[email protected] +44 20 8123 2220 (UK) +1 732 587 5005 (US) Contact Us | FAQ |

Operational, Under construction and Planned Thermal Power Projects in India 2016: Status Track of Capacity Addition Pace

June 2016 | 800 pages | ID: OCF5311E9C9EN
Eninrac Consulting Private Limited

US$ 999.00

E-mail Delivery (PDF)

Download PDF Leaflet

Accepted cards
Wire Transfer
Checkout Later
Need Help? Ask a Question
In what could be termed as a remarkable growth for power generation in India, with about 88.5 GW of capacity addition targeted for the 12th FYP, about 97% of it has already been achieved as on May 2016 and the remaining 3% likely to be commissioned soon. Power generation in India is mostly driven by the thermal sources and that too by the coal. About 61% of the total electricity generation in India is solely taken up by coal. It is pertinent to note that of the total 303.08 GW of installed capacity of India estimated on May 2016, coal standalone contributes 186.2 GW of it, which accounts nearly 88% of the total thermal power generation of India. However, the green energy norms and increasing environment concerns have certainly hit the power generation from thermal sources to some extent over the past course of time, but given the soaring electricity demand and to accomplish government’s vision of “Power to All” in India, conventional source of power generation is likely to dominate India’s electricity mix in upcoming years as well.
EXECUTIVE SUMMARY

SEGMENT I: UPCOMING THERMAL POWER PROJECTS IN NORTHERN REGION STATES

1. SNAPSHOT OF POWER GENERATION SCENARIO IN NORTHERN REGION

2. UTTAR PRADESH: SNAPSHOT OF THERMAL POWER GENERATION SCENARIO & UNDERLYING OPPORTUNITY

3. UTTAR PRADESH: UPCOMING THERMAL POWER PROJECTS PROFILE

3.1 Project Overview
  3.1.1 Name of the Project
  3.1.2 Project Owner/Developer
  3.1.3 Fuel Type
    a. Coal
    b. Gas
    c. CCGT
  3.1.4 Plant Type
    a. State
    b. Central
    c. Private
  3.1.3 Bidding Mechanism
  3.1.4 Total Capacity (In MW)
  3.1.5 Units/Phase Wise Capacity (In MW)
  3.1.6 Technology Used
  3.1.7 FYP Coming in
3.2 Project Development Status
  3.2.1 Project Construction Status
  3.2.2 Project PPA Status
  3.2.3 Type of PPA
  3.2.4 Clearance Status
  3.2.5 Latest Developments
  3.2.6 Expected Date of Commissioning
  3.2.7 Equipment Order Status
3.3 Contractor Details for the Project
  3.3.1 EPC Contractor
  3.3.2 BTG OEM
  3.3.2 BoP Contractor
3.4 Fuel and Financial Status
  3.4.1 Fuel Source
  3.4.2 Fuel Providing Company
  3.4.3 FSA Status
  3.4.4 Financial Closure

4. PUNJAB: SNAPSHOT OF THERMAL POWER GENERATION SCENARIO & UNDERLYING OPPORTUNITY

5. PUNJAB: UPCOMING THERMAL POWER PROJECTS PROFILE

5.1 Project Overview
  5.1.1 Name of the Project
  5.1.2 Project Owner Developer
  5.1.3 Fuel Type
    a. Coal
    b. Gas
    c. CCGT
  5.1.3 Plant Type
    a. State
    b. Central
    c. Private
  5.1.4 Bidding Mechanism
  5.1.5 Total Capacity (In MW)
  5.1.6 Units/Phase Wise Capacity (In MW)
  5.1.7 Units/Phase Wise Capacity (In MW)
  5.1.8 Technology Used
5.2 Project Development Status
  5.2.1 Project Construction Status
  5.2.2 Project PPA Status
  5.2.3 Type of PPA
  5.2.4 Clearance Status
  5.2.5 Latest Developments
  5.2.6 Expected Date of Commissioning
  5.2.7 Equipment Order Status
5.3 Contractor Details for the Project
  5.3.1 EPC Contractor
  5.3.2 BTG OEM
  5.3.2 BoP Contractor
5.4 Fuel and Financial Status
  5.4.1 Fuel Source
  5.4.2 Fuel Providing Company
  5.4.3 FSA Status
  5.4.4 Financial Closure

