Data Center Construction Market in Germany - Industry Outlook and Forecast 2020-2026
![](/report_cover/11201/data-center-construction-market-in-germany-industry-outlook-n-forecast-2020-2026_en.gif)
A data center is a facility used to house computer systems and associated components, such as telecommunications and storage systems. It generally includes redundant or backup power supplies, redundant data communications connections, environmental controls (e.g., air conditioning, fire suppression) and various security devices. Large data centers are industrial scale operations using as much electricity as a small town.
Data center construction is the collective set of processes used to physically construct a data center facility. It combines construction standards data center operational environment requirements.
Data center construction primarily focuses on designing and building a data center using these key factors:
Capacity: The floorplan of the data center must have enough room to house all servers and equipment for current and perceived future use.
Disaster Tolerant: The data center facility must be able to resist natural disasters and calamities such as earthquakes, floods, snowstorms, tornados, etc. Moreover, the data center construction also looks for ways to prevent disasters, such as adequate water tanks and hoses within the facility for putting out a fire.
Efficient Design: The overall design should be straightforward and require minimal wiring. With the shift towards green data centers, efficient air flow, renewable energy resources and other environmental factors are also taken into consideration.
This report contains market size and forecasts of Data Center Construction in Germany, including the following market information:
Germany Data Center Construction Market Revenue, 2015-2020, 2021-2026, ($ millions)
Top Five Competitors in Germany Data Center Construction Market 2019 (%)
The global Data Center Construction market was valued at 23790 million in 2019 and is projected to reach US$ 31960 million by 2026, at a CAGR of 7.7% during the forecast period. While the Data Center Construction market size in Germany was US$ XX million in 2019, and it is expected to reach US$ XX million by the end of 2026, with a CAGR of XX% during 2020-2026.
COVID-19 pandemic has big impact on Data Center Construction businesses, with lots of challenges and uncertainty faced by many players of Data Center Construction in Germany. This report also analyses and evaluates the COVID-19 impact on Data Center Construction market size in 2020 and the next few years in Germany
Total Market by Segment:
Germany Data Center Construction Market, By Type, 2015-2020, 2021-2026 ($ millions)
Germany Data Center Construction Market Segment Percentages, By Type, 2019 (%)
Germany Data Center Construction Market Segment Percentages, By Application, 2019 (%)
The report also provides analysis of leading market participants including:
Total Data Center Construction Market Competitors Revenues in Germany, by Players 2015-2020 (Estimated), ($ millions)
Total Data Center Construction Market Competitors Revenues Share in Germany, by Players 2019 (%)
Further, the report presents profiles of competitors in the market, including the following:
Data center construction is the collective set of processes used to physically construct a data center facility. It combines construction standards data center operational environment requirements.
Data center construction primarily focuses on designing and building a data center using these key factors:
Capacity: The floorplan of the data center must have enough room to house all servers and equipment for current and perceived future use.
Disaster Tolerant: The data center facility must be able to resist natural disasters and calamities such as earthquakes, floods, snowstorms, tornados, etc. Moreover, the data center construction also looks for ways to prevent disasters, such as adequate water tanks and hoses within the facility for putting out a fire.
Efficient Design: The overall design should be straightforward and require minimal wiring. With the shift towards green data centers, efficient air flow, renewable energy resources and other environmental factors are also taken into consideration.
This report contains market size and forecasts of Data Center Construction in Germany, including the following market information:
Germany Data Center Construction Market Revenue, 2015-2020, 2021-2026, ($ millions)
Top Five Competitors in Germany Data Center Construction Market 2019 (%)
The global Data Center Construction market was valued at 23790 million in 2019 and is projected to reach US$ 31960 million by 2026, at a CAGR of 7.7% during the forecast period. While the Data Center Construction market size in Germany was US$ XX million in 2019, and it is expected to reach US$ XX million by the end of 2026, with a CAGR of XX% during 2020-2026.
