[email protected] +44 20 8123 2220 (UK) +1 732 587 5005 (US) Contact Us | FAQ |

Opportunities in Power Transmission Capability & Infrastructure Expansion in India

October 2017 | 400 pages | ID: O54C30C3CD0EN
Eninrac Consulting Private Limited

US$ 1,199.00

E-mail Delivery (PDF)

Download PDF Leaflet

Accepted cards
Wire Transfer
Checkout Later
Need Help? Ask a Question
Gauging Support Matrix for Power Trading & Open Access Transactions with Regional Surplus/ Shortage Tracks

Since the current power transaction dynamics in the country is shaping up in favour of more open access transactions meaning a continued need for enabling power transmission infrastructure to felicitate what could be termed as “ True Open Access ” . In this milieu the role of not only the CTU and STU shall be important but also the participation on PPP basis by IPTCs shall be equally pivotal. Thus, there was an ardent need of a comprehensive analysis covering all the facets which offer opportunities in relation to the identified growth engine of current power sector in the country i.e. transmission segment.

Key Queries Resolved
  • What would be the market size & business potential for players in Indian power transmission segment ?
  • What measures to be undertaken for upgradation of existing and upcoming transmission lines ?
  • What are the targeted plans for power trading by 2022 for STOA/MTOA/LTOA ?
  • What are the key challenges to be addressed for felicitating open access and power trading ?
  • What are the lost capacities in terms of “MW” and revenue due to transmission bottleneck ?
  • What would be the transmission capacity growth rate track for thermal power plants & estimating the deficiency track ?
  • What would be the transmission capacity growth rate track for solar power plants & estimating the deficiency track ?
  • What would be the transmission capacity growth rate track for wind power plants & estimating the deficiency track ?
  • What would be the growth in inter regional transmission capacity till 2022 ?
  • What would be the growth track of substations and HVDC terminals till 2022 ?
Key Highlights:
  • Growth rate required for transmission capacity as per Generation capacity- cumulative and on Pan India basis & Deficiency Track
  • PGCIL growth numbers and projected network capacity addition: Assessing the deficiency track
  • STU’s growth numbers and projected network capacity addition: Assessing the deficiency track
  • Assessing impact trading business case and transmission infra congestion in India
  • Application of high performance network in existing lines : Track of assets
  • Identifying cost structure for players – Estimating state wise track
Growth of Power Transmission System in India: An Overview
Need for additional Transmission Infra: Managing Congestion
Enormity of Grey Area: Deficiency in current Transmission Capacity
Delay Track in Future Capacity Additions
Planned Investments in Capacity Additions and Adverse Spiral Effect: Ensuring True Open Access in India
Planning of Transmission Capacities as per Open Access Transactions
Region Wise and State Wise Transmission Capacity Assessment as per open access trend
Assessing Impact Trading Business case and transmission infra congestion in India
Targeted Planning estimates for STOA/MTOA/LTOA and Power Trading by 2022
Focussing upon Existing and Upcoming Transmission line Upgradation
Technological Application and Innovations in Transmission Line Planning and Execution
Addressing Key Challenges for felicitating Open Access and Trading



More Publications