6. HARYANA: SNAPSHOT OF THERMAL POWER GENERATION SCENARIO & UNDERLYING OPPORTUNITY

7. HARYANA: UPCOMING THERMAL POWER PROJECTS PROFILE

7.1 Project Overview
  7.1.1 Name of the Project
  7.1.2 Project Developer/Owner
  7.1.3 Fuel Type
    a. Coal
    b. Gas
    c. CCGT
  7.1.4 Plant Type
    a. State
    b. Central
    c. Private
  7.1.5 Bidding Mechanism
  7.1.6 Total Capacity (In MW)
  7.1.7 Units/Phase Wise Capacity (In MW)
  7.1.8 Technology Used
7.2 Project Development Status
  7.2.1 Project Construction Status
  7.2.2 Project PPA Status
  7.2.3 Type of PPA
  7.2.4 Clearance Status
  7.2.5 Latest Developments
  7.2.6 Expected Date of Commissioning
  7.2.7 Equipment Order Status
7.3 Contractor Details for the Project
  7.3.1 EPC Contractor
  7.3.2 BTG OEM
  7.3.2 BoP Contractor
7.4 Fuel and Financial Status
  7.4.1 Fuel Source
  7.4.2 Fuel Providing Company
  7.4.3 FSA Status
  7.4.4 Financial Closure

8. RAJASTHAN: SNAPSHOT OF THERMAL POWER GENERATION SCENARIO & UNDERLYING OPPORTUNITY

9. RAJASTHAN: UPCOMING THERMAL POWER PROJECTS PROFILE

9.1 Project Overview
  9.1.1 Name of the Project
  9.1.2 Project Developer/Owner
  9.1.1 Fuel Type
    a. Coal
    b. Gas
    c. CCGT
  9.1.2 Plant Type
    a. State
    b. Central
    c. Private
  9.1.3 Bidding Mechanism
  9.1.4 Total Capacity (In MW)
  9.1.5 Units/Phase Wise Capacity (In MW)
  9.1.6 Units/Phase Wise Capacity (In MW)
  9.1.7 Technology Used
9.2 Project Development Status
  9.2.1 Project Construction Status
  9.2.2 Project PPA Status
  9.2.3 Type of PPA
  9.2.4 Clearance Status
  9.2.5 Latest Developments
  9.2.6 Expected Date of Commissioning
  9.2.7 Equipment Order Status
9.3 Contractor Details for the Project
  9.3.1 EPC Contractor
  9.3.2 BTG OEM
  9.3.2 BoP Contractor
9.4 Fuel and Financial Status
  9.4.1 Fuel Source
  9.4.2 Fuel Providing Company
  9.4.3 FSA Status
  9.4.4 Financial Closure

SEGMENT II: UPCOMING THERMAL POWER PROJECTS IN EASTERN REGION STATES

1. SNAPSHOT OF POWER GENERATION SCENARIO IN EASTERN REGION

2. BIHAR: SNAPSHOT OF THERMAL POWER GENERATION SCENARIO & UNDERLYING OPPORTUNITY

3. BIHAR: UPCOMING THERMAL POWER PROJECTS PROFILE

3.1 Project Overview
  3.1.1 Name of the Project
  3.1.2 Project Developer/ Owner
  3.1.1 Fuel Type
    a. Coal
    b. Gas
    c. CCGT
  3.1.2 Plant Type
    a. State
    b. Central
    c. Private
  3.1.3 Bidding Mechanism
  3.1.4 Total Capacity (In MW)
  3.1.5 Units/ Phase Wise Capacity (In MW)
  3.1.9 Technology Used
  3.1.10 FYP Coming in
3.2 Project Development Status
  3.2.1 Project Construction Status
  3.2.2 Project PPA Status
  3.2.3 Type of PPA
  3.2.4 Clearance Status
  3.2.5 Latest Developments
  3.2.6 Expected Date of Commissioning
  3.2.7 Equipment Order Status
3.3 Contractor Details for the Project
  3.3.1 EPC Contractor
  3.3.2 BTG OEM
  3.3.2 BoP Contractor
3.4 Fuel and Financial Status
  3.4.1 Fuel Source
  3.4.2 Fuel Providing Company
  3.4.3 FSA Status
  3.4.4 Financial Closure