COVID-19 pandemic has big impact on Data Center Construction businesses, with lots of challenges and uncertainty faced by many players of Data Center Construction in Germany. This report also analyses and evaluates the COVID-19 impact on Data Center Construction market size in 2020 and the next few years in Germany
Total Market by Segment:
Germany Data Center Construction Market, By Type, 2015-2020, 2021-2026 ($ millions)
Germany Data Center Construction Market Segment Percentages, By Type, 2019 (%)
- Electrical Construction
- Mechanical Construction
- General Construction
Germany Data Center Construction Market Segment Percentages, By Application, 2019 (%)
- Finance
- Internet
- Telecommunications
- Government
- Others
The report also provides analysis of leading market participants including:
Total Data Center Construction Market Competitors Revenues in Germany, by Players 2015-2020 (Estimated), ($ millions)
Total Data Center Construction Market Competitors Revenues Share in Germany, by Players 2019 (%)
Further, the report presents profiles of competitors in the market, including the following:
- Aceco TI
- AECOM
- Turner Construction
- Equinix
- Fluor
- DPR Construction
1 INTRODUCTION TO RESEARCH & ANALYSIS REPORTS
1.1 Data Center Construction Market Definition
1.2 Market Segments
1.2.1 Segment by Type
1.2.2 Segment by Application
1.3 COVID-19 Impact: Germany Data Center Construction Market Overview
1.4 Features & Benefits of This Report
1.5 Methodology & Sources of Information
1.5.1 Research Methodology
1.5.2 Research Process
1.5.3 Base Year
1.5.4 Report Assumptions & Caveats
2 GERMANY DATA CENTER CONSTRUCTION OVERALL MARKET SIZE
2.1 Germany Data Center Construction Market Size: 2020 VS 2026
2.2 Germany Data Center Construction Revenue, Prospects & Forecasts: 2015-2026
3 COMPANY LANDSCAPE
3.1 Top Data Center Construction Players in Germany (including Foreign and Local Companies)
3.2 Top Germany Data Center Construction Companies Ranked by Revenue
3.3 Germany Data Center Construction Revenue by Companies (including Foreign and Local Companies)
3.4 Top 3 and Top 5 Data Center Construction Companies in Germany, by Revenue in 2019
3.5 Germany Manufacturers Data Center Construction Product Type
3.6 Tier 1, Tier 2 and Tier 3 Data Center Construction Players in Germany
3.6.1 List of Germany Tier 1 Data Center Construction Companies
3.6.2 List of Germany Tier 2 and Tier 3 Data Center Construction Companies
4 SIGHTS BY PRODUCT
4.1 Overview
4.1.1 By Type - Germany Data Center Construction Market Size Markets, 2020 & 2026
4.1.2 Electrical Construction
4.1.3 Mechanical Construction
4.1.4 General Construction
4.2 By Type - Germany Data Center Construction Revenue & Forecasts
4.2.1 By Type - Germany Data Center Construction Revenue, 2015-2020
4.2.2 By Type - Germany Data Center Construction Revenue, 2021-2026
4.2.3 By Type - Germany Data Center Construction Revenue Market Share, 2015-2026
5 SIGHTS BY APPLICATION
5.1 Overview
5.1.1 By Application - Germany Data Center Construction Market Size, 2020 & 2026
5.1.2 Finance
5.1.3 Internet
5.1.4 Telecommunications
5.1.5 Government
5.1.6 Others
5.2 By Application - Germany Data Center Construction Revenue & Forecasts
5.2.1 By Application - Germany Data Center Construction Revenue, 2015-2020
5.2.2 By Application - Germany Data Center Construction Revenue, 2021-2026
5.2.3 By Application - Germany Data Center Construction Revenue Market Share, 2015-2026
6 PLAYERS PROFILES
