[email protected] +44 20 8123 2220 (UK) +1 732 587 5005 (US) Contact Us | FAQ |

Boiler Turbine Generator Equipment Market Dynamics and Outlook for Thermal Power in India- 2017

May 2017 | 300 pages | ID: B80374B84B4EN
Eninrac Consulting Private Limited

US$ 1,199.00

E-mail Delivery (PDF)

Download PDF Leaflet

Accepted cards
Wire Transfer
Checkout Later
Need Help? Ask a Question
India’s current installed capacity of 315 GW has still a fair share of thermal power plants based on coal which accounts for sufficing the base load of the country. Although, India is cognitive of the global trend of gradually wishing away with polluting source of coal based electricity generation , but completely stripping of these capacities shall not be possible for one of the fastest growing economies of the world. Given, the estimate even if we consider India to grow by a normative 7% as an economy, the need of growth in infrastructural development shall also be of the same order. Hence, despite country’s Paris commitment to reduce carbon influx, India has to be dependent on coal till 2030 for meeting of its consistent base load .

As country, shifts its portfolio from thermal to renewable in terms of capacity generation , the transcend also observed in terms of investment in the thermal and renewable space respectively. With India, completely witnessing drying up of orders from private project developers , the thermal power generation looks to be a dicey proposition for OEMs in the country. With fresh capacities only coming from either NTPC or SEBs in terms of new order , the current BTG equipment market look highly hinged in the favor of domestic OEMs, the fate of other bulk investments by big global OEMs looms large in dark. In this regard, it was quint essential to spot the silver lining in the current dynamics of thermal power generation for the OEMs to sustain and develop their respective business model. The DCR proposition and strict PMP obligation to be followed for NTPC’s and SEB’s PPs , road appears tough for those OEMs which donot manufacturing capacity installed in the country.


CHAPTER 1. EXECUTIVE SUMMARY

CHAPTER 2. BALANCE OF PLANT EQUIPMENT FOR TPP MARKET STRUCTURE IN INDIA

2.1 Market Structure
2.2 Rate of Construction for Fresh TTP in India
2.3 Opportunity in terms of modernisation of Ageing Units- Overview

CHAPTER 3: BTG MARKET DRIVERS AND IMPACTS: 2017-2022

3.1 Capacity Demand Supply Dynamics- BOP Perspective
3.2 Balance of RE & Thermal Power- Base Load Balancing- BoP Perspective
3.3 Fuel Availability & Impact- BoP Perspective
3.4 Super Critical Units- Planned Capacity Addition

CHAPTER 4: BOP MARKET SIZE IN INDIA- FACTORED ANALYSIS OF MARKET DYNAMICS

4.1 Market Size in INR
4.2 Market Size by Volume
4.3 Region Wise Size Break Up
4.4 Consumer Category Wise Market Size
4.5 Supplier-wise Market Size

CHAPTER 5: REGIONAL ANALYSIS OF BOP MARKET FOR THERMAL POWER PLANT IN INDIA

5.1 Region Wise Market Share aligned in MW
5.2 Region Wise Market Share by Players (Existing & Upcoming Units)
5.3 Region Wise Market Share in INR

CHAPTER 6: BOP MARKET SHARE ANALYSIS

6.1 Domestic Players
6.2 Foreign Players

CHAPTER 7: BOP MECHANICAL PACKAGE- FUTURE OUTLOOK

7.1 Cooling Water System
7.2 Water Treatment System
7.3 Fuel/Material Handling System
  Ash Handling System
  Coal Handling System

1 CHAPTER 8: BOP ELECTRICAL, CONTROL & INSTRUMENTATION PACKAGE- FUTURE OUTLOOK

8.1 Plant Electrical system, Switchyards etc.
8.2 Transformers
8.3 Complete Control & Instrumentation System (inclusive SCADA)
8.4 HT,LT Switchgears & Bus ducts

CHAPTER 9: BOP CIVIL WORKS PACKAGE: FUTURE OUTLOOK

9.1 Foundation of Boilers, Turbine & Air Cooled Condenser
9.2 Cooling Towers & Chimneys
9.3 Reservoir & Intake Systems
9.4 Sewage Disposal

CHAPTER 10: COMPETITIVE BENCHMARKING ANALYSIS

10.1 Quality Indexation
10.2 Price Variance
10.3 Post Sale Services

1 CHAPTER 11: SWOT ANALYSIS: KEY PLAYERS

11.1 Tecpro
11.2 L&T
11.3 Elecon Engineering
11.4 ThyssenKrupp
11.5 TRF Limited
11.6 Indure
11.7 Macawber Beekay
11.8 Mc Nally Bharat
11.9 Paharpur Cooling Tower Limited
11.10 Gammon India
11.11 Thermax
11.12 SPML

CHAPTER 12: PROFILING OF KEY PLAYERS (INDICATIVE LIST)

  a. Turnkey Capabilities
    I. Techpro
    I. L&T
    III. SPML
    IV. ThyssenKrupp
    V. TRF
    VI. Indure
    VII. Macawber Beekay
  b. Coal Handling & Ash Handling System
    I. Mc Nally Bharat
    II. Elecon Engineering
  c. Water Treatment Plant
    I. Driplex Water Engineering
    II. Doshion Exchange
    III. Ion Exchange
    IV. Triveni
    V. Thermax
  d. Cooling Tower
    I. Paharpur Cooling Tower Limited
    II. Gammon India
    III. BGR
    IV. NBCC

CHAPTER 13: CONCLUSION & FINDINGS


More Publications