4. JHARKHAND: SNAPSHOT OF THERMAL POWER GENERATION SCENARIO & UNDERLYING OPPORTUNITY

5. JHARKHAND: UPCOMING THERMAL POWER PROJECTS PROFILE

5.1 Project Overview
  5.1.1 Project Name
  5.1.2 Project Developer/ Owner
  5.1.3 Fuel Type
    a. Coal
    b. Gas
    c. CCGT
  5.1.4 Plant Type
    a. State
    b. Central
    c. Private
  5.1.4 Bidding Mechanism
  5.1.5 Total Capacity (In MW)
  5.1.6 Units/ Phase Wise Capacity (In MW)
  5.1.7 Technology Used
5.2 Project Development Status
  5.2.1 Project Construction Status
  5.2.2 Project PPA Status
  5.2.3 Type of PPA
  5.2.4 Clearance Status
  5.2.5 Latest Developments
  5.2.6 Expected Date of Commissioning
  5.2.7 Equipment Order Status
5.3 Contractor Details for the Project
  5.3.1 EPC Contractor
  5.3.2 BTG OEM
  5.3.2 BoP Contractor
5.4 Fuel and Financial Status
  5.4.1 Fuel Source
  5.4.2 Fuel Providing Company
  5.4.3 FSA Status
  5.4.4 Financial Closure

6. JHARKHAND: SNAPSHOT OF THERMAL POWER GENERATION SCENARIO & UNDERLYING OPPORTUNITY

7. JHARKHAND: UPCOMING THERMAL POWER PROJECTS PROFILE

7.1 Project Overview
  7.1.1 Name of the Project
  7.1.2 Project Developer/ Owner
  7.1.3 Fuel Type
    a. Coal
    b. Gas
    c. CCGT
  7.1.4 Plant Type
    a. State
    b. Central
    c. Private
  7.1.5 Bidding Mechanism
  7.1.6 Total Capacity (In MW)
  7.1.7 Units/ Phase Wise Capacity (In MW)
  7.1.8 Technology Used
7.2 Project Development Status
  7.2.1 Project Construction Status
  7.2.2 Project PPA Status
  7.2.3 Type of PPA
  7.2.4 Clearance Status
  7.2.5 Latest Developments
  7.2.6 Expected Date of Commissioning
  7.2.7 Equipment Order Status
7.3 Contractor Details for the Project
  7.3.1 EPC Contractor
  7.3.2 BTG OEM
  7.3.2 BoP Contractor
7.4 Fuel and Financial Status
  7.4.1 Fuel Source
  7.4.2 Fuel Providing Company
  7.4.3 FSA Status
  7.4.4 Financial Closure

8. WEST BENGAL: SNAPSHOT OF THERMAL POWER GENERATION SCENARIO & UNDERLYING OPPORTUNITY

9. WEST BENGAL: UPCOMING THERMAL POWER PROJECTS PROFILE

9.1 Project Overview
  9.1.1 Name of the Project
  9.1.2 Project Developer/ Owner
  9.1.3 Fuel Type
    a. Coal
    b. Gas
    c. CCGT
  9.1.4 Plant Type
    a. State
    b. Central
    c. Private
  9.1.5 Bidding Mechanism
  9.1.6 Total Capacity (In MW)
  9.1.7 Units/ Phase Wise Capacity (In MW)
  9.1.8 Technology Used
9.2 Project Development Status
  9.2.1 Project Construction Status
  9.2.2 Project PPA Status
  9.2.3 Type of PPA
  9.2.4 Clearance Status
  9.2.5 Latest Developments
  9.2.6 Expected Date of Commissioning
  9.2.7 Equipment Order Status
9.3 Contractor Details for the Project
  9.3.1 EPC Contractor
  9.3.2 BTG OEM
  9.3.2 BoP Contractor
9.4 Fuel and Financial Status
  9.4.1 Fuel Source
  9.4.2 Fuel Providing Company
  9.4.3 FSA Status
  9.4.4 Financial Closure