6.1 Aceco TI
6.1.1 Aceco TI Corporate Summary
6.1.2 Aceco TI Business Overview
6.1.3 Aceco TI Data Center Construction Major Product Offerings
6.1.4 Aceco TI Revenue in Germany (2015-2020)
6.1.5 Aceco TI Key News
6.2 AECOM
6.2.1 AECOM Corporate Summary
6.2.2 AECOM Business Overview
6.2.3 AECOM Data Center Construction Major Product Offerings
6.2.4 AECOM Revenue in Germany (2015-2020)
6.2.5 AECOM Key News
6.3 Turner Construction
6.3.1 Turner Construction Corporate Summary
6.3.2 Turner Construction Business Overview
6.3.3 Turner Construction Data Center Construction Major Product Offerings
6.3.4 Turner Construction Revenue in Germany (2015-2020)
6.3.5 Turner Construction Key News
6.4 Equinix
6.4.1 Equinix Corporate Summary
6.4.2 Equinix Business Overview
6.4.3 Equinix Data Center Construction Major Product Offerings
6.4.4 Equinix Revenue in Germany (2015-2020)
6.4.5 Equinix Key News
6.5 Fluor
6.5.1 Fluor Corporate Summary
6.5.2 Fluor Business Overview
6.5.3 Fluor Data Center Construction Major Product Offerings
6.5.4 Fluor Revenue in Germany (2015-2020)
6.5.5 Fluor Key News
6.6 DPR Construction
6.6.1 DPR Construction Corporate Summary
6.6.2 DPR Construction Business Overview
6.6.3 DPR Construction Data Center Construction Major Product Offerings
6.6.4 DPR Construction Revenue in Germany (2015-2020)
6.6.5 DPR Construction Key News
6.7 Constructora Sudamericana S.A.
6.6.1 Constructora Sudamericana S.A. Corporate Summary
6.6.2 Constructora Sudamericana S.A. Business Overview
6.6.3 Constructora Sudamericana S.A. Data Center Construction Major Product Offerings
6.4.4 Constructora Sudamericana S.A. Revenue in Germany (2015-2020)
6.7.5 Constructora Sudamericana S.A. Key News
7 KEY MARKET TRENDS & INFLUENCES 2021-2026
7.1 PESTLE Analysis for Germany Data Center Construction Market
7.2 Market Opportunities & Trends
7.3 Market Drivers
7.4 Market Restraints
8 CONCLUSION
9 APPENDIX
9.1 Note
9.2 Examples of Clients
9.3 Disclaimer
1.1 Data Center Construction Market Definition
1.2 Market Segments
1.2.1 Segment by Type
1.2.2 Segment by Application
1.3 COVID-19 Impact: Germany Data Center Construction Market Overview
1.4 Features & Benefits of This Report
1.5 Methodology & Sources of Information
1.5.1 Research Methodology
1.5.2 Research Process
1.5.3 Base Year
1.5.4 Report Assumptions & Caveats
2 GERMANY DATA CENTER CONSTRUCTION OVERALL MARKET SIZE
2.1 Germany Data Center Construction Market Size: 2020 VS 2026
2.2 Germany Data Center Construction Revenue, Prospects & Forecasts: 2015-2026
3 COMPANY LANDSCAPE
3.1 Top Data Center Construction Players in Germany (including Foreign and Local Companies)
3.2 Top Germany Data Center Construction Companies Ranked by Revenue
3.3 Germany Data Center Construction Revenue by Companies (including Foreign and Local Companies)
3.4 Top 3 and Top 5 Data Center Construction Companies in Germany, by Revenue in 2019
3.5 Germany Manufacturers Data Center Construction Product Type
3.6 Tier 1, Tier 2 and Tier 3 Data Center Construction Players in Germany
3.6.1 List of Germany Tier 1 Data Center Construction Companies
3.6.2 List of Germany Tier 2 and Tier 3 Data Center Construction Companies
4 SIGHTS BY PRODUCT
4.1 Overview
4.1.1 By Type - Germany Data Center Construction Market Size Markets, 2020 & 2026
4.1.2 Electrical Construction
4.1.3 Mechanical Construction
4.1.4 General Construction
4.2 By Type - Germany Data Center Construction Revenue & Forecasts
4.2.1 By Type - Germany Data Center Construction Revenue, 2015-2020
