players in Southeast Asia
3.6.1 List of Southeast Asia Tier 1 Data Center Construction Companies
3.6.2 List of Southeast Asia Tier 2 and Tier 3 Data Center Construction Companies
4 SIGHTS BY PRODUCT
4.1 Overview
4.1.1 By Type - Southeast Asia Data Center Construction Market Size Markets, 2020 & 2026
4.1.2 Electrical Construction
4.1.3 Mechanical Construction
4.1.4 General Construction
4.2 By Type - Southeast Asia Data Center Construction Revenue & Forecasts
4.2.1 By Type - Southeast Asia Data Center Construction Revenue, 2015-2020
4.2.2 By Type - Southeast Asia Data Center Construction Revenue, 2021-2026
4.2.3 By Type - Southeast Asia Data Center Construction Revenue Market Share, 2015-2026
5 SIGHTS BY APPLICATION
5.1 Overview
5.1.1 By Application - Southeast Asia Data Center Construction Market Size, 2020 & 2026
5.1.2 Finance
5.1.3 Internet
5.1.4 Telecommunications
5.1.5 Government
5.1.6 Others
5.2 By Application - Southeast Asia Data Center Construction Revenue & Forecasts
5.2.1 By Application - Southeast Asia Data Center Construction Revenue, 2015-2020
5.2.2 By Application - Southeast Asia Data Center Construction Revenue, 2021-2026
5.2.3 By Application - Southeast Asia Data Center Construction Revenue Market Share, 2015-2026
6 PLAYERS PROFILES
6.1 Aceco TI
6.1.1 Aceco TI Corporate Summary
6.1.2 Aceco TI Business Overview
6.1.3 Aceco TI Data Center Construction Major Product Offerings
6.1.4 Aceco TI Revenue in Southeast Asia (2015-2020)
6.1.5 Aceco TI Key News
6.2 AECOM
6.2.1 AECOM Corporate Summary
6.2.2 AECOM Business Overview
6.2.3 AECOM Data Center Construction Major Product Offerings
6.2.4 AECOM Revenue in Southeast Asia (2015-2020)
6.2.5 AECOM Key News
6.3 Turner Construction
6.3.1 Turner Construction Corporate Summary
6.3.2 Turner Construction Business Overview
6.3.3 Turner Construction Data Center Construction Major Product Offerings
6.3.4 Turner Construction Revenue in Southeast Asia (2015-2020)
6.3.5 Turner Construction Key News
6.4 Equinix
6.4.1 Equinix Corporate Summary
6.4.2 Equinix Business Overview
6.4.3 Equinix Data Center Construction Major Product Offerings
6.4.4 Equinix Revenue in Southeast Asia (2015-2020)
6.4.5 Equinix Key News
6.5 Fluor
6.5.1 Fluor Corporate Summary
6.5.2 Fluor Business Overview
6.5.3 Fluor Data Center Construction Major Product Offerings
6.5.4 Fluor Revenue in Southeast Asia (2015-2020)
6.5.5 Fluor Key News
6.6 DPR Construction
6.6.1 DPR Construction Corporate Summary
6.6.2 DPR Construction Business Overview
6.6.3 DPR Construction Data Center Construction Major Product Offerings
6.6.4 DPR Construction Revenue in Southeast Asia (2015-2020)
6.6.5 DPR Construction Key News
6.7 Constructora Sudamericana S.A.
6.6.1 Constructora Sudamericana S.A. Corporate Summary
6.6.2 Constructora Sudamericana S.A. Business Overview
6.6.3 Constructora Sudamericana S.A. Data Center Construction Major Product Offerings
6.4.4 Constructora Sudamericana S.A. Revenue in Southeast Asia (2015-2020)
6.7.5 Constructora Sudamericana S.A. Key News
7 KEY MARKET TRENDS & INFLUENCES 2021-2026
7.1 PESTLE Analysis for Southeast Asia Data Center Construction Market
7.2 Market Opportunities & Trends
7.3 Market Drivers
7.4 Market Restraints
8 CONCLUSION
9 APPENDIX
9.1 Note
9.2 Examples of Clients
9.3 Disclaimer
LIST OF TABLES
Table 1. Key Players of Data Center Construction in Southeast Asia
Table 2. Top Players in Southeast Asia, Ranking by Revenue (2019)
Table 3. Southeast Asia Data Center Construction Revenue by Companies, (US$, Mn), 2015-2020
Table 4. Southeast Asia Data Center Construction Revenue Share by Companies, 2015-2020
Table 5. Southeast Asia Data Center Construction Sales by Companies, (K Units), 2015-2020
Table 6. Southeast Asia Data Center Construction Sales Share by Companies, 2015-2020