10. ODISHA: SNAPSHOT OF THERMAL POWER GENERATION SCENARIO AND UNDERLYING OPPORTUNITY

11. ODISHA: UPCOMING THERMAL POWER PROJECTS PROFILE

11.1 Project Overview
  11.1.1 Name of the Project
  11.1.2 Project Developer/ Owner
  11.1.3 Fuel Type
    a. Coal
    b. Gas
    c. CCGT
  11.1.4 Plant Type
    a. State
    b. Central
    c. Private
  11.1.5 Bidding Mechanism
  11.1.6 Total Capacity (In MW)
  11.1.7 Units/ Phase Wise Capacity (In MW)
  11.1.8 Technology Used
11.2 Project Development Status
  11.2.1 Project Construction Status
  11.2.2 Project PPA Status
  11.2.3 Type of PPA
  11.2.4 Clearance Status
  11.2.5 Latest Developments
  11.2.6 Expected Date of Commissioning
  11.2.7 Equipment Order Status
11.3 Contractor Details for the Project
  11.3.1 EPC Contractor
  11.3.2 BTG OEM
  11.3.2 BoP Contractor
11.4 Fuel and Financial Status
  11.4.1 Fuel Source
  11.4.2 Fuel Providing Company
  11.4.3 FSA Status
  11.4.4 Financial Closure

SEGMENT III: UPCOMING THERMAL POWER PROJECTS IN WESTERN REGION STATES

1. SNAPSHOT OF POWER GENERATION SCENARIO IN WESTERN REGION

2. MAHARASHTRA: SNAPSHOT OF THERMAL POWER GENERATION SCENARIO & UNDERLYING OPPORTUNITY

3. MAHARASHTRA: UPCOMING THERMAL POWER PROJECTS PROFILE

3.1 Project Overview
  3.1.1 Name of the Project
  3.1.2 Project Developer/ Owner
  3.1.3 Fuel Type
    a. Coal
    b. Gas
    c. CCGT
  3.1.4 Plant Type
    a. State
    b. Central
    c. Private
  3.1.5 Bidding Mechanism
  3.1.6 Total Capacity (In MW)
  3.1.7 Units/ Phase Wise Capacity (In MW)
  3.1.9 Technology Used
  3.1.10 FYP Coming in
3.2 Project Development Status
  3.2.1 Project Construction Status
  3.2.2 Project PPA Status
  3.2.3 Type of PPA
  3.2.4 Clearance Status
  3.2.5 Latest Developments
  3.2.6 Expected Date of Commissioning
  3.2.7 Equipment Order Status
3.3 Contractor Details for the Project
  3.3.1 EPC Contractor
  3.3.2 BTG OEM
  3.3.2 BoP Contractor
3.4 Fuel and Financial Status
  3.4.1 Fuel Source
  3.4.2 Fuel Providing Company
  3.4.3 FSA Status
  3.4.4 Financial Closure

4. MADHYA PRADESH: SNAPSHOT OF THERMAL POWER GENERATION SCENARIO & UNDERLYING OPPORTUNITY

5. MADHYA PRADESH: UPCOMING THERMAL POWER PROJECTS PROFILE

5.1 Project Overview
  5.1.1 Name of the Project
  5.1.2 Project Developer/Owner
  5.1.3 Fuel Type
    a. Coal
    b. Gas
    c. CCGT
  5.1.4 Plant Type
    a. State
    b. Central
    c. Private
  5.1.5 Bidding Mechanism
  5.1.6 Total Capacity (In MW)
  5.1.7 Units/ Phase Wise Capacity (In MW)
  5.1.8 Technology Used
5.2 Project Development Status
  5.2.1 Project Construction Status
  5.2.2 Project PPA Status
  5.2.3 Type of PPA
  5.2.4 Clearance Status
  5.2.5 Latest Developments
  5.2.6 Expected Date of Commissioning
  5.2.7 Equipment Order Status
5.3 Contractor Details for the Project
  5.3.1 EPC Contractor
  5.3.2 BTG OEM
  5.3.2 BoP Contractor
5.4 Fuel and Financial Status
  5.4.1 Fuel Source
  5.4.2 Fuel Providing Company
  5.4.3 FSA Status
  5.4.4 Financial Closure