4.2.2 By Type - Germany Data Center Construction Revenue, 2021-2026
4.2.3 By Type - Germany Data Center Construction Revenue Market Share, 2015-2026
5 SIGHTS BY APPLICATION
5.1 Overview
5.1.1 By Application - Germany Data Center Construction Market Size, 2020 & 2026
5.1.2 Finance
5.1.3 Internet
5.1.4 Telecommunications
5.1.5 Government
5.1.6 Others
5.2 By Application - Germany Data Center Construction Revenue & Forecasts
5.2.1 By Application - Germany Data Center Construction Revenue, 2015-2020
5.2.2 By Application - Germany Data Center Construction Revenue, 2021-2026
5.2.3 By Application - Germany Data Center Construction Revenue Market Share, 2015-2026
6 PLAYERS PROFILES
6.1 Aceco TI
6.1.1 Aceco TI Corporate Summary
6.1.2 Aceco TI Business Overview
6.1.3 Aceco TI Data Center Construction Major Product Offerings
6.1.4 Aceco TI Revenue in Germany (2015-2020)
6.1.5 Aceco TI Key News
6.2 AECOM
6.2.1 AECOM Corporate Summary
6.2.2 AECOM Business Overview
6.2.3 AECOM Data Center Construction Major Product Offerings
6.2.4 AECOM Revenue in Germany (2015-2020)
6.2.5 AECOM Key News
6.3 Turner Construction
6.3.1 Turner Construction Corporate Summary
6.3.2 Turner Construction Business Overview
6.3.3 Turner Construction Data Center Construction Major Product Offerings
6.3.4 Turner Construction Revenue in Germany (2015-2020)
6.3.5 Turner Construction Key News
6.4 Equinix
6.4.1 Equinix Corporate Summary
6.4.2 Equinix Business Overview
6.4.3 Equinix Data Center Construction Major Product Offerings
6.4.4 Equinix Revenue in Germany (2015-2020)
6.4.5 Equinix Key News
6.5 Fluor
6.5.1 Fluor Corporate Summary
6.5.2 Fluor Business Overview
6.5.3 Fluor Data Center Construction Major Product Offerings
6.5.4 Fluor Revenue in Germany (2015-2020)
6.5.5 Fluor Key News
6.6 DPR Construction
6.6.1 DPR Construction Corporate Summary
6.6.2 DPR Construction Business Overview
6.6.3 DPR Construction Data Center Construction Major Product Offerings
6.6.4 DPR Construction Revenue in Germany (2015-2020)
6.6.5 DPR Construction Key News
6.7 Constructora Sudamericana S.A.
6.6.1 Constructora Sudamericana S.A. Corporate Summary
6.6.2 Constructora Sudamericana S.A. Business Overview
6.6.3 Constructora Sudamericana S.A. Data Center Construction Major Product Offerings
6.4.4 Constructora Sudamericana S.A. Revenue in Germany (2015-2020)
6.7.5 Constructora Sudamericana S.A. Key News
7 KEY MARKET TRENDS & INFLUENCES 2021-2026
7.1 PESTLE Analysis for Germany Data Center Construction Market
7.2 Market Opportunities & Trends
7.3 Market Drivers
7.4 Market Restraints
8 CONCLUSION
9 APPENDIX
9.1 Note
9.2 Examples of Clients
9.3 Disclaimer
LIST OF TABLES
Table 1. Key Players of Data Center Construction in Germany
Table 2. Top Players in Germany, Ranking by Revenue (2019)
Table 3. Germany Data Center Construction Revenue by Companies, (US$, Mn), 2015-2020
Table 4. Germany Data Center Construction Revenue Share by Companies, 2015-2020
Table 5. Germany Data Center Construction Sales by Companies, (K Units), 2015-2020
Table 6. Germany Data Center Construction Sales Share by Companies, 2015-2020
Table 7. Key Manufacturers Data Center Construction Price (2015-2020) (US$/Unit)
Table 8. Germany Manufacturers Data Center Construction Product Type
Table 9. List of Germany Tier 1 Data Center Construction Companies, Revenue (US$, Mn) in 2019 and Market Share
Table 10. List of Germany Tier 2 and Tier 3 Data Center Construction Companies, Revenue (US$, Mn) in 2019 and Market Share