Table 7. Key Manufacturers Data Center Construction Price (2015-2020) (US$/Unit)
Table 8. Southeast Asia Manufacturers Data Center Construction Product Type
Table 9. List of Southeast Asia Tier 1 Data Center Construction Companies, Revenue (US$, Mn) in 2019 and Market Share
Table 10. List of Southeast Asia Tier 2 and Tier 3 Data Center Construction Companies, Revenue (US$, Mn) in 2019 and Market Share
Table 11. By Type - Data Center Construction Revenue in Southeast Asia (US$, Mn), 2015-2020
Table 12. By Type - Data Center Construction Revenue in Southeast Asia (US$, Mn), 2021-2026
Table 13. By Type - Data Center Construction Sales in Southeast Asia (K Units), 2015-2020
Table 14. By Type - Data Center Construction Sales in Southeast Asia (K Units), 2021-2026
Table 15. By Application - Data Center Construction Revenue in Southeast Asia, (US$, Mn), 2015-2020
Table 16. By Application - Data Center Construction Revenue in Southeast Asia, (US$, Mn), 2021-2026
Table 17. By Application - Data Center Construction Sales in Southeast Asia, (K Units), 2015-2020
Table 18. By Application - Data Center Construction Sales in Southeast Asia, (K Units), 2021-2026
Table 19. Aceco TI Corporate Summary
Table 20. Aceco TI Data Center Construction Product Offerings
Table 21. Aceco TI Data Center Construction Revenue (US$, Mn), (2015-2020)
Table 22. AECOM Corporate Summary
Table 23. AECOM Data Center Construction Product Offerings
Table 24. AECOM Data Center Construction Revenue (US$, Mn), (2015-2020)
Table 25. Turner Construction Corporate Summary
Table 26. Turner Construction Data Center Construction Product Offerings
Table 27. Turner Construction Data Center Construction Revenue (US$, Mn), (2015-2020)
Table 28. Equinix Corporate Summary
Table 29. Equinix Data Center Construction Product Offerings
Table 30. Equinix Data Center Construction Revenue (US$, Mn), (2015-2020)
Table 31. Fluor Corporate Summary
Table 32. Fluor Data Center Construction Product Offerings
Table 33. Fluor Data Center Construction Revenue (US$, Mn), (2015-2020)
Table 34. DPR Construction Corporate Summary
Table 35. DPR Construction Data Center Construction Product Offerings
Table 36. DPR Construction Data Center Construction Revenue (US$, Mn), (2015-2020)
Table 37. Constructora Sudamericana S.A. Corporate Summary
Table 38. Constructora Sudamericana S.A. Data Center Construction Product Offerings
Table 39. Constructora Sudamericana S.A. Data Center Construction Revenue (US$, Mn), (2015-2020)
Table 1. Key Players of Data Center Construction in Southeast Asia
Table 2. Top Players in Southeast Asia, Ranking by Revenue (2019)
Table 3. Southeast Asia Data Center Construction Revenue by Companies, (US$, Mn), 2015-2020
Table 4. Southeast Asia Data Center Construction Revenue Share by Companies, 2015-2020
Table 5. Southeast Asia Data Center Construction Sales by Companies, (K Units), 2015-2020
Table 6. Southeast Asia Data Center Construction Sales Share by Companies, 2015-2020
Table 7. Key Manufacturers Data Center Construction Price (2015-2020) (US$/Unit)
Table 8. Southeast Asia Manufacturers Data Center Construction Product Type
Table 9. List of Southeast Asia Tier 1 Data Center Construction Companies, Revenue (US$, Mn) in 2019 and Market Share
Table 10. List of Southeast Asia Tier 2 and Tier 3 Data Center Construction Companies, Revenue (US$, Mn) in 2019 and Market Share
Table 11. By Type - Data Center Construction Revenue in Southeast Asia (US$, Mn), 2015-2020
Table 12. By Type - Data Center Construction Revenue in Southeast Asia (US$, Mn), 2021-2026
Table 13. By Type - Data Center Construction Sales in Southeast Asia (K Units), 2015-2020
Table 14. By Type - Data Center Construction Sales in Southeast Asia (K Units), 2021-2026
Table 15. By Application - Data Center Construction Revenue in Southeast Asia, (US$, Mn), 2015-2020