6. CHHATTISGARH: SNAPSHOT OF THERMAL POWER GENERATION SCENARIO & UNDERLYING OPPORTUNITY

7. CHHATTISGARH: UPCOMING THERMAL POWER PROJECTS PROFILE

7.1 Project Overview
  7.1.1 Fuel Type
    a. Coal
    b. Gas
    c. CCGT
  7.1.2 Plant Type
    a. State
    b. Central
    c. Private
  7.1.3 Bidding Mechanism
  7.1.4 Total Capacity (In MW)
  7.1.5 Units/ Phase Wise Capacity (In MW)
  7.1.8 Technology Used
7.2 Project Development Status
  7.2.1 Project Construction Status
  7.2.2 Project PPA Status
  7.2.3 Type of PPA
  7.2.4 Clearance Status
  7.2.5 Latest Developments
  7.2.6 Expected Date of Commissioning
  7.2.7 Equipment Order Status
7.3 Contractor Details for the Project
  7.3.1 EPC Contractor
  7.3.2 BTG OEM
  7.3.2 BoP Contractor
7.4 Fuel and Financial Status
  7.4.1 Fuel Source
  7.4.2 Fuel Providing Company
  7.4.3 FSA Status
  7.4.4 Financial Closure

8. GUJARAT: SNAPSHOT OF THERMAL POWER GENERATION SCENARIO & UNDERLYING OPPORTUNITY

9. GUJARAT: UPCOMING THERMAL POWER PROJECTS PROFILE

9.1 Project Overview
  9.1.1 Fuel Type
    a. Coal
    b. Gas
    c. CCGT
  9.1.2 Plant Type
    a. State
    b. Central
    c. Private
  9.1.3 Bidding Mechanism
  9.1.4 Total Capacity (In MW)
  9.1.5 Units/ Phase Wise Capacity (In MW)
  9.1.6 Bidding Mechanism
  9.1.7 Total Capacity (In MW)
  9.1.8 Units/ Phase Wise Capacity (In MW)
  9.1.9 Technology Used
9.2 Project Development Status
  9.2.1 Project Construction Status
  9.2.2 Project PPA Status
  9.2.3 Type of PPA
  9.2.4 Clearance Status
  9.2.5 Latest Developments
  9.2.6 Expected Date of Commissioning
  9.2.7 Equipment Order Status
9.3 Contractor Details for the Project
  9.3.1 EPC Contractor
  9.3.2 BTG OEM
  9.3.2 BoP Contractor
9.4 Fuel and Financial Status
  9.4.1 Fuel Source
  9.4.2 Fuel Providing Company
  9.4.3 FSA Status
  9.4.4 Financial Closure

SEGMENT IV: UPCOMING THERMAL POWER PROJECTS IN SOUTHERN REGION STATES

1. SNAPSHOT OF POWER GENERATION SCENARIO IN SOUTHERN REGION

2. ANDHRA PRADESH: SNAPSHOT OF THERMAL POWER GENERATION SCENARIO & UNDERLYING OPPORTUNITY

3. ANDHRA PRADESH: UPCOMING THERMAL POWER PROJECTS PROFILE

3.1 Project Overview
  3.1.1 Fuel Type
    a. Coal
    b. Gas
    c. CCGT
  3.1.2 Plant Type
    a. State
    b. Central
    c. Private
  3.1.3 Bidding Mechanism
  3.1.4 Total Capacity (In MW)
  3.1.5 Units/ Phase Wise Capacity (In MW)
  3.1.6 Bidding Mechanism
  3.1.7 Total Capacity (In MW)
  3.1.8 Units/ Phase Wise Capacity (In MW)
  3.1.9 Technology Used
  3.1.10 FYP Coming in
3.2 Project Development Status
  3.2.1 Project Construction Status
  3.2.2 Project PPA Status
  3.2.3 Type of PPA
  3.2.4 Clearance Status
  3.2.5 Latest Developments
  3.2.6 Expected Date of Commissioning
  3.2.7 Equipment Order Status
3.3 Contractor Details for the Project
  3.3.1 EPC Contractor
  3.3.2 BTG OEM
  3.3.2 BoP Contractor
3.4 Fuel and Financial Status
  3.4.1 Fuel Source
  3.4.2 Fuel Providing Company
  3.4.3 FSA Status
  3.4.4 Financial Closure