Table 11. By Type - Data Center Construction Revenue in Germany (US$, Mn), 2015-2020
Table 12. By Type - Data Center Construction Revenue in Germany (US$, Mn), 2021-2026
Table 13. By Type - Data Center Construction Sales in Germany (K Units), 2015-2020
Table 14. By Type - Data Center Construction Sales in Germany (K Units), 2021-2026
Table 15. By Application - Data Center Construction Revenue in Germany, (US$, Mn), 2015-2020
Table 16. By Application - Data Center Construction Revenue in Germany, (US$, Mn), 2021-2026
Table 17. By Application - Data Center Construction Sales in Germany, (K Units), 2015-2020
Table 18. By Application - Data Center Construction Sales in Germany, (K Units), 2021-2026
Table 19. Aceco TI Corporate Summary
Table 20. Aceco TI Data Center Construction Product Offerings
Table 21. Aceco TI Data Center Construction Revenue (US$, Mn), (2015-2020)
Table 22. AECOM Corporate Summary
Table 23. AECOM Data Center Construction Product Offerings
Table 24. AECOM Data Center Construction Revenue (US$, Mn), (2015-2020)
Table 25. Turner Construction Corporate Summary
Table 26. Turner Construction Data Center Construction Product Offerings
Table 27. Turner Construction Data Center Construction Revenue (US$, Mn), (2015-2020)
Table 28. Equinix Corporate Summary
Table 29. Equinix Data Center Construction Product Offerings
Table 30. Equinix Data Center Construction Revenue (US$, Mn), (2015-2020)
Table 31. Fluor Corporate Summary
Table 32. Fluor Data Center Construction Product Offerings
Table 33. Fluor Data Center Construction Revenue (US$, Mn), (2015-2020)
Table 34. DPR Construction Corporate Summary
Table 35. DPR Construction Data Center Construction Product Offerings
Table 36. DPR Construction Data Center Construction Revenue (US$, Mn), (2015-2020)
Table 37. Constructora Sudamericana S.A. Corporate Summary
Table 38. Constructora Sudamericana S.A. Data Center Construction Product Offerings
Table 39. Constructora Sudamericana S.A. Data Center Construction Revenue (US$, Mn), (2015-2020)
Table 1. Key Players of Data Center Construction in Germany
Table 2. Top Players in Germany, Ranking by Revenue (2019)
Table 3. Germany Data Center Construction Revenue by Companies, (US$, Mn), 2015-2020
Table 4. Germany Data Center Construction Revenue Share by Companies, 2015-2020
Table 5. Germany Data Center Construction Sales by Companies, (K Units), 2015-2020
Table 6. Germany Data Center Construction Sales Share by Companies, 2015-2020
Table 7. Key Manufacturers Data Center Construction Price (2015-2020) (US$/Unit)
Table 8. Germany Manufacturers Data Center Construction Product Type
Table 9. List of Germany Tier 1 Data Center Construction Companies, Revenue (US$, Mn) in 2019 and Market Share
Table 10. List of Germany Tier 2 and Tier 3 Data Center Construction Companies, Revenue (US$, Mn) in 2019 and Market Share
Table 11. By Type - Data Center Construction Revenue in Germany (US$, Mn), 2015-2020
Table 12. By Type - Data Center Construction Revenue in Germany (US$, Mn), 2021-2026
Table 13. By Type - Data Center Construction Sales in Germany (K Units), 2015-2020
Table 14. By Type - Data Center Construction Sales in Germany (K Units), 2021-2026
Table 15. By Application - Data Center Construction Revenue in Germany, (US$, Mn), 2015-2020
Table 16. By Application - Data Center Construction Revenue in Germany, (US$, Mn), 2021-2026
Table 17. By Application - Data Center Construction Sales in Germany, (K Units), 2015-2020