Table 16. By Application - Data Center Construction Revenue in Southeast Asia, (US$, Mn), 2021-2026
Table 17. By Application - Data Center Construction Sales in Southeast Asia, (K Units), 2015-2020
Table 18. By Application - Data Center Construction Sales in Southeast Asia, (K Units), 2021-2026
Table 19. Aceco TI Corporate Summary
Table 20. Aceco TI Data Center Construction Product Offerings
Table 21. Aceco TI Data Center Construction Revenue (US$, Mn), (2015-2020)
Table 22. AECOM Corporate Summary
Table 23. AECOM Data Center Construction Product Offerings
Table 24. AECOM Data Center Construction Revenue (US$, Mn), (2015-2020)
Table 25. Turner Construction Corporate Summary
Table 26. Turner Construction Data Center Construction Product Offerings
Table 27. Turner Construction Data Center Construction Revenue (US$, Mn), (2015-2020)
Table 28. Equinix Corporate Summary
Table 29. Equinix Data Center Construction Product Offerings
Table 30. Equinix Data Center Construction Revenue (US$, Mn), (2015-2020)
Table 31. Fluor Corporate Summary
Table 32. Fluor Data Center Construction Product Offerings
Table 33. Fluor Data Center Construction Revenue (US$, Mn), (2015-2020)
Table 34. DPR Construction Corporate Summary
Table 35. DPR Construction Data Center Construction Product Offerings
Table 36. DPR Construction Data Center Construction Revenue (US$, Mn), (2015-2020)
Table 37. Constructora Sudamericana S.A. Corporate Summary
Table 38. Constructora Sudamericana S.A. Data Center Construction Product Offerings
Table 39. Constructora Sudamericana S.A. Data Center Construction Revenue (US$, Mn), (2015-2020)
LIST OF FIGURES
Figure 1. Data Center Construction Segment by Type
Figure 2. Data Center Construction Segment by Application
Figure 3. Southeast Asia Data Center Construction Market Overview: 2020
Figure 4. Key Caveats
Figure 5. Data Center Construction Market Size in Southeast Asia, (US$, Mn): 2020 VS 2026
Figure 6. Southeast Asia Data Center Construction Revenue, 2015-2026 (US$, Mn)
Figure 7. The Top 3 and 5 Players Market Share by Data Center Construction Revenue in 2019
Figure 8. By Type - Southeast Asia Data Center Construction Incremental Growth, (US$, Mn), 2015-2026
Figure 9. By Type - Southeast Asia Data Center Construction Market Share, 2015-2026
Figure 10. By Application - Data Center Construction Revenue in Southeast Asia (US$, Mn), 2020 & 2026
Figure 11. By Application - Southeast Asia Data Center Construction Market Share, 2015-2026
Figure 12. PEST Analysis for Southeast Asia Data Center Construction Market in 2020
Figure 13. Data Center Construction Market Opportunities & Trends in Southeast Asia
Figure 14. Data Center Construction Market Drivers in Southeast Asia
Figure 1. Data Center Construction Segment by Type
Figure 2. Data Center Construction Segment by Application
Figure 3. Southeast Asia Data Center Construction Market Overview: 2020
Figure 4. Key Caveats
Figure 5. Data Center Construction Market Size in Southeast Asia, (US$, Mn): 2020 VS 2026
Figure 6. Southeast Asia Data Center Construction Revenue, 2015-2026 (US$, Mn)
Figure 7. The Top 3 and 5 Players Market Share by Data Center Construction Revenue in 2019
Figure 8. By Type - Southeast Asia Data Center Construction Incremental Growth, (US$, Mn), 2015-2026
Figure 9. By Type - Southeast Asia Data Center Construction Market Share, 2015-2026
Figure 10. By Application - Data Center Construction Revenue in Southeast Asia (US$, Mn), 2020 & 2026
Figure 11. By Application - Southeast Asia Data Center Construction Market Share, 2015-2026
Figure 12. PEST Analysis for Southeast Asia Data Center Construction Market in 2020
Figure 13. Data Center Construction Market Opportunities & Trends in Southeast Asia
Figure 14. Data Center Construction Market Drivers in Southeast Asia