4. TELANGANA: SNAPSHOT OF THERMAL POWER GENERATION SCENARIO & UNDERLYING OPPORTUNITY

5. TELANGANA: UPCOMING THERMAL POWER PROJECTS PROFILE

5.1 Project Overview
  5.1.1 Fuel Type
    a. Coal
    b. Gas
    c. CCGT
  5.1.2 Plant Type
    a. State
    b. Central
    c. Private
  5.1.3 Bidding Mechanism
  5.1.4 Total Capacity (In MW)
  5.1.5 Units/ Phase Wise Capacity (In MW)
  5.1.6 Bidding Mechanism
  5.1.7 Total Capacity (In MW)
  5.1.8 Units/ Phase Wise Capacity (In MW)
  5.1.9 Technology Used
5.2 Project Development Status
  5.2.1 Project Construction Status
  5.2.2 Project PPA Status
  5.2.3 Type of PPA
  5.2.4 Clearance Status
  5.2.5 Latest Developments
  5.2.6 Expected Date of Commissioning
  5.2.7 Equipment Order Status
5.3 Contractor Details for the Project
  5.3.1 EPC Contractor
  5.3.2 BTG OEM
  5.3.2 BoP Contractor
5.4 Fuel and Financial Status
  5.4.1 Fuel Source
  5.4.2 Fuel Providing Company
  5.4.3 FSA Status
  5.4.4 Financial Closure

6. TAMIL NADU: SNAPSHOT OF THERMAL POWER GENERATION SCENARIO & UNDERLYING OPPORTUNITY

7. TAMIL NADU: UPCOMING THERMAL POWER PROJECTS PROFILE

7.1 Project Overview
  7.1.1 Fuel Type
    a. Coal
    b. Gas
    c. CCGT
  7.1.2 Plant Type
    a. State
    b. Central
    c. Private
  7.1.3 Bidding Mechanism
  7.1.4 Total Capacity (In MW)
  7.1.5 Units/ Phase Wise Capacity (In MW)
  7.1.6 Bidding Mechanism
  7.1.7 Total Capacity (In MW)
  7.1.8 Units/ Phase Wise Capacity (In MW)
  7.1.9 Technology Used
7.2 Project Development Status
  7.2.1 Project Construction Status
  7.2.2 Project PPA Status
  7.2.3 Type of PPA
  7.2.4 Clearance Status
  7.2.5 Latest Developments
  7.2.6 Expected Date of Commissioning
  7.2.7 Equipment Order Status
7.3 Contractor Details for the Project
  7.3.1 EPC Contractor
  7.3.2 BTG OEM
  7.3.2 BoP Contractor
7.4 Fuel and Financial Status
  7.4.1 Fuel Source
  7.4.2 Fuel Providing Company
  7.4.3 FSA Status
  7.4.4 Financial Closure

8. KARNATAKA: SNAPSHOT OF THERMAL POWER GENERATION SCENARIO & UNDERLYING OPPORTUNITY

9. KARNATAKA: UPCOMING THERMAL POWER PROJECTS PROFILE

9.1 Project Overview
  9.1.1 Fuel Type
    a. Coal
    b. Gas
    c. CCGT
  9.1.2 Plant Type
    a. State
    b. Central
    c. Private
  9.1.3 Bidding Mechanism
  9.1.4 Total Capacity (In MW)
  9.1.5 Units/ Phase Wise Capacity (In MW)
  9.1.6 Bidding Mechanism
  9.1.7 Total Capacity (In MW)
  9.1.8 Units/ Phase Wise Capacity (In MW)
  9.1.9 Technology Used
9.2 Project Development Status
  9.2.1 Project Construction Status
  9.2.2 Project PPA Status
  9.2.3 Type of PPA
  9.2.4 Clearance Status
  9.2.5 Latest Developments
  9.2.6 Expected Date of Commissioning
  9.2.7 Equipment Order Status
9.3 Contractor Details for the Project
  9.3.1 EPC Contractor
  9.3.2 BTG OEM
  9.3.2 BoP Contractor
9.4 Fuel and Financial Status
  9.4.1 Fuel Source
  9.4.2 Fuel Providing Company
  9.4.3 FSA Status
  9.4.4 Financial Closure

SEGMENT V: UPCOMING ULTRA MEGA POWER PROJECTS IN INDIA (REGION WISE STATUS OF IN PIPELINE PROJECTS)

1. STATUS /DETAILS OF PLANNED UMPPS IN NORTHERN REGION

2. STATUS /DETAILS OF PLANNED UMPPS IN EASTERN REGION

3. STATUS /DETAILS OF PLANNED UMPPS IN WESTERN REGION

4. STATUS /DETAILS OF PLANNED UMPPS IN SOUTHERN REGION


More Publications