Table 18. By Application - Data Center Construction Sales in Germany, (K Units), 2021-2026
Table 19. Aceco TI Corporate Summary
Table 20. Aceco TI Data Center Construction Product Offerings
Table 21. Aceco TI Data Center Construction Revenue (US$, Mn), (2015-2020)
Table 22. AECOM Corporate Summary
Table 23. AECOM Data Center Construction Product Offerings
Table 24. AECOM Data Center Construction Revenue (US$, Mn), (2015-2020)
Table 25. Turner Construction Corporate Summary
Table 26. Turner Construction Data Center Construction Product Offerings
Table 27. Turner Construction Data Center Construction Revenue (US$, Mn), (2015-2020)
Table 28. Equinix Corporate Summary
Table 29. Equinix Data Center Construction Product Offerings
Table 30. Equinix Data Center Construction Revenue (US$, Mn), (2015-2020)
Table 31. Fluor Corporate Summary
Table 32. Fluor Data Center Construction Product Offerings
Table 33. Fluor Data Center Construction Revenue (US$, Mn), (2015-2020)
Table 34. DPR Construction Corporate Summary
Table 35. DPR Construction Data Center Construction Product Offerings
Table 36. DPR Construction Data Center Construction Revenue (US$, Mn), (2015-2020)
Table 37. Constructora Sudamericana S.A. Corporate Summary
Table 38. Constructora Sudamericana S.A. Data Center Construction Product Offerings
Table 39. Constructora Sudamericana S.A. Data Center Construction Revenue (US$, Mn), (2015-2020)
LIST OF FIGURES
Figure 1. Data Center Construction Segment by Type
Figure 2. Data Center Construction Segment by Application
Figure 3. Germany Data Center Construction Market Overview: 2020
Figure 4. Key Caveats
Figure 5. Data Center Construction Market Size in Germany, (US$, Mn): 2020 VS 2026
Figure 6. Germany Data Center Construction Revenue, 2015-2026 (US$, Mn)
Figure 7. The Top 3 and 5 Players Market Share by Data Center Construction Revenue in 2019
Figure 8. By Type - Germany Data Center Construction Incremental Growth, (US$, Mn), 2015-2026
Figure 9. By Type - Germany Data Center Construction Market Share, 2015-2026
Figure 10. By Application - Data Center Construction Revenue in Germany (US$, Mn), 2020 & 2026
Figure 11. By Application - Germany Data Center Construction Market Share, 2015-2026
Figure 12. PEST Analysis for Germany Data Center Construction Market in 2020
Figure 13. Data Center Construction Market Opportunities & Trends in Germany
Figure 14. Data Center Construction Market Drivers in Germany
Figure 1. Data Center Construction Segment by Type
Figure 2. Data Center Construction Segment by Application
Figure 3. Germany Data Center Construction Market Overview: 2020
Figure 4. Key Caveats
Figure 5. Data Center Construction Market Size in Germany, (US$, Mn): 2020 VS 2026
Figure 6. Germany Data Center Construction Revenue, 2015-2026 (US$, Mn)
Figure 7. The Top 3 and 5 Players Market Share by Data Center Construction Revenue in 2019
Figure 8. By Type - Germany Data Center Construction Incremental Growth, (US$, Mn), 2015-2026
Figure 9. By Type - Germany Data Center Construction Market Share, 2015-2026
Figure 10. By Application - Data Center Construction Revenue in Germany (US$, Mn), 2020 & 2026
Figure 11. By Application - Germany Data Center Construction Market Share, 2015-2026
Figure 12. PEST Analysis for Germany Data Center Construction Market in 2020
Figure 13. Data Center Construction Market Opportunities & Trends in Germany
Figure 14. Data Center Construction Market Drivers